Electricbuy - your trusted solar partner

Rooftop solar installer in Kozhikode, Kerala. ★ 5.0 (18 Google reviews) Updated August 2026.

About

When considering a solar installation in the Kozhikode area, understanding the roof's physical characteristics is a necessary first step. The process typically involves a detailed site survey to assess the available mounting surface and potential shading sources throughout the day. Professionals at this facility conduct shading analysis to accurately model the energy yield before equipment is selected. This assessment determines the realistic kilowatt capacity the roof structure can safely and effectively support. The service is suitable for homeowners or property owners who require a technical evaluation of their existing rooftop potential for solar energy generation.

Get a quote from Electricbuy - your trusted solar partner

Electricbuy - your trusted solar partner hasn't yet confirmed lead notifications on GreenTax.in. Submit and we'll forward your enquiry to a verified active solar installer in Kozhikode.

Rooftop solar in Kozhikode, Kerala

A standard residential rooftop solar system in Kozhikode sizes between 1 kW and 5 kW depending on monthly consumption. Most Kozhikode homeowners pick a 3 kW system — it covers 300–400 units a month and captures the full ₹78,000 PM-Surya Ghar central subsidy.

Installed cost for a 3 kW system runs ₹1.8 lakh to ₹2.4 lakh; after the central subsidy your net outlay is ₹1.0 lakh to ₹1.6 lakh. Payback typically lands between 3.5 and 5 years — and the panels carry a 25-year warranty. Electricbuy - your trusted solar partner can quote your specific roof; use the Get Quote form above or call 090722 26111.

The installer handles the PM-Surya Ghar registration, DISCOM net-metering application, system installation, and commissioning. Confirm AMC terms, panel warranty (look for Tier-1 manufacturer + 25-year linear-power guarantee), and inverter warranty (10 years minimum) before signing.

What to check before booking

  • Site visit and shading analysis — this determines the realistic kW your roof can support
  • PM-Surya Ghar registration done on your behalf, with the ₹78,000 subsidy credited directly to your bank
  • DISCOM net-metering application and commissioning — installer should handle this end-to-end
  • Tier-1 panels with 25-year linear-power warranty (degradation ≤0.55% per year)
  • Inverter warranty (10 years minimum) and on-site replacement policy
  • AMC contract for at least 5 years (panel cleaning, performance check, inverter health)

Frequently asked questions

How much PM-Surya Ghar subsidy can I get in Kozhikode?

PM-Surya Ghar: Muft Bijli Yojana offers up to ₹78,000 for a residential rooftop solar system (₹30,000 per kW for the first 2 kW, ₹18,000 for the 3rd kW). Most households choose a 3 kW system to capture the full subsidy. Kerala residents apply through the national pmsuryaghar.gov.in portal — your DISCOM and the installer handle the rest.

What's the typical cost of a 3 kW system in Kozhikode?

A 3 kW grid-connected residential rooftop system costs ₹1.8 lakh to ₹2.4 lakh installed (₹60,000 – ₹80,000 per kW). After the ₹78,000 PM-Surya Ghar subsidy, your net cost is ₹1.0 lakh to ₹1.6 lakh. Payback for a typical household in Kerala is 3.5 – 5 years; the panels carry a 25-year warranty.

Does Electricbuy - your trusted solar partner handle net-metering paperwork?

Reputable solar installers handle the net-metering and DISCOM application end-to-end — site survey, design, DISCOM application, installation, commissioning, and meter installation. Confirm with Electricbuy - your trusted solar partner when you call (090722 26111) or fill the Get Quote form above.

What panels and inverters does Electricbuy - your trusted solar partner typically install?

For PM-Surya Ghar eligibility, panels must be from approved manufacturers — typically Tier-1 brands such as Adani, Vikram, Waaree, Tata Power Solar, Premier Energies, or Loom Solar. Inverters are usually Growatt, Solis, Microtek, Polycab, or Luminous. Ask for the specific model and the 25-year linear-power warranty document.

How long does installation take?

Typical timeline: 3 days for site survey + design, 10–20 days for DISCOM approval, 1–2 days for installation, 7–15 days for net-meter installation and commissioning. End-to-end is 4–8 weeks for most residential installations in Kozhikode.

Location

Balan K Nair Rd, near Mac's Cafe Steak House & Pizzeria, Kozhikode, Kerala 673006, India

View on Google Maps →

Opening hours

SundayClosed
Monday09:00 – 17:00
Tuesday09:00 – 17:00
Wednesday09:00 – 17:00
Thursday09:00 – 17:00
Friday09:00 – 17:00
Saturday09:00 – 17:00
Chat with us