About
Homeowners and commercial property owners in the Varanasi area often visit this facility when seeking to integrate solar energy into existing structures. The local electricity tariff structure significantly influences the financial viability of a solar installation. When calculating the return on investment, the current rate of electricity consumption relative to the system's generation capacity is a key factor. A detailed assessment of the household's energy profile against the prevailing utility rates allows for a more accurate projection of the payback period. Considering the local grid tariffs, the payback timeline is directly correlated with the percentage of energy the system can offset from the grid. This analysis helps determine the point at which self-generated power savings begin to exceed the initial investment cost. Furthermore, understanding the long-term stability of the local tariff rates is important for projecting the overall return on investment. The system's performance metrics, when benchmarked against the established local energy costs, provide a clear picture of the potential savings over the system's operational lifespan.
Get a quote from Green earth solar energy
Submit your name + phone to reveal Green earth solar energy's contact and notify them. No spam, no obligation.
Rooftop solar in Varanasi, Uttar Pradesh
A standard residential rooftop solar system in Varanasi sizes between 1 kW and 5 kW depending on monthly consumption. Most Varanasi homeowners pick a 3 kW system — it covers 300–400 units a month and captures the full ₹78,000 PM-Surya Ghar central subsidy.
Installed cost for a 3 kW system runs ₹1.8 lakh to ₹2.4 lakh; after the central subsidy your net outlay is ₹1.0 lakh to ₹1.6 lakh. Payback typically lands between 3.5 and 5 years — and the panels carry a 25-year warranty. Green earth solar energy can quote your specific roof; use the Get Quote form above or call 095065 76783.
The installer handles the PM-Surya Ghar registration, DISCOM net-metering application, system installation, and commissioning. Confirm AMC terms, panel warranty (look for Tier-1 manufacturer + 25-year linear-power guarantee), and inverter warranty (10 years minimum) before signing.
What to check before booking
- Site visit and shading analysis — this determines the realistic kW your roof can support
- PM-Surya Ghar registration done on your behalf, with the ₹78,000 subsidy credited directly to your bank
- DISCOM net-metering application and commissioning — installer should handle this end-to-end
- Tier-1 panels with 25-year linear-power warranty (degradation ≤0.55% per year)
- Inverter warranty (10 years minimum) and on-site replacement policy
- AMC contract for at least 5 years (panel cleaning, performance check, inverter health)
Frequently asked questions
How much PM-Surya Ghar subsidy can I get in Varanasi?
PM-Surya Ghar: Muft Bijli Yojana offers up to ₹78,000 for a residential rooftop solar system (₹30,000 per kW for the first 2 kW, ₹18,000 for the 3rd kW). Most households choose a 3 kW system to capture the full subsidy. Uttar Pradesh residents apply through the national pmsuryaghar.gov.in portal — your DISCOM and the installer handle the rest.
What's the typical cost of a 3 kW system in Varanasi?
A 3 kW grid-connected residential rooftop system costs ₹1.8 lakh to ₹2.4 lakh installed (₹60,000 – ₹80,000 per kW). After the ₹78,000 PM-Surya Ghar subsidy, your net cost is ₹1.0 lakh to ₹1.6 lakh. Payback for a typical household in Uttar Pradesh is 3.5 – 5 years; the panels carry a 25-year warranty.
Does Green earth solar energy handle net-metering paperwork?
Reputable solar installers handle the net-metering and DISCOM application end-to-end — site survey, design, DISCOM application, installation, commissioning, and meter installation. Confirm with Green earth solar energy when you call (095065 76783) or fill the Get Quote form above.
What panels and inverters does Green earth solar energy typically install?
For PM-Surya Ghar eligibility, panels must be from approved manufacturers — typically Tier-1 brands such as Adani, Vikram, Waaree, Tata Power Solar, Premier Energies, or Loom Solar. Inverters are usually Growatt, Solis, Microtek, Polycab, or Luminous. Ask for the specific model and the 25-year linear-power warranty document.
How long does installation take?
Typical timeline: 3 days for site survey + design, 10–20 days for DISCOM approval, 1–2 days for installation, 7–15 days for net-meter installation and commissioning. End-to-end is 4–8 weeks for most residential installations in Varanasi.
Location
Bhadohi Rd, Chandpur, Varanasi, Uttar Pradesh 221107, India
View on Google Maps →Opening hours
| Sunday | 10:00 – 18:00 |
|---|---|
| Monday | 10:00 – 18:00 |
| Tuesday | 10:00 – 18:00 |
| Wednesday | 10:00 – 18:00 |
| Thursday | 10:00 – 18:00 |
| Friday | 10:00 – 18:00 |
| Saturday | 10:00 – 18:00 |
