Solar Installers in Rohtak

16 verified rooftop solar installers in Rohtak, Haryana. PM-Surya Ghar subsidy (up to ₹78,000) + state net-metering apply. Updated May 2026.

AV Star Solar

★ 5.0 (22)

Rohtak Byp, Titoli, Haryana 124001, India

DD solar suvidha pvt.ltd.

★ 5.0 (21)

opp. Balraj kundu farm house, near Jind Road, chowk, Rohtak, Haryana 124001, India

Inverter battery & Solar

★ 5.0 (3)

503 Barsi Nagar, Sunderpur Road, Sector-7, Rohtak, Haryana 124001, India

GS SOLAR SYSTEMS

★ 4.9 (136)

05 Sector 22, chowk, Sunarian, Rohtak, Haryana 124001, India

Mehak Solar Power

★ 4.9 (91)

House no. 42/15 Opp. Khadi Bhandar, Udmipura, Civil Rd, Arya Nagar, Rohtak, Haryana 124001, India

Nexus Solar Haryana

★ 4.8 (14)

near MLA Balraj Kundu farm, near Jind Road, chowk, Rohtak, Haryana 124001, India

SOLAR LAB INDIA PRIVATE LIMITED

★ 4.8 (5)

Near, Jind Byepass, opposite MLA Balraj Kundu farm, Sector-7, Rohtak, Haryana 124001, India

Numberdar Solar Energy

★ 4.7 (89)

Jind Rd, opposite MLA Balraj Kundu farm, near Suncity Bypas, Chowk, Rohtak, Haryana 124001, India

Hindustan solar and battery

★ 4.7 (56)

Jind Bye Pass, Bus Stop, Outer City Rd, Gopal Colony, Rohtak, Haryana 124001, India

The Battery Hub (Solar & Battery)

★ 4.5 (23)

IDC Chowk, Main, Hisar Rd, near Hanuman Mandir, Lal Bhadur Shastry Nagar, Rohtak, Haryana 124001, India

Maven Solar Pvt. Ltd.

★ 4.3 (19)

Delhi Rd, opp. to TVS Showroom, Tilak Nagar, Sector 3 (P), Rohtak, Haryana 124001, India

Frequently asked questions

How much does rooftop solar cost in Rohtak?

A 3kW residential system in Rohtak typically runs ₹1.6-2.2 lakh before subsidy, ₹85k-1.4 lakh after PM-Surya Ghar (₹78k subsidy). 5kW systems land around ₹3 lakh net. Payback at current Haryana tariffs: 4-6 years.

Does my electricity board support net-metering?

Yes — all Haryana DISCOMs are mandated to offer bi-directional net-metering for residential rooftop solar under MNRE guidelines. The installer handles meter swap + DISCOM paperwork (typically 2-4 weeks).

How long does installation take?

Once site survey + approvals are done, a 3kW system installs in 2-3 days, 5kW in 3-5 days. Total timeline from booking to commissioning is typically 4-8 weeks in Rohtak, mostly waiting on DISCOM net-meter approval.

Related

Chat with us