Chirayil Solar Power Tech

Rooftop solar installer in Thiruvananthapuram, Kerala. ★ 4.8 (52 Google reviews) Updated August 2026.

About

Rooftop solar installations provide decentralized power generation for residential and commercial properties. The service provided at this facility is suitable for property owners seeking to integrate solar energy into existing structures in the Thiruvananthapuram area. Customers utilizing this service can arrange for Annual Maintenance Contracts (AMC) to cover ongoing system upkeep. Regarding panel maintenance, the recommended cleaning frequency is dependent on local environmental factors, and technicians assess this during the initial consultation. Furthermore, the company provides post-installation support designed to address operational queries and performance monitoring after the system is commissioned. This structure of support aims to ensure the long-term efficiency of the installed photovoltaic array.

Get a quote from Chirayil Solar Power Tech

Chirayil Solar Power Tech hasn't yet confirmed lead notifications on GreenTax.in. Submit and we'll forward your enquiry to a verified active solar installer in Thiruvananthapuram.

Rooftop solar in Thiruvananthapuram, Kerala

A standard residential rooftop solar system in Thiruvananthapuram sizes between 1 kW and 5 kW depending on monthly consumption. Most Thiruvananthapuram homeowners pick a 3 kW system — it covers 300–400 units a month and captures the full ₹78,000 PM-Surya Ghar central subsidy.

Installed cost for a 3 kW system runs ₹1.8 lakh to ₹2.4 lakh; after the central subsidy your net outlay is ₹1.0 lakh to ₹1.6 lakh. Payback typically lands between 3.5 and 5 years — and the panels carry a 25-year warranty. Chirayil Solar Power Tech can quote your specific roof; use the Get Quote form above or call 097788 05529.

The installer handles the PM-Surya Ghar registration, DISCOM net-metering application, system installation, and commissioning. Confirm AMC terms, panel warranty (look for Tier-1 manufacturer + 25-year linear-power guarantee), and inverter warranty (10 years minimum) before signing.

What to check before booking

  • Site visit and shading analysis — this determines the realistic kW your roof can support
  • PM-Surya Ghar registration done on your behalf, with the ₹78,000 subsidy credited directly to your bank
  • DISCOM net-metering application and commissioning — installer should handle this end-to-end
  • Tier-1 panels with 25-year linear-power warranty (degradation ≤0.55% per year)
  • Inverter warranty (10 years minimum) and on-site replacement policy
  • AMC contract for at least 5 years (panel cleaning, performance check, inverter health)

Frequently asked questions

How much PM-Surya Ghar subsidy can I get in Thiruvananthapuram?

PM-Surya Ghar: Muft Bijli Yojana offers up to ₹78,000 for a residential rooftop solar system (₹30,000 per kW for the first 2 kW, ₹18,000 for the 3rd kW). Most households choose a 3 kW system to capture the full subsidy. Kerala residents apply through the national pmsuryaghar.gov.in portal — your DISCOM and the installer handle the rest.

What's the typical cost of a 3 kW system in Thiruvananthapuram?

A 3 kW grid-connected residential rooftop system costs ₹1.8 lakh to ₹2.4 lakh installed (₹60,000 – ₹80,000 per kW). After the ₹78,000 PM-Surya Ghar subsidy, your net cost is ₹1.0 lakh to ₹1.6 lakh. Payback for a typical household in Kerala is 3.5 – 5 years; the panels carry a 25-year warranty.

Does Chirayil Solar Power Tech handle net-metering paperwork?

Reputable solar installers handle the net-metering and DISCOM application end-to-end — site survey, design, DISCOM application, installation, commissioning, and meter installation. Confirm with Chirayil Solar Power Tech when you call (097788 05529) or fill the Get Quote form above.

What panels and inverters does Chirayil Solar Power Tech typically install?

For PM-Surya Ghar eligibility, panels must be from approved manufacturers — typically Tier-1 brands such as Adani, Vikram, Waaree, Tata Power Solar, Premier Energies, or Loom Solar. Inverters are usually Growatt, Solis, Microtek, Polycab, or Luminous. Ask for the specific model and the 25-year linear-power warranty document.

How long does installation take?

Typical timeline: 3 days for site survey + design, 10–20 days for DISCOM approval, 1–2 days for installation, 7–15 days for net-meter installation and commissioning. End-to-end is 4–8 weeks for most residential installations in Thiruvananthapuram.

Location

6th shop, Mallika Vilas Building, near SBI Bank, Nalanchira, Paruthippara, Thiruvananthapuram, Kerala 695015, India

View on Google Maps →

Opening hours

SundayClosed
Monday09:00 – 17:00
Tuesday09:00 – 17:00
Wednesday09:00 – 17:00
Thursday09:00 – 17:00
Friday09:00 – 17:00
Saturday09:00 – 17:00
Chat with us