MANU SOLAR SYSTEMS
PF Office Rd, opposite AP Grameena Bank, Krishna Nagar, Pattabhipuram, Guntur, Andhra Pradesh 522006, India
13 verified rooftop solar installers in Guntur, Andhra Pradesh. PM-Surya Ghar subsidy (up to ₹78,000) + state net-metering apply. Updated May 2026.
PF Office Rd, opposite AP Grameena Bank, Krishna Nagar, Pattabhipuram, Guntur, Andhra Pradesh 522006, India
Ring Road ,Chandra Mouli Nagar, opposite Don Bosco ITI College, Vidyanagar, Guntur, Andhra Pradesh 522007, India
2nd floor, 6-29-19, Amaravathi Rd, opposite Brahmamgari Temple, Arundelpet, Guntur, Andhra Pradesh 522002, India
Mahatma Gandhi Inner Ring Rd, opposite Vijaya Digital Road, Velangini Nagar, Guntur, Andhra Pradesh 522034, India
4th Line, Nehru Nagar, Guntur, Andhra Pradesh 522001, India
Chuttugunta Cir, behind sbi bank, Guntur, Andhra Pradesh 522004, India
Door No - 24, 5th Line, 16-1/1, Nallacheruvu Rd, near Mahaveer College, Sampath Nagar, Guntur, Andhra Pradesh 522004, India
SRINIVASA NAGAR COLONY Door No :, D - 48, SVN Colony Park Rd, SVN Colony, Guntur, Andhra Pradesh 522006, India
Reliance Fresh Rd, GV Thota, Guntur, Andhra Pradesh 522001, India
4-4-27/3 1/5, Ramannapet, Chandramouli Nagar, Guntur, Andhra Pradesh 522007, India
gayatri residency, Knr hospital line, 101, Amaravathi Rd, Venugopalnagar, Gauthami Nagar, Guntur, Andhra Pradesh 522007, India
2nd floor, Naga Sai Complex, opp. Stall Girls High School, Nagarampalem, Guntur, Andhra Pradesh 522004, India
H No. 9-11-690, Plot No. 65, Sita Rama Nagar Colony 7 Line, Syamlanagar, Extention, Guntur, Andhra Pradesh 522006, India
A 3kW residential system in Guntur typically runs ₹1.6-2.2 lakh before subsidy, ₹85k-1.4 lakh after PM-Surya Ghar (₹78k subsidy). 5kW systems land around ₹3 lakh net. Payback at current Andhra Pradesh tariffs: 4-6 years.
Yes — all Andhra Pradesh DISCOMs are mandated to offer bi-directional net-metering for residential rooftop solar under MNRE guidelines. The installer handles meter swap + DISCOM paperwork (typically 2-4 weeks).
Once site survey + approvals are done, a 3kW system installs in 2-3 days, 5kW in 3-5 days. Total timeline from booking to commissioning is typically 4-8 weeks in Guntur, mostly waiting on DISCOM net-meter approval.