GLOBAL POWER SYSTEMS AND SOLUTIONS (SOLAR INSTALLATION SERVICE AND SOLAR PANELS DEALER)

Rooftop solar installer in Chennai, Tamil Nadu. ★ 5.0 (21 Google reviews) Updated June 2026.

About

Buyers considering solar energy solutions in Chennai will find this provider equipped to handle residential and commercial installations. The service includes options for annual maintenance contracts, which cover routine upkeep of the system. Furthermore, the company addresses panel cleaning needs and provides support following the initial installation to ensure system performance.

Get a quote from GLOBAL POWER SYSTEMS AND SOLUTIONS (SOLAR INSTALLATION SERVICE AND SOLAR PANELS DEALER)

Submit your name + phone to reveal GLOBAL POWER SYSTEMS AND SOLUTIONS (SOLAR INSTALLATION SERVICE AND SOLAR PANELS DEALER)'s contact and notify them. No spam, no obligation.

Rooftop solar in Chennai, Tamil Nadu

A standard residential rooftop solar system in Chennai sizes between 1 kW and 5 kW depending on monthly consumption. Most Chennai homeowners pick a 3 kW system — it covers 300–400 units a month and captures the full ₹78,000 PM-Surya Ghar central subsidy.

Installed cost for a 3 kW system runs ₹1.8 lakh to ₹2.4 lakh; after the central subsidy your net outlay is ₹1.0 lakh to ₹1.6 lakh. Payback typically lands between 3.5 and 5 years — and the panels carry a 25-year warranty. GLOBAL POWER SYSTEMS AND SOLUTIONS (SOLAR INSTALLATION SERVICE AND SOLAR PANELS DEALER) can quote your specific roof; use the Get Quote form above or call 098840 85333.

The installer handles the PM-Surya Ghar registration, DISCOM net-metering application, system installation, and commissioning. Confirm AMC terms, panel warranty (look for Tier-1 manufacturer + 25-year linear-power guarantee), and inverter warranty (10 years minimum) before signing.

What to check before booking

  • Site visit and shading analysis — this determines the realistic kW your roof can support
  • PM-Surya Ghar registration done on your behalf, with the ₹78,000 subsidy credited directly to your bank
  • DISCOM net-metering application and commissioning — installer should handle this end-to-end
  • Tier-1 panels with 25-year linear-power warranty (degradation ≤0.55% per year)
  • Inverter warranty (10 years minimum) and on-site replacement policy
  • AMC contract for at least 5 years (panel cleaning, performance check, inverter health)

Frequently asked questions

How much PM-Surya Ghar subsidy can I get in Chennai?

PM-Surya Ghar: Muft Bijli Yojana offers up to ₹78,000 for a residential rooftop solar system (₹30,000 per kW for the first 2 kW, ₹18,000 for the 3rd kW). Most households choose a 3 kW system to capture the full subsidy. Tamil Nadu residents apply through the national pmsuryaghar.gov.in portal — your DISCOM and the installer handle the rest.

What's the typical cost of a 3 kW system in Chennai?

A 3 kW grid-connected residential rooftop system costs ₹1.8 lakh to ₹2.4 lakh installed (₹60,000 – ₹80,000 per kW). After the ₹78,000 PM-Surya Ghar subsidy, your net cost is ₹1.0 lakh to ₹1.6 lakh. Payback for a typical household in Tamil Nadu is 3.5 – 5 years; the panels carry a 25-year warranty.

Does GLOBAL POWER SYSTEMS AND SOLUTIONS (SOLAR INSTALLATION SERVICE AND SOLAR PANELS DEALER) handle net-metering paperwork?

Reputable solar installers handle the net-metering and DISCOM application end-to-end — site survey, design, DISCOM application, installation, commissioning, and meter installation. Confirm with GLOBAL POWER SYSTEMS AND SOLUTIONS (SOLAR INSTALLATION SERVICE AND SOLAR PANELS DEALER) when you call (098840 85333) or fill the Get Quote form above.

What panels and inverters does GLOBAL POWER SYSTEMS AND SOLUTIONS (SOLAR INSTALLATION SERVICE AND SOLAR PANELS DEALER) typically install?

For PM-Surya Ghar eligibility, panels must be from approved manufacturers — typically Tier-1 brands such as Adani, Vikram, Waaree, Tata Power Solar, Premier Energies, or Loom Solar. Inverters are usually Growatt, Solis, Microtek, Polycab, or Luminous. Ask for the specific model and the 25-year linear-power warranty document.

How long does installation take?

Typical timeline: 3 days for site survey + design, 10–20 days for DISCOM approval, 1–2 days for installation, 7–15 days for net-meter installation and commissioning. End-to-end is 4–8 weeks for most residential installations in Chennai.

Location

No-48B, 2, Gandhi Nagar 1st Main Rd, Gandhi Nagar, Adyar, Chennai, Tamil Nadu 600020, India

View on Google Maps →

Opening hours

Sunday09:00 – 12:30
Monday09:00 – 18:30
Tuesday09:00 – 18:30
Wednesday09:00 – 18:30
Thursday09:00 – 18:30
Friday09:00 – 18:30
Saturday09:00 – 18:30
Chat with us