Festa Solar Private Limited

Rooftop solar installer in Chennai, Tamil Nadu. ★ 4.6 (36 Google reviews) Updated June 2026.

About

Visitors can expect an initial assessment process that involves evaluating the physical structure and solar potential of the property. The expertise available in the Chennai area is suitable for residential and commercial properties seeking to integrate solar power into existing rooftops. A key component of the initial consultation involves a detailed site survey to understand the roof's structural integrity and orientation. During this survey, technicians conduct a shading analysis to map out areas of consistent sunlight exposure throughout the day. This analysis is crucial because the amount of usable space and the intensity of sunlight directly determine the system's output capacity. Based on these physical assessments, a realistic estimate of the system's maximum supported kilowatt (kW) capacity is provided. For property owners in Tamil Nadu, understanding the roof's load-bearing capacity relative to the proposed solar array is a practical consideration. The resulting system design will be tailored to maximize energy generation while ensuring compliance with local structural guidelines.

Get a quote from Festa Solar Private Limited

Submit your name + phone to reveal Festa Solar Private Limited's contact and notify them. No spam, no obligation.

Rooftop solar in Chennai, Tamil Nadu

A standard residential rooftop solar system in Chennai sizes between 1 kW and 5 kW depending on monthly consumption. Most Chennai homeowners pick a 3 kW system — it covers 300–400 units a month and captures the full ₹78,000 PM-Surya Ghar central subsidy.

Installed cost for a 3 kW system runs ₹1.8 lakh to ₹2.4 lakh; after the central subsidy your net outlay is ₹1.0 lakh to ₹1.6 lakh. Payback typically lands between 3.5 and 5 years — and the panels carry a 25-year warranty. Festa Solar Private Limited can quote your specific roof; use the Get Quote form above or call 089251 06665.

The installer handles the PM-Surya Ghar registration, DISCOM net-metering application, system installation, and commissioning. Confirm AMC terms, panel warranty (look for Tier-1 manufacturer + 25-year linear-power guarantee), and inverter warranty (10 years minimum) before signing.

What to check before booking

  • Site visit and shading analysis — this determines the realistic kW your roof can support
  • PM-Surya Ghar registration done on your behalf, with the ₹78,000 subsidy credited directly to your bank
  • DISCOM net-metering application and commissioning — installer should handle this end-to-end
  • Tier-1 panels with 25-year linear-power warranty (degradation ≤0.55% per year)
  • Inverter warranty (10 years minimum) and on-site replacement policy
  • AMC contract for at least 5 years (panel cleaning, performance check, inverter health)

Frequently asked questions

How much PM-Surya Ghar subsidy can I get in Chennai?

PM-Surya Ghar: Muft Bijli Yojana offers up to ₹78,000 for a residential rooftop solar system (₹30,000 per kW for the first 2 kW, ₹18,000 for the 3rd kW). Most households choose a 3 kW system to capture the full subsidy. Tamil Nadu residents apply through the national pmsuryaghar.gov.in portal — your DISCOM and the installer handle the rest.

What's the typical cost of a 3 kW system in Chennai?

A 3 kW grid-connected residential rooftop system costs ₹1.8 lakh to ₹2.4 lakh installed (₹60,000 – ₹80,000 per kW). After the ₹78,000 PM-Surya Ghar subsidy, your net cost is ₹1.0 lakh to ₹1.6 lakh. Payback for a typical household in Tamil Nadu is 3.5 – 5 years; the panels carry a 25-year warranty.

Does Festa Solar Private Limited handle net-metering paperwork?

Reputable solar installers handle the net-metering and DISCOM application end-to-end — site survey, design, DISCOM application, installation, commissioning, and meter installation. Confirm with Festa Solar Private Limited when you call (089251 06665) or fill the Get Quote form above.

What panels and inverters does Festa Solar Private Limited typically install?

For PM-Surya Ghar eligibility, panels must be from approved manufacturers — typically Tier-1 brands such as Adani, Vikram, Waaree, Tata Power Solar, Premier Energies, or Loom Solar. Inverters are usually Growatt, Solis, Microtek, Polycab, or Luminous. Ask for the specific model and the 25-year linear-power warranty document.

How long does installation take?

Typical timeline: 3 days for site survey + design, 10–20 days for DISCOM approval, 1–2 days for installation, 7–15 days for net-meter installation and commissioning. End-to-end is 4–8 weeks for most residential installations in Chennai.

Location

Vanagaram-Ambattur Rd, Gandhi Nagar, Ambattur Industrial Estate, Chennai, Tamil Nadu 600058, India

View on Google Maps →

Opening hours

SundayClosed
Monday09:30 – 18:00
Tuesday09:30 – 18:00
Wednesday09:30 – 18:00
Thursday09:30 – 18:00
Friday09:30 – 18:00
Saturday09:30 – 18:00
Chat with us