About
Visitors can expect an initial consultation regarding the feasibility of solar installations on existing structures. The service provider handles the technical assessment required for integrating rooftop solar systems into the local grid infrastructure. Individuals or businesses looking to offset electricity consumption through solar generation should review the local distribution company's (DISCOM) net-metering guidelines before proceeding with system design. Understanding the specific interconnection requirements of the local utility is a critical first step in the process. The timeline for net-metering approvals can vary depending on the current workload and procedural efficiency of the local utility. While the initial site survey and system design are managed by the installer, the final approval rests with the DISCOM, which dictates the pace of grid connection. A practical point to consider is that the documentation required for net-metering applications often necessitates coordination between the homeowner, the installer, and the utility office. It is recommended that prospective clients obtain the most recent interconnection application checklist directly from the local DISCOM office to ensure all necessary paperwork is prepared accurately before engaging the installation process.
Get a quote from Four Solar Energy Systems Pvt Ltd
Submit your name + phone to reveal Four Solar Energy Systems Pvt Ltd's contact and notify them. No spam, no obligation.
Rooftop solar in Hyderabad, Telangana
A standard residential rooftop solar system in Hyderabad sizes between 1 kW and 5 kW depending on monthly consumption. Most Hyderabad homeowners pick a 3 kW system — it covers 300–400 units a month and captures the full ₹78,000 PM-Surya Ghar central subsidy.
Installed cost for a 3 kW system runs ₹1.8 lakh to ₹2.4 lakh; after the central subsidy your net outlay is ₹1.0 lakh to ₹1.6 lakh. Payback typically lands between 3.5 and 5 years — and the panels carry a 25-year warranty. Four Solar Energy Systems Pvt Ltd can quote your specific roof; use the Get Quote form above or call 092487 16892.
The installer handles the PM-Surya Ghar registration, DISCOM net-metering application, system installation, and commissioning. Confirm AMC terms, panel warranty (look for Tier-1 manufacturer + 25-year linear-power guarantee), and inverter warranty (10 years minimum) before signing.
What to check before booking
- Site visit and shading analysis — this determines the realistic kW your roof can support
- PM-Surya Ghar registration done on your behalf, with the ₹78,000 subsidy credited directly to your bank
- DISCOM net-metering application and commissioning — installer should handle this end-to-end
- Tier-1 panels with 25-year linear-power warranty (degradation ≤0.55% per year)
- Inverter warranty (10 years minimum) and on-site replacement policy
- AMC contract for at least 5 years (panel cleaning, performance check, inverter health)
Frequently asked questions
How much PM-Surya Ghar subsidy can I get in Hyderabad?
PM-Surya Ghar: Muft Bijli Yojana offers up to ₹78,000 for a residential rooftop solar system (₹30,000 per kW for the first 2 kW, ₹18,000 for the 3rd kW). Most households choose a 3 kW system to capture the full subsidy. Telangana residents apply through the national pmsuryaghar.gov.in portal — your DISCOM and the installer handle the rest.
What's the typical cost of a 3 kW system in Hyderabad?
A 3 kW grid-connected residential rooftop system costs ₹1.8 lakh to ₹2.4 lakh installed (₹60,000 – ₹80,000 per kW). After the ₹78,000 PM-Surya Ghar subsidy, your net cost is ₹1.0 lakh to ₹1.6 lakh. Payback for a typical household in Telangana is 3.5 – 5 years; the panels carry a 25-year warranty.
Does Four Solar Energy Systems Pvt Ltd handle net-metering paperwork?
Reputable solar installers handle the net-metering and DISCOM application end-to-end — site survey, design, DISCOM application, installation, commissioning, and meter installation. Confirm with Four Solar Energy Systems Pvt Ltd when you call (092487 16892) or fill the Get Quote form above.
What panels and inverters does Four Solar Energy Systems Pvt Ltd typically install?
For PM-Surya Ghar eligibility, panels must be from approved manufacturers — typically Tier-1 brands such as Adani, Vikram, Waaree, Tata Power Solar, Premier Energies, or Loom Solar. Inverters are usually Growatt, Solis, Microtek, Polycab, or Luminous. Ask for the specific model and the 25-year linear-power warranty document.
How long does installation take?
Typical timeline: 3 days for site survey + design, 10–20 days for DISCOM approval, 1–2 days for installation, 7–15 days for net-meter installation and commissioning. End-to-end is 4–8 weeks for most residential installations in Hyderabad.
Location
6-3-1109/1/P/402 4th Floor, Jewel Pawani Tower, Raj Bhavan Rd, Nishat Bagh Colony, Somajiguda, Hyderabad, Telangana 500082, India
View on Google Maps →Opening hours
| Sunday | Closed |
|---|---|
| Monday | 10:00 – 18:00 |
| Tuesday | 10:00 – 18:00 |
| Wednesday | 10:00 – 18:00 |
| Thursday | 10:00 – 18:00 |
| Friday | 10:00 – 18:00 |
| Saturday | 10:00 – 15:00 |
