GoSolar Power Systems

Rooftop solar installer in Kolkata, West Bengal. ★ 4.7 (23 Google reviews) Updated June 2026.

About

Individuals seeking to integrate solar power into existing residential or commercial structures often visit this facility. The service provides expertise related to rooftop solar installations across the Kolkata region. When pursuing grid connectivity, understanding the local distribution company's requirements is a key consideration. The process for obtaining net-metering approval from the local utility involves specific documentation and adherence to regional guidelines. Customers should anticipate that the processing timeline for these applications can vary based on the current workload and procedural requirements of the relevant DISCOM. Consulting with local experts can help navigate the necessary paperwork and submission protocols required to move the interconnection process forward efficiently.

Get a quote from GoSolar Power Systems

Submit your name + phone to reveal GoSolar Power Systems's contact and notify them. No spam, no obligation.

Rooftop solar in Kolkata, West Bengal

A standard residential rooftop solar system in Kolkata sizes between 1 kW and 5 kW depending on monthly consumption. Most Kolkata homeowners pick a 3 kW system — it covers 300–400 units a month and captures the full ₹78,000 PM-Surya Ghar central subsidy.

Installed cost for a 3 kW system runs ₹1.8 lakh to ₹2.4 lakh; after the central subsidy your net outlay is ₹1.0 lakh to ₹1.6 lakh. Payback typically lands between 3.5 and 5 years — and the panels carry a 25-year warranty. GoSolar Power Systems can quote your specific roof; use the Get Quote form above or call 091633 63525.

The installer handles the PM-Surya Ghar registration, DISCOM net-metering application, system installation, and commissioning. Confirm AMC terms, panel warranty (look for Tier-1 manufacturer + 25-year linear-power guarantee), and inverter warranty (10 years minimum) before signing.

What to check before booking

  • Site visit and shading analysis — this determines the realistic kW your roof can support
  • PM-Surya Ghar registration done on your behalf, with the ₹78,000 subsidy credited directly to your bank
  • DISCOM net-metering application and commissioning — installer should handle this end-to-end
  • Tier-1 panels with 25-year linear-power warranty (degradation ≤0.55% per year)
  • Inverter warranty (10 years minimum) and on-site replacement policy
  • AMC contract for at least 5 years (panel cleaning, performance check, inverter health)

Frequently asked questions

How much PM-Surya Ghar subsidy can I get in Kolkata?

PM-Surya Ghar: Muft Bijli Yojana offers up to ₹78,000 for a residential rooftop solar system (₹30,000 per kW for the first 2 kW, ₹18,000 for the 3rd kW). Most households choose a 3 kW system to capture the full subsidy. West Bengal residents apply through the national pmsuryaghar.gov.in portal — your DISCOM and the installer handle the rest.

What's the typical cost of a 3 kW system in Kolkata?

A 3 kW grid-connected residential rooftop system costs ₹1.8 lakh to ₹2.4 lakh installed (₹60,000 – ₹80,000 per kW). After the ₹78,000 PM-Surya Ghar subsidy, your net cost is ₹1.0 lakh to ₹1.6 lakh. Payback for a typical household in West Bengal is 3.5 – 5 years; the panels carry a 25-year warranty.

Does GoSolar Power Systems handle net-metering paperwork?

Reputable solar installers handle the net-metering and DISCOM application end-to-end — site survey, design, DISCOM application, installation, commissioning, and meter installation. Confirm with GoSolar Power Systems when you call (091633 63525) or fill the Get Quote form above.

What panels and inverters does GoSolar Power Systems typically install?

For PM-Surya Ghar eligibility, panels must be from approved manufacturers — typically Tier-1 brands such as Adani, Vikram, Waaree, Tata Power Solar, Premier Energies, or Loom Solar. Inverters are usually Growatt, Solis, Microtek, Polycab, or Luminous. Ask for the specific model and the 25-year linear-power warranty document.

How long does installation take?

Typical timeline: 3 days for site survey + design, 10–20 days for DISCOM approval, 1–2 days for installation, 7–15 days for net-meter installation and commissioning. End-to-end is 4–8 weeks for most residential installations in Kolkata.

Location

GoSolar Power Systems, 24, opposite More Super market, Vivekananda Nagar, Barua Para, Ashok Nagar, Regent Park, Kolkata, West Bengal 700040, India

View on Google Maps →

Opening hours

SundayClosed
Monday10:30 – 18:30
Tuesday10:30 – 18:30
Wednesday10:30 – 18:30
Thursday10:30 – 18:30
Friday10:30 – 18:30
Saturday10:30 – 14:00
Chat with us