About
The high humidity and dense urban environment of Mumbai necessitate careful planning for solar photovoltaic installations. Customers in this area often benefit from reliable power generation due to fluctuating grid stability. For property owners seeking to integrate solar energy, a thorough site survey is a critical first step. This process involves assessing the roof's structural integrity and analyzing potential shading sources throughout the day. A detailed shading analysis helps determine the optimal panel placement to maximize energy capture. The final system size, measured in kilowatts (kW), is not determined by the roof's total area but by the usable, unshaded surface space. Experienced installers evaluate the roof's orientation and pitch to calculate the realistic kW capacity the structure can safely support while maintaining peak performance. Individuals or commercial entities with consistent daytime energy demands, such as small businesses or residential complexes, are typically the best fit for solar adoption in this region. Obtaining a precise assessment of the available roof space and the achievable kW rating ensures that the installed system meets the actual energy needs of the property.
Get a quote from Go Mumbai Solar LLP EPC
Submit your name + phone to reveal Go Mumbai Solar LLP EPC's contact and notify them. No spam, no obligation.
Rooftop solar in Mumbai, Maharashtra
A standard residential rooftop solar system in Mumbai sizes between 1 kW and 5 kW depending on monthly consumption. Most Mumbai homeowners pick a 3 kW system — it covers 300–400 units a month and captures the full ₹78,000 PM-Surya Ghar central subsidy.
Installed cost for a 3 kW system runs ₹1.8 lakh to ₹2.4 lakh; after the central subsidy your net outlay is ₹1.0 lakh to ₹1.6 lakh. Payback typically lands between 3.5 and 5 years — and the panels carry a 25-year warranty. Go Mumbai Solar LLP EPC can quote your specific roof; use the Get Quote form above or call 084336 00378.
The installer handles the PM-Surya Ghar registration, DISCOM net-metering application, system installation, and commissioning. Confirm AMC terms, panel warranty (look for Tier-1 manufacturer + 25-year linear-power guarantee), and inverter warranty (10 years minimum) before signing.
What to check before booking
- Site visit and shading analysis — this determines the realistic kW your roof can support
- PM-Surya Ghar registration done on your behalf, with the ₹78,000 subsidy credited directly to your bank
- DISCOM net-metering application and commissioning — installer should handle this end-to-end
- Tier-1 panels with 25-year linear-power warranty (degradation ≤0.55% per year)
- Inverter warranty (10 years minimum) and on-site replacement policy
- AMC contract for at least 5 years (panel cleaning, performance check, inverter health)
Frequently asked questions
How much PM-Surya Ghar subsidy can I get in Mumbai?
PM-Surya Ghar: Muft Bijli Yojana offers up to ₹78,000 for a residential rooftop solar system (₹30,000 per kW for the first 2 kW, ₹18,000 for the 3rd kW). Most households choose a 3 kW system to capture the full subsidy. Maharashtra residents apply through the national pmsuryaghar.gov.in portal — your DISCOM and the installer handle the rest.
What's the typical cost of a 3 kW system in Mumbai?
A 3 kW grid-connected residential rooftop system costs ₹1.8 lakh to ₹2.4 lakh installed (₹60,000 – ₹80,000 per kW). After the ₹78,000 PM-Surya Ghar subsidy, your net cost is ₹1.0 lakh to ₹1.6 lakh. Payback for a typical household in Maharashtra is 3.5 – 5 years; the panels carry a 25-year warranty.
Does Go Mumbai Solar LLP EPC handle net-metering paperwork?
Reputable solar installers handle the net-metering and DISCOM application end-to-end — site survey, design, DISCOM application, installation, commissioning, and meter installation. Confirm with Go Mumbai Solar LLP EPC when you call (084336 00378) or fill the Get Quote form above.
What panels and inverters does Go Mumbai Solar LLP EPC typically install?
For PM-Surya Ghar eligibility, panels must be from approved manufacturers — typically Tier-1 brands such as Adani, Vikram, Waaree, Tata Power Solar, Premier Energies, or Loom Solar. Inverters are usually Growatt, Solis, Microtek, Polycab, or Luminous. Ask for the specific model and the 25-year linear-power warranty document.
How long does installation take?
Typical timeline: 3 days for site survey + design, 10–20 days for DISCOM approval, 1–2 days for installation, 7–15 days for net-meter installation and commissioning. End-to-end is 4–8 weeks for most residential installations in Mumbai.
Location
Shop No : 14, B Wing , Chuim Village Road, Jai Hind Trimurti CHS, 16th Rd, Pyari Nagar, Hanuman Nagar, Khar West, Mumbai, Maharashtra 400052, India
View on Google Maps →Opening hours
| Sunday | Closed |
|---|---|
| Monday | 10:00 – 19:00 |
| Tuesday | 10:00 – 19:00 |
| Wednesday | 10:00 – 19:00 |
| Thursday | 10:00 – 19:00 |
| Friday | 10:00 – 19:00 |
| Saturday | 10:00 – 19:00 |