Solar Installers in Amravati

18 verified rooftop solar installers in Amravati, Maharashtra. PM-Surya Ghar subsidy (up to ₹78,000) + state net-metering apply. Updated May 2026.

GD Solar Power - Solar Company in Amravati

★ 5.0 (26)

Paras Avenue Appt, Shegaon - Rahatgaon Rd, near Kewal colony, above SBI ATM, Sonal Colony, Arjun Nagar, Amravati, Maharashtra 444604, India

WE SOLAR SYSTEM

★ 5.0 (17)

26-A, Mahadev Khori Rd, near New Bypass, Prabhu Colony, Juni Kotwali, Amravati, Maharashtra 444606, India

Charvi green solar service

★ 5.0 (13)

Shri Nathwadi, behind h.v.p.m, Amravati, Maharashtra 444605, India

SES SOLAR NETWORK

★ 5.0 (12)

House No. 26, Garden Amravati, Krushak Colony Rd Number 1, Prashant Nagar, Savata Colony, Wadali Naka, Amravati, Maharashtra 444606, India

A2 Solar Tech

★ 5.0 (5)

B-59, Badnera Rd, near Shri Eccha Marbal, New Sturna Nagar, Industrial Estate, Saturna, Amravati, Maharashtra 444607, India

Arihant Solar Energy

★ 5.0 (5)

Hare Krishna Colony, Mahavir Nagar, Gopal Nagar, Amravati, Maharashtra 444607, India

Shyam solar cleaning service

★ 4.8 (34)

Deshpande Plot, Badnera Rd, near Sadguru Kirana, Gopal Nagar, Amravati, Maharashtra 444607, India

Sarnil Solar Pvt. Ltd.

★ 4.8 (29)

Shop No-2, Aditya Heights, near Podar Jumbo School, Amravati, Maharashtra 444604, India

Frequently asked questions

How much does rooftop solar cost in Amravati?

A 3kW residential system in Amravati typically runs ₹1.6-2.2 lakh before subsidy, ₹85k-1.4 lakh after PM-Surya Ghar (₹78k subsidy). 5kW systems land around ₹3 lakh net. Payback at current Maharashtra tariffs: 4-6 years.

Does my electricity board support net-metering?

Yes — all Maharashtra DISCOMs are mandated to offer bi-directional net-metering for residential rooftop solar under MNRE guidelines. The installer handles meter swap + DISCOM paperwork (typically 2-4 weeks).

How long does installation take?

Once site survey + approvals are done, a 3kW system installs in 2-3 days, 5kW in 3-5 days. Total timeline from booking to commissioning is typically 4-8 weeks in Amravati, mostly waiting on DISCOM net-meter approval.

Related

Chat with us