Galaxy Solar Energy Pvt Ltd

Rooftop solar installer in Kolkata, West Bengal. ★ 4.6 (10 Google reviews) Updated June 2026.

About

A first visit can provide an initial assessment of the system's potential fit for the property's energy consumption profile. Customers in the Kolkata area often find that the return on investment is significantly influenced by the local electricity tariff structure. Understanding the current rate per unit of consumption is the primary factor in calculating a realistic payback period. For residential consumers, the payback timeline is generally shorter when the existing electricity tariff is high, as the savings realized from self-generation accumulate more quickly. Commercial properties with consistent, high daytime loads tend to see a more predictable and faster return on investment compared to those with highly variable usage patterns. A practical consideration for potential buyers is to model the system's output against the specific time-of-day consumption peaks. Integrating the system design with the local grid's peak tariff hours can optimize savings, ensuring that the generated power offsets the most expensive units of electricity consumed.

Get a quote from Galaxy Solar Energy Pvt Ltd

Galaxy Solar Energy Pvt Ltd hasn't yet confirmed lead notifications on GreenTax.in. Submit and we'll forward your enquiry to a verified active solar installer in Kolkata.

Rooftop solar in Kolkata, West Bengal

A standard residential rooftop solar system in Kolkata sizes between 1 kW and 5 kW depending on monthly consumption. Most Kolkata homeowners pick a 3 kW system — it covers 300–400 units a month and captures the full ₹78,000 PM-Surya Ghar central subsidy.

Installed cost for a 3 kW system runs ₹1.8 lakh to ₹2.4 lakh; after the central subsidy your net outlay is ₹1.0 lakh to ₹1.6 lakh. Payback typically lands between 3.5 and 5 years — and the panels carry a 25-year warranty. Galaxy Solar Energy Pvt Ltd can quote your specific roof; use the Get Quote form above or call directly.

The installer handles the PM-Surya Ghar registration, DISCOM net-metering application, system installation, and commissioning. Confirm AMC terms, panel warranty (look for Tier-1 manufacturer + 25-year linear-power guarantee), and inverter warranty (10 years minimum) before signing.

What to check before booking

  • Site visit and shading analysis — this determines the realistic kW your roof can support
  • PM-Surya Ghar registration done on your behalf, with the ₹78,000 subsidy credited directly to your bank
  • DISCOM net-metering application and commissioning — installer should handle this end-to-end
  • Tier-1 panels with 25-year linear-power warranty (degradation ≤0.55% per year)
  • Inverter warranty (10 years minimum) and on-site replacement policy
  • AMC contract for at least 5 years (panel cleaning, performance check, inverter health)

Frequently asked questions

How much PM-Surya Ghar subsidy can I get in Kolkata?

PM-Surya Ghar: Muft Bijli Yojana offers up to ₹78,000 for a residential rooftop solar system (₹30,000 per kW for the first 2 kW, ₹18,000 for the 3rd kW). Most households choose a 3 kW system to capture the full subsidy. West Bengal residents apply through the national pmsuryaghar.gov.in portal — your DISCOM and the installer handle the rest.

What's the typical cost of a 3 kW system in Kolkata?

A 3 kW grid-connected residential rooftop system costs ₹1.8 lakh to ₹2.4 lakh installed (₹60,000 – ₹80,000 per kW). After the ₹78,000 PM-Surya Ghar subsidy, your net cost is ₹1.0 lakh to ₹1.6 lakh. Payback for a typical household in West Bengal is 3.5 – 5 years; the panels carry a 25-year warranty.

Does Galaxy Solar Energy Pvt Ltd handle net-metering paperwork?

Reputable solar installers handle the net-metering and DISCOM application end-to-end — site survey, design, DISCOM application, installation, commissioning, and meter installation. Confirm with Galaxy Solar Energy Pvt Ltd when you call (see contact details) or fill the Get Quote form above.

What panels and inverters does Galaxy Solar Energy Pvt Ltd typically install?

For PM-Surya Ghar eligibility, panels must be from approved manufacturers — typically Tier-1 brands such as Adani, Vikram, Waaree, Tata Power Solar, Premier Energies, or Loom Solar. Inverters are usually Growatt, Solis, Microtek, Polycab, or Luminous. Ask for the specific model and the 25-year linear-power warranty document.

How long does installation take?

Typical timeline: 3 days for site survey + design, 10–20 days for DISCOM approval, 1–2 days for installation, 7–15 days for net-meter installation and commissioning. End-to-end is 4–8 weeks for most residential installations in Kolkata.

Location

Jindal Tower, Darga Rd, Park Circus, Beniapukur, Kolkata, West Bengal 700017, India

View on Google Maps →

Opening hours

SundayClosed
Monday09:00 – 18:30
Tuesday09:00 – 18:30
Wednesday09:00 – 18:30
Thursday09:00 – 18:30
Friday09:00 – 18:30
Saturday09:00 – 18:30
Chat with us