UTL Solar Shoppe | Solar Inverter | Solar Panel - Maxxvolte Solar
Shop No 4, Sharda Market, Main Road, nearby Mahamaya Hotel, Gamharia, Jamshedpur, Jharkhand 832108, India
12 verified rooftop solar installers in Jamshedpur, Jharkhand. PM-Surya Ghar subsidy (up to ₹78,000) + state net-metering apply. Updated May 2026.
Shop No 4, Sharda Market, Main Road, nearby Mahamaya Hotel, Gamharia, Jamshedpur, Jharkhand 832108, India
2nd Floor, Adharshila Tower, Student Club Rd, Bhurkadih, Adityapur, Jamshedpur, Jharkhand 831013, India
BESIDE BMC METALCAST, A20, A-21 2nd Phase, near Khetan Udyog, Adityapur Industrial Area, Adityapur, Jamshedpur, Jharkhand 832109, India
A Mills Area, Chakki Line, near Teenkoniya Hotel, Hirasingh Bagan, Sakchi, Jamshedpur, Jharkhand 831001, India
House No-270, beside M P TOWER, near Bank OF Baroda, Dindli Basti, Adityapur, Jamshedpur, Jharkhand 831013, India
NS-15 1 Phase, Adityapur Basti, Adityapur, Jamshedpur, Jharkhand 831013, India
1 st Phase, MIKASU METREAT B1, Adityapur Industrial Area, Adityapur, Jamshedpur, Jharkhand 832109, India
Gamharia Station Rd, Gamharia, Jamshedpur, Jharkhand 832108, India
SHAIL BHAWAN, STRAIGHT MILE ROAD, VIDYAPATI NAGAR, AIWC SCHOOL, OPPSITE, Baridih, Jamshedpur, Jharkhand 831017, India
5, Diagonal Rd, South Park, Bistupur, Jamshedpur, Jharkhand 831001, India
A J Tower, Q Rd, behind Rajhans Hotel, opposite Bumbra Enclave, South Park, Bistupur, Jamshedpur, Jharkhand 831001, India
Road Number 12, Old Purulia Rd, Zakir Nagar, Mango, Jamshedpur, Jharkhand 831020, India
A 3kW residential system in Jamshedpur typically runs ₹1.6-2.2 lakh before subsidy, ₹85k-1.4 lakh after PM-Surya Ghar (₹78k subsidy). 5kW systems land around ₹3 lakh net. Payback at current Jharkhand tariffs: 4-6 years.
Yes — all Jharkhand DISCOMs are mandated to offer bi-directional net-metering for residential rooftop solar under MNRE guidelines. The installer handles meter swap + DISCOM paperwork (typically 2-4 weeks).
Once site survey + approvals are done, a 3kW system installs in 2-3 days, 5kW in 3-5 days. Total timeline from booking to commissioning is typically 4-8 weeks in Jamshedpur, mostly waiting on DISCOM net-meter approval.