Groena Solar Private limited
2nd Floor, Lakshmi Complex, 67/1, Gandhiji Rd, near Kalaimaadu Silai Roundana, Periyar Nagar, Erode, Tamil Nadu 638001, India
15 verified rooftop solar installers in Erode, Tamil Nadu. PM-Surya Ghar subsidy (up to ₹78,000) + state net-metering apply. Updated May 2026.
2nd Floor, Lakshmi Complex, 67/1, Gandhiji Rd, near Kalaimaadu Silai Roundana, Periyar Nagar, Erode, Tamil Nadu 638001, India
33, Periyannan St, near Kalyan Silks, Sait Colony, Erode, Tamil Nadu 638001, India
The Chellammal Agency, 002/1, MunicipalColony 1st St, near Kalyana Vinayagar kovil, Municipal Colony, Muncipal Colony, Erode, Tamil Nadu 638004, India
190/A/1, Bharathi Nagar, Moolapalayam, Erode, Tamil Nadu 638002, India
43,Vinayagar kovil street, Karungalpalayam, Erode – 638 003, Ramamoorthy Nagar, Erode, Tamil Nadu 638003, India
Nandhanam illam, 190/A/2, Bharathi Nagar, Moolapalayam, Erode, Tamil Nadu 638002, India
10, Prasanth Street, Edayankattuvalasu, Manikampalayam Housing Unit, Erode, Tamil Nadu 638011, India
5, Gandhi Nagar, opposite Giri micro Lab, Erode, Tamil Nadu 638009, India
3, Annai complex, Rail Nagar, Rangampalayam, Erode, Tamil Nadu 638009, India
Periya Semur, Erode, Tamil Nadu 638004, India
3, Kulanthaiyammal street, Veerappanchatram, Erode, Tamil Nadu 638004, India
16, Deva street, Jaganathapuram Colony, Surampatty, Erode, Tamil Nadu 638009, India
L102, Periyar Nagar, Erode, Tamil Nadu 638001, India
64 A, Madikarar Colony, Vettukattuvalasu, Erode, Tamil Nadu 638012, India
a.s.c complex, 1st Street, Nachiappa Rd, Sub Line, Erode Fort, Erode, Tamil Nadu 638001, India
A 3kW residential system in Erode typically runs ₹1.6-2.2 lakh before subsidy, ₹85k-1.4 lakh after PM-Surya Ghar (₹78k subsidy). 5kW systems land around ₹3 lakh net. Payback at current Tamil Nadu tariffs: 4-6 years.
Yes — all Tamil Nadu DISCOMs are mandated to offer bi-directional net-metering for residential rooftop solar under MNRE guidelines. The installer handles meter swap + DISCOM paperwork (typically 2-4 weeks).
Once site survey + approvals are done, a 3kW system installs in 2-3 days, 5kW in 3-5 days. Total timeline from booking to commissioning is typically 4-8 weeks in Erode, mostly waiting on DISCOM net-meter approval.