TATA POWER SOLAR Kozhikode
Petta, Pettah, Feroke, Kozhikode, Kerala 673632, India
15 verified rooftop solar installers in Kozhikode, Kerala. PM-Surya Ghar subsidy (up to ₹78,000) + state net-metering apply. Updated May 2026.
Petta, Pettah, Feroke, Kozhikode, Kerala 673632, India
Balan K Nair Rd, near Mac's Cafe Steak House & Pizzeria, Kozhikode, Kerala 673006, India
1st Floor, Sree Muthappan Complex, Patteri, Kottooli, Kozhikode, Kerala 673016, India
Ground Floor, Emerald Mall, Mavoor Rd, Arayidathupalam, Kozhikode, Kerala 673004, India
Dhana Plaza, 69/1490, above Ojin Bakes, West Nadakkave, Vandipetta, West Hill, Kozhikode, Kerala 673011, India
Vengeri, Agriculture Wholesale Market, Jn, Vengeri, Kozhikode, Kerala 673010, India
Kallai Rd, Chalappuram, Kozhikode, Kerala 673003, India
shop no.: 3, Keypees Building, 840/841, Pooladikunnu, Eranhikkal, Elathur, Kozhikode, Kerala 673303, India
60/401B,Ground Floor, viva plaza, Ram Mohan Rd, behind francis alukkas, Chindhavalappu, Palayam, Kozhikode, Kerala 673004, India
Ration Shop, Ummalathoor Rd, above Velliparamba, Velliparamba, Kozhikode, Kerala 673008, India
Room no 64/1378, D6 Leela arcade, Sasthry nagar colony, Eranhipaalam, East Nadakkave, po, Kozhikode, Kerala 673006, India
Post office building, Chevayoor, Kozhikode, Kerala 673017, India
Ground Floor, Varikoly Tower, UK Sankunni Rd, behind Government Veterinary hospital, Kozhikode, Kerala 673001, India
26/99F, National Building, Govindapuram, Kozhikode, Kerala 673016, India
Building No. 44, Kottaram Arcade, 3014, Kottaram Rd, West Nadakkave, East Nadakkave, Nadakkave, Kozhikode, Kerala 673011, India
A 3kW residential system in Kozhikode typically runs ₹1.6-2.2 lakh before subsidy, ₹85k-1.4 lakh after PM-Surya Ghar (₹78k subsidy). 5kW systems land around ₹3 lakh net. Payback at current Kerala tariffs: 4-6 years.
Yes — all Kerala DISCOMs are mandated to offer bi-directional net-metering for residential rooftop solar under MNRE guidelines. The installer handles meter swap + DISCOM paperwork (typically 2-4 weeks).
Once site survey + approvals are done, a 3kW system installs in 2-3 days, 5kW in 3-5 days. Total timeline from booking to commissioning is typically 4-8 weeks in Kozhikode, mostly waiting on DISCOM net-meter approval.