Solar Installers in Gorakhpur

20 verified rooftop solar installers in Gorakhpur, Uttar Pradesh. PM-Surya Ghar subsidy (up to ₹78,000) + state net-metering apply. Updated May 2026.

Janaki Enterprises Solar Gorakhpur

★ 5.0 (131)

Bhagat Chauraha, Rampur, Taramandal Rd, behind Hotel Prince Previous Address, Budh Vihar Colony, Gorakhpur, Uttar Pradesh 273016, India

Tatsavi Solar Pvt Ltd

★ 5.0 (11)

First Floor, Sunduli Benduli Road, Parshuram Nagar Colony, Rustampur, Budh Vihar Colony, Gorakhpur, Uttar Pradesh 273016, India

Usha Shriram Solar - Aditya Solar Shop

★ 5.0 (4)

Health Officer Building, Townhall Road, New Female Hospital, Park Rd, nearby 100 Beds, VindyaVasini Nagar, Gorakhpur, Uttar Pradesh 273001, India

S N solar power

★ 4.9 (91)

2nd floor,Sher Kothi complex, Buxipur Rd, in front of M. S.I Inter College, Avas Vikas Colony, Miyan Baza, Gorakhpur, Uttar Pradesh 273001, India

Vortex Solar Energy Pvt Ltd

★ 4.9 (58)

2nd Floor, Ramalya Apartment, Gehuan Sagar Rd, Budh Vihar Colony, Kajakpur, Gorakhpur, Uttar Pradesh 273016, India

vansaflick solar panel cleaning

★ 4.9 (32)

A Singh's ram raj villa, c-133/566, near daroga maszid, beside lane of qwality ice cream factory, Ashok Nagar Colony, North Humayunpur, Gorakhpur, Uttar Pradesh 273001, India

S-Tech Solar Solution

★ 4.9 (7)

849/O, Power House Road, Road, Charfatak, Mohaddipur, Gorakhpur, Uttar Pradesh 273008, India

Shriram Solar System

★ 4.8 (46)

Deoria Bypass, Tiraha, Deoria Rd, near Nayara Petrol Pump, Rapti Nagar Phase-4, Gorakhpur, Uttar Pradesh 273010, India

Purvanchal Solar

★ 4.1 (65)

Nanda Nagar gokulpuram, near air force station, Nanda Nagar, Gorakhpur, Uttar Pradesh 273008, India

Frequently asked questions

How much does rooftop solar cost in Gorakhpur?

A 3kW residential system in Gorakhpur typically runs ₹1.6-2.2 lakh before subsidy, ₹85k-1.4 lakh after PM-Surya Ghar (₹78k subsidy). 5kW systems land around ₹3 lakh net. Payback at current Uttar Pradesh tariffs: 4-6 years.

Does my electricity board support net-metering?

Yes — all Uttar Pradesh DISCOMs are mandated to offer bi-directional net-metering for residential rooftop solar under MNRE guidelines. The installer handles meter swap + DISCOM paperwork (typically 2-4 weeks).

How long does installation take?

Once site survey + approvals are done, a 3kW system installs in 2-3 days, 5kW in 3-5 days. Total timeline from booking to commissioning is typically 4-8 weeks in Gorakhpur, mostly waiting on DISCOM net-meter approval.

Related

Chat with us