Janaadhya Solar Energy || Best Solar Panel In Sagar
ward 46, Rajghat Road, near Yamaha Showroom, Tilli, Sagar, Madhya Pradesh 470001, India
15 verified rooftop solar installers in Sagar, Madhya Pradesh. PM-Surya Ghar subsidy (up to ₹78,000) + state net-metering apply. Updated May 2026.
ward 46, Rajghat Road, near Yamaha Showroom, Tilli, Sagar, Madhya Pradesh 470001, India
Shop No 4, Nema Building, Somnath Puram, Tilli, Sagar, Madhya Pradesh 470002, India
Ashok vihar, Ashok Vihar Colony, Ashok vihar, Sagar, Madhya Pradesh 470001, India
tili road, Somnath Puram, Sagar, Madhya Pradesh 470001, India
Madhukar shah ward, behind Central jail, Sneh Nagar, Poddar Colony, Sagar, Madhya Pradesh 470001, India
Shri Nagar Colony, Sagar, Makroniya, Madhya Pradesh 470004, India
Pant Nagar Ward, Sanjay Dr, near century Marriage garden with Rose residency, Kakaganj, Sagar, Madhya Pradesh 470001, India
Main, Bus stand, beside Shehnai Garden Hotel, Gopal Ganj, Sagar, Madhya Pradesh 470001, India
Dwarika Vihar Chouraha, 11, Tili Rd, in front of SatSang Bhavan, Dwarika Garden, Sagar, Madhya Pradesh 470001, India
near lal school gopalganj, Gopal Ganj, Sagar, Madhya Pradesh 470001, India
Makroniya, Sagar, Madhya Pradesh 470004, India
Tili Rd, beside Shenai Garden, near Bus Stand, Gopal Ganj, Sagar, Madhya Pradesh 470001, India
Kareela, Khurai Road, near Siddhayatan Jain Temple, Shastri Nagar, Sagar, Gadoli Khurd, Madhya Pradesh 470002, India
Vishwabharti school, road, Bhagwan Ganj, Sagar, Madhya Pradesh 470002, India
Tili Rd, near Sehnai Garden, Gopal Ganj, Sagar, Madhya Pradesh 470001, India
A 3kW residential system in Sagar typically runs ₹1.6-2.2 lakh before subsidy, ₹85k-1.4 lakh after PM-Surya Ghar (₹78k subsidy). 5kW systems land around ₹3 lakh net. Payback at current Madhya Pradesh tariffs: 4-6 years.
Yes — all Madhya Pradesh DISCOMs are mandated to offer bi-directional net-metering for residential rooftop solar under MNRE guidelines. The installer handles meter swap + DISCOM paperwork (typically 2-4 weeks).
Once site survey + approvals are done, a 3kW system installs in 2-3 days, 5kW in 3-5 days. Total timeline from booking to commissioning is typically 4-8 weeks in Sagar, mostly waiting on DISCOM net-meter approval.