Solar Installers in Sangli

10 verified rooftop solar installers in Sangli, Maharashtra. PM-Surya Ghar subsidy (up to ₹78,000) + state net-metering apply. Updated May 2026.

Sindhuraj Solar panel

★ 5.0 (22)

Dadasaheb Patil Marg, Plot No. 2, 100 Feet Rd, Sangli, Vasantnagar, Sangli Miraj Kupwad, Maharashtra 416436, India

SUNEARTH SOLAR ENERGY SYSTEM

★ 5.0 (20)

Shop No. 3, Shree Gajanan-Sarswati Sankul, 1503, Panchamukhi Maruti Rd, Sangli, Patrakar Nagar, Sangli Miraj Kupwad, Maharashtra 416416, India

TATA POWER SOLAR SANJYOT ENTERPRISES

★ 5.0 (11)

Flat No 3 First Floor, Siddhanath Sadanika, Pushparaj Chowk, opp. Hotel Woodhouse, Sangli, Nishant Colony, Sangli Miraj Kupwad, Maharashtra 416416, India

Shree sadguru solar system

★ 5.0 (3)

Sangli islampur, shivshambo chowk, new, bypass road, Sangli, Sangli Miraj Kupwad, Maharashtra 416416, India

Tulsi Solar

★ 4.8 (22)

Tulsi Solar, Rockel Line, near Dr.Kanti Shah Hospital, behind Ganesh Market, Sangli, Vakhar Bhag, Sangli Miraj Kupwad, Maharashtra 416416, India

Subhadra Enterprises ( TATA SOLAR ) Sangli

★ 4.8 (6)

Flat No.202, Vastushree Apartment, 100 Feet Rd, near Chetana Petrol Pump, Sangli, Nishant Colony, Sangli Miraj Kupwad, Maharashtra 416416, India

Apollo solar

★ 4.0 (3)

Old Budhgaon Rd, near Railway Gate, Sangli, Vikas nagar, Sangli Miraj Kupwad, Maharashtra 416416, India

Frequently asked questions

How much does rooftop solar cost in Sangli?

A 3kW residential system in Sangli typically runs ₹1.6-2.2 lakh before subsidy, ₹85k-1.4 lakh after PM-Surya Ghar (₹78k subsidy). 5kW systems land around ₹3 lakh net. Payback at current Maharashtra tariffs: 4-6 years.

Does my electricity board support net-metering?

Yes — all Maharashtra DISCOMs are mandated to offer bi-directional net-metering for residential rooftop solar under MNRE guidelines. The installer handles meter swap + DISCOM paperwork (typically 2-4 weeks).

How long does installation take?

Once site survey + approvals are done, a 3kW system installs in 2-3 days, 5kW in 3-5 days. Total timeline from booking to commissioning is typically 4-8 weeks in Sangli, mostly waiting on DISCOM net-meter approval.

Related

Chat with us