DEVENDRAM SOLAR SYNERGY PRIVATE LIMITED

Rooftop solar installer in Ujjain, Madhya Pradesh. ★ 5.0 (103 Google reviews) Updated August 2026.

About

The climate in Ujjain, Madhya Pradesh, presents consistent solar irradiation suitable for residential rooftop installations. Homeowners in this area who are seeking to integrate renewable energy sources into their existing dwellings are often suitable candidates for solar photovoltaic systems. The process for accessing the PM-Surya Ghar subsidy requires careful attention to documentation and timing to ensure a smooth application. Applicants should confirm the latest guidelines published on the official portal, as eligibility criteria and required paperwork can be updated. Generally, having proof of property ownership, recent electricity bills, and the necessary identity documents for all occupants is recommended before initiating the application. Furthermore, it is advisable to coordinate the initial site assessment with the subsidy application filing, as the system design often dictates the final subsidy amount and feasibility. Consulting with local experts early in the process can help streamline the submission of all necessary paperwork to avoid delays in the approval timeline.

Get a quote from DEVENDRAM SOLAR SYNERGY PRIVATE LIMITED

DEVENDRAM SOLAR SYNERGY PRIVATE LIMITED hasn't yet confirmed lead notifications on GreenTax.in. Submit and we'll forward your enquiry to a verified active solar installer in Ujjain.

Rooftop solar in Ujjain, Madhya Pradesh

A standard residential rooftop solar system in Ujjain sizes between 1 kW and 5 kW depending on monthly consumption. Most Ujjain homeowners pick a 3 kW system — it covers 300–400 units a month and captures the full ₹78,000 PM-Surya Ghar central subsidy.

Installed cost for a 3 kW system runs ₹1.8 lakh to ₹2.4 lakh; after the central subsidy your net outlay is ₹1.0 lakh to ₹1.6 lakh. Payback typically lands between 3.5 and 5 years — and the panels carry a 25-year warranty. DEVENDRAM SOLAR SYNERGY PRIVATE LIMITED can quote your specific roof; use the Get Quote form above or call 094245 43345.

The installer handles the PM-Surya Ghar registration, DISCOM net-metering application, system installation, and commissioning. Confirm AMC terms, panel warranty (look for Tier-1 manufacturer + 25-year linear-power guarantee), and inverter warranty (10 years minimum) before signing.

What to check before booking

  • Site visit and shading analysis — this determines the realistic kW your roof can support
  • PM-Surya Ghar registration done on your behalf, with the ₹78,000 subsidy credited directly to your bank
  • DISCOM net-metering application and commissioning — installer should handle this end-to-end
  • Tier-1 panels with 25-year linear-power warranty (degradation ≤0.55% per year)
  • Inverter warranty (10 years minimum) and on-site replacement policy
  • AMC contract for at least 5 years (panel cleaning, performance check, inverter health)

Frequently asked questions

How much PM-Surya Ghar subsidy can I get in Ujjain?

PM-Surya Ghar: Muft Bijli Yojana offers up to ₹78,000 for a residential rooftop solar system (₹30,000 per kW for the first 2 kW, ₹18,000 for the 3rd kW). Most households choose a 3 kW system to capture the full subsidy. Madhya Pradesh residents apply through the national pmsuryaghar.gov.in portal — your DISCOM and the installer handle the rest.

What's the typical cost of a 3 kW system in Ujjain?

A 3 kW grid-connected residential rooftop system costs ₹1.8 lakh to ₹2.4 lakh installed (₹60,000 – ₹80,000 per kW). After the ₹78,000 PM-Surya Ghar subsidy, your net cost is ₹1.0 lakh to ₹1.6 lakh. Payback for a typical household in Madhya Pradesh is 3.5 – 5 years; the panels carry a 25-year warranty.

Does DEVENDRAM SOLAR SYNERGY PRIVATE LIMITED handle net-metering paperwork?

Reputable solar installers handle the net-metering and DISCOM application end-to-end — site survey, design, DISCOM application, installation, commissioning, and meter installation. Confirm with DEVENDRAM SOLAR SYNERGY PRIVATE LIMITED when you call (094245 43345) or fill the Get Quote form above.

What panels and inverters does DEVENDRAM SOLAR SYNERGY PRIVATE LIMITED typically install?

For PM-Surya Ghar eligibility, panels must be from approved manufacturers — typically Tier-1 brands such as Adani, Vikram, Waaree, Tata Power Solar, Premier Energies, or Loom Solar. Inverters are usually Growatt, Solis, Microtek, Polycab, or Luminous. Ask for the specific model and the 25-year linear-power warranty document.

How long does installation take?

Typical timeline: 3 days for site survey + design, 10–20 days for DISCOM approval, 1–2 days for installation, 7–15 days for net-meter installation and commissioning. End-to-end is 4–8 weeks for most residential installations in Ujjain.

Location

ashok vihar colony, 8 b, near sethi nagar, Desai Nagar, Ujjain, Madhya Pradesh 456010, India

View on Google Maps →

Opening hours

SundayClosed
Monday09:00 – 19:00
Tuesday09:00 – 19:00
Wednesday09:00 – 19:00
Thursday09:00 – 19:00
Friday09:00 – 19:00
Saturday09:00 – 19:00
Chat with us