Solar Installers in Erode

15 verified rooftop solar installers in Erode, Tamil Nadu. PM-Surya Ghar subsidy (up to ₹78,000) + state net-metering apply. Updated May 2026.

Groena Solar Private limited

★ 5.0 (62)

2nd Floor, Lakshmi Complex, 67/1, Gandhiji Rd, near Kalaimaadu Silai Roundana, Periyar Nagar, Erode, Tamil Nadu 638001, India

Santec Solar Pvt Ltd

★ 5.0 (10)

190/A/1, Bharathi Nagar, Moolapalayam, Erode, Tamil Nadu 638002, India

Santec Solar Pvt Ltd

★ 5.0 (6)

Nandhanam illam, 190/A/2, Bharathi Nagar, Moolapalayam, Erode, Tamil Nadu 638002, India

PRIME SOLAR

★ 4.9 (43)

5, Gandhi Nagar, opposite Giri micro Lab, Erode, Tamil Nadu 638009, India

Keerthi Solar Energy Solution

★ 4.9 (36)

3, Annai complex, Rail Nagar, Rangampalayam, Erode, Tamil Nadu 638009, India

Stepup solar solutions

★ 4.7 (18)

16, Deva street, Jaganathapuram Colony, Surampatty, Erode, Tamil Nadu 638009, India

Sky Solar’s

★ 4.6 (18)

L102, Periyar Nagar, Erode, Tamil Nadu 638001, India

Green Spark Solar Energy

★ 4.4 (16)

64 A, Madikarar Colony, Vettukattuvalasu, Erode, Tamil Nadu 638012, India

OSCAR SOLAR PUMP

★ 4.3 (15)

a.s.c complex, 1st Street, Nachiappa Rd, Sub Line, Erode Fort, Erode, Tamil Nadu 638001, India

Frequently asked questions

How much does rooftop solar cost in Erode?

A 3kW residential system in Erode typically runs ₹1.6-2.2 lakh before subsidy, ₹85k-1.4 lakh after PM-Surya Ghar (₹78k subsidy). 5kW systems land around ₹3 lakh net. Payback at current Tamil Nadu tariffs: 4-6 years.

Does my electricity board support net-metering?

Yes — all Tamil Nadu DISCOMs are mandated to offer bi-directional net-metering for residential rooftop solar under MNRE guidelines. The installer handles meter swap + DISCOM paperwork (typically 2-4 weeks).

How long does installation take?

Once site survey + approvals are done, a 3kW system installs in 2-3 days, 5kW in 3-5 days. Total timeline from booking to commissioning is typically 4-8 weeks in Erode, mostly waiting on DISCOM net-meter approval.

Related

Chat with us