Aikya Solar Consultancy

Rooftop solar installer in Thiruvananthapuram, Kerala. ★ 5.0 (12 Google reviews) Updated August 2026.

About

Individuals seeking to integrate rooftop solar power into their existing electrical infrastructure often utilize this service provider. The company assists clients with the technical requirements associated with grid connectivity. A key service area involves managing the process for DISCOM net-metering applications. Clients should be aware that the timeline for utility approval and final connection often depends on the specific processing capacity of the local distribution company. Navigating the necessary paperwork and technical compliance for net-metering requires adherence to current state and local utility guidelines. Understanding the typical processing cycle for these applications helps homeowners plan the integration timeline accurately.

Get a quote from Aikya Solar Consultancy

Aikya Solar Consultancy hasn't yet confirmed lead notifications on GreenTax.in. Submit and we'll forward your enquiry to a verified active solar installer in Thiruvananthapuram.

Rooftop solar in Thiruvananthapuram, Kerala

A standard residential rooftop solar system in Thiruvananthapuram sizes between 1 kW and 5 kW depending on monthly consumption. Most Thiruvananthapuram homeowners pick a 3 kW system — it covers 300–400 units a month and captures the full ₹78,000 PM-Surya Ghar central subsidy.

Installed cost for a 3 kW system runs ₹1.8 lakh to ₹2.4 lakh; after the central subsidy your net outlay is ₹1.0 lakh to ₹1.6 lakh. Payback typically lands between 3.5 and 5 years — and the panels carry a 25-year warranty. Aikya Solar Consultancy can quote your specific roof; use the Get Quote form above or call directly.

The installer handles the PM-Surya Ghar registration, DISCOM net-metering application, system installation, and commissioning. Confirm AMC terms, panel warranty (look for Tier-1 manufacturer + 25-year linear-power guarantee), and inverter warranty (10 years minimum) before signing.

What to check before booking

  • Site visit and shading analysis — this determines the realistic kW your roof can support
  • PM-Surya Ghar registration done on your behalf, with the ₹78,000 subsidy credited directly to your bank
  • DISCOM net-metering application and commissioning — installer should handle this end-to-end
  • Tier-1 panels with 25-year linear-power warranty (degradation ≤0.55% per year)
  • Inverter warranty (10 years minimum) and on-site replacement policy
  • AMC contract for at least 5 years (panel cleaning, performance check, inverter health)

Frequently asked questions

How much PM-Surya Ghar subsidy can I get in Thiruvananthapuram?

PM-Surya Ghar: Muft Bijli Yojana offers up to ₹78,000 for a residential rooftop solar system (₹30,000 per kW for the first 2 kW, ₹18,000 for the 3rd kW). Most households choose a 3 kW system to capture the full subsidy. Kerala residents apply through the national pmsuryaghar.gov.in portal — your DISCOM and the installer handle the rest.

What's the typical cost of a 3 kW system in Thiruvananthapuram?

A 3 kW grid-connected residential rooftop system costs ₹1.8 lakh to ₹2.4 lakh installed (₹60,000 – ₹80,000 per kW). After the ₹78,000 PM-Surya Ghar subsidy, your net cost is ₹1.0 lakh to ₹1.6 lakh. Payback for a typical household in Kerala is 3.5 – 5 years; the panels carry a 25-year warranty.

Does Aikya Solar Consultancy handle net-metering paperwork?

Reputable solar installers handle the net-metering and DISCOM application end-to-end — site survey, design, DISCOM application, installation, commissioning, and meter installation. Confirm with Aikya Solar Consultancy when you call (see contact details) or fill the Get Quote form above.

What panels and inverters does Aikya Solar Consultancy typically install?

For PM-Surya Ghar eligibility, panels must be from approved manufacturers — typically Tier-1 brands such as Adani, Vikram, Waaree, Tata Power Solar, Premier Energies, or Loom Solar. Inverters are usually Growatt, Solis, Microtek, Polycab, or Luminous. Ask for the specific model and the 25-year linear-power warranty document.

How long does installation take?

Typical timeline: 3 days for site survey + design, 10–20 days for DISCOM approval, 1–2 days for installation, 7–15 days for net-meter installation and commissioning. End-to-end is 4–8 weeks for most residential installations in Thiruvananthapuram.

Location

TC 07/1475,2, Souparnika, Melekariyam, PO, Sreekaryam, Thiruvananthapuram, Kerala 695017, India

View on Google Maps →

Opening hours

SundayClosed
Monday10:00 – 18:00
Tuesday10:00 – 18:00
Wednesday10:00 – 18:00
Thursday10:00 – 18:00
Friday10:00 – 18:00
Saturday10:00 – 18:00
Chat with us