Ajmer Traurja Solar (Solar Subsidy Provider)

Rooftop solar installer in Ajmer, Rajasthan. ★ 4.9 (13 Google reviews) Updated August 2026.

About

Rooftop solar installations provide an option for generating decentralized electricity for residential and commercial properties. Customers in the Ajmer area often seek solar solutions to supplement grid power and manage energy consumption. For those looking to integrate solar generation with the local utility grid, understanding the net-metering process is a key consideration. The process involves applying for interconnection approval with the local Distribution Company (DISCOM). Successful net-metering requires adherence to specific state and utility guidelines, and the timeline for utility approval can vary based on the current workload and procedural requirements of the local electricity board. Prospective buyers should confirm the current processing standards for net-metering applications directly with the relevant utility authority to establish a realistic project timeline.

Get a quote from Ajmer Traurja Solar (Solar Subsidy Provider)

Ajmer Traurja Solar (Solar Subsidy Provider) hasn't yet confirmed lead notifications on GreenTax.in. Submit and we'll forward your enquiry to a verified active solar installer in Ajmer.

Rooftop solar in Ajmer, Rajasthan

A standard residential rooftop solar system in Ajmer sizes between 1 kW and 5 kW depending on monthly consumption. Most Ajmer homeowners pick a 3 kW system — it covers 300–400 units a month and captures the full ₹78,000 PM-Surya Ghar central subsidy.

Installed cost for a 3 kW system runs ₹1.8 lakh to ₹2.4 lakh; after the central subsidy your net outlay is ₹1.0 lakh to ₹1.6 lakh. Payback typically lands between 3.5 and 5 years — and the panels carry a 25-year warranty. Ajmer Traurja Solar (Solar Subsidy Provider) can quote your specific roof; use the Get Quote form above or call 070144 39891.

The installer handles the PM-Surya Ghar registration, DISCOM net-metering application, system installation, and commissioning. Confirm AMC terms, panel warranty (look for Tier-1 manufacturer + 25-year linear-power guarantee), and inverter warranty (10 years minimum) before signing.

What to check before booking

  • Site visit and shading analysis — this determines the realistic kW your roof can support
  • PM-Surya Ghar registration done on your behalf, with the ₹78,000 subsidy credited directly to your bank
  • DISCOM net-metering application and commissioning — installer should handle this end-to-end
  • Tier-1 panels with 25-year linear-power warranty (degradation ≤0.55% per year)
  • Inverter warranty (10 years minimum) and on-site replacement policy
  • AMC contract for at least 5 years (panel cleaning, performance check, inverter health)

Frequently asked questions

How much PM-Surya Ghar subsidy can I get in Ajmer?

PM-Surya Ghar: Muft Bijli Yojana offers up to ₹78,000 for a residential rooftop solar system (₹30,000 per kW for the first 2 kW, ₹18,000 for the 3rd kW). Most households choose a 3 kW system to capture the full subsidy. Rajasthan residents apply through the national pmsuryaghar.gov.in portal — your DISCOM and the installer handle the rest.

What's the typical cost of a 3 kW system in Ajmer?

A 3 kW grid-connected residential rooftop system costs ₹1.8 lakh to ₹2.4 lakh installed (₹60,000 – ₹80,000 per kW). After the ₹78,000 PM-Surya Ghar subsidy, your net cost is ₹1.0 lakh to ₹1.6 lakh. Payback for a typical household in Rajasthan is 3.5 – 5 years; the panels carry a 25-year warranty.

Does Ajmer Traurja Solar (Solar Subsidy Provider) handle net-metering paperwork?

Reputable solar installers handle the net-metering and DISCOM application end-to-end — site survey, design, DISCOM application, installation, commissioning, and meter installation. Confirm with Ajmer Traurja Solar (Solar Subsidy Provider) when you call (070144 39891) or fill the Get Quote form above.

What panels and inverters does Ajmer Traurja Solar (Solar Subsidy Provider) typically install?

For PM-Surya Ghar eligibility, panels must be from approved manufacturers — typically Tier-1 brands such as Adani, Vikram, Waaree, Tata Power Solar, Premier Energies, or Loom Solar. Inverters are usually Growatt, Solis, Microtek, Polycab, or Luminous. Ask for the specific model and the 25-year linear-power warranty document.

How long does installation take?

Typical timeline: 3 days for site survey + design, 10–20 days for DISCOM approval, 1–2 days for installation, 7–15 days for net-meter installation and commissioning. End-to-end is 4–8 weeks for most residential installations in Ajmer.

Location

2Gh35, Landmark, Shree Ram Vihar, near New Namdev Store, Vaishali Nagar, Ajmer, Rajasthan 305001, India

View on Google Maps →

Opening hours

Sunday09:00 – 21:00
Monday09:00 – 21:00
Tuesday09:00 – 21:00
Wednesday09:00 – 21:00
Thursday09:00 – 21:00
Friday09:00 – 21:00
Saturday09:00 – 21:00
Chat with us