About
Individuals seeking to integrate solar power into existing residential or commercial structures often utilize this facility. The process typically begins with a thorough site survey to assess the physical characteristics of the roof space. During this assessment, technicians conduct shading analysis to determine the amount of direct sunlight reaching the potential installation area throughout the day. This analysis is crucial for accurately calculating the maximum feasible capacity. Based on the roof's orientation, material, and the measured shading patterns, the experts provide an estimate of the realistic kilowatt (kW) capacity the structure can reliably support. This initial technical assessment guides the subsequent design and system sizing for optimal energy generation.
Get a quote from Ayan electronics Solar and Battery Kanpur
Submit your name + phone to reveal Ayan electronics Solar and Battery Kanpur's contact and notify them. No spam, no obligation.
Rooftop solar in Kanpur, Uttar Pradesh
A standard residential rooftop solar system in Kanpur sizes between 1 kW and 5 kW depending on monthly consumption. Most Kanpur homeowners pick a 3 kW system — it covers 300–400 units a month and captures the full ₹78,000 PM-Surya Ghar central subsidy.
Installed cost for a 3 kW system runs ₹1.8 lakh to ₹2.4 lakh; after the central subsidy your net outlay is ₹1.0 lakh to ₹1.6 lakh. Payback typically lands between 3.5 and 5 years — and the panels carry a 25-year warranty. Ayan electronics Solar and Battery Kanpur can quote your specific roof; use the Get Quote form above or call 099567 73223.
The installer handles the PM-Surya Ghar registration, DISCOM net-metering application, system installation, and commissioning. Confirm AMC terms, panel warranty (look for Tier-1 manufacturer + 25-year linear-power guarantee), and inverter warranty (10 years minimum) before signing.
What to check before booking
- Site visit and shading analysis — this determines the realistic kW your roof can support
- PM-Surya Ghar registration done on your behalf, with the ₹78,000 subsidy credited directly to your bank
- DISCOM net-metering application and commissioning — installer should handle this end-to-end
- Tier-1 panels with 25-year linear-power warranty (degradation ≤0.55% per year)
- Inverter warranty (10 years minimum) and on-site replacement policy
- AMC contract for at least 5 years (panel cleaning, performance check, inverter health)
Frequently asked questions
How much PM-Surya Ghar subsidy can I get in Kanpur?
PM-Surya Ghar: Muft Bijli Yojana offers up to ₹78,000 for a residential rooftop solar system (₹30,000 per kW for the first 2 kW, ₹18,000 for the 3rd kW). Most households choose a 3 kW system to capture the full subsidy. Uttar Pradesh residents apply through the national pmsuryaghar.gov.in portal — your DISCOM and the installer handle the rest.
What's the typical cost of a 3 kW system in Kanpur?
A 3 kW grid-connected residential rooftop system costs ₹1.8 lakh to ₹2.4 lakh installed (₹60,000 – ₹80,000 per kW). After the ₹78,000 PM-Surya Ghar subsidy, your net cost is ₹1.0 lakh to ₹1.6 lakh. Payback for a typical household in Uttar Pradesh is 3.5 – 5 years; the panels carry a 25-year warranty.
Does Ayan electronics Solar and Battery Kanpur handle net-metering paperwork?
Reputable solar installers handle the net-metering and DISCOM application end-to-end — site survey, design, DISCOM application, installation, commissioning, and meter installation. Confirm with Ayan electronics Solar and Battery Kanpur when you call (099567 73223) or fill the Get Quote form above.
What panels and inverters does Ayan electronics Solar and Battery Kanpur typically install?
For PM-Surya Ghar eligibility, panels must be from approved manufacturers — typically Tier-1 brands such as Adani, Vikram, Waaree, Tata Power Solar, Premier Energies, or Loom Solar. Inverters are usually Growatt, Solis, Microtek, Polycab, or Luminous. Ask for the specific model and the 25-year linear-power warranty document.
How long does installation take?
Typical timeline: 3 days for site survey + design, 10–20 days for DISCOM approval, 1–2 days for installation, 7–15 days for net-meter installation and commissioning. End-to-end is 4–8 weeks for most residential installations in Kanpur.
Location
268/B, 268/B, Hamirpur Rd, Baudh Nagar, Naubasta, Kanpur, Uttar Pradesh 208021, India
View on Google Maps →Opening hours
| Sunday | 07:00 – 20:00 |
|---|---|
| Monday | 07:00 – 20:00 |
| Tuesday | 07:00 – 19:30 |
| Wednesday | 07:00 – 20:00 |
| Thursday | 07:00 – 20:00 |
| Friday | 07:00 – 20:00 |
| Saturday | 07:00 – 20:00 |
