About
Visitors to this facility can expect guidance regarding the initial steps for integrating solar power into residential or commercial structures. Individuals or businesses looking to utilize rooftop solar systems in the Ghaziabad area may find the local expertise relevant for navigating regional energy requirements. When considering grid connectivity, understanding the process for DISCOM net-metering applications is a key consideration. The timeline for utility approval can vary, and the speed at which the local distribution company processes these applications directly impacts project commencement. To streamline the process, it is advisable for prospective clients to gather all property documentation and utility account details before initiating the formal net-metering request. This preparation helps minimize delays caused by incomplete paperwork during the utility review phase.
Get a quote from Gupta solar energy
Submit your name + phone to reveal Gupta solar energy's contact and notify them. No spam, no obligation.
Rooftop solar in Ghaziabad, Uttar Pradesh
A standard residential rooftop solar system in Ghaziabad sizes between 1 kW and 5 kW depending on monthly consumption. Most Ghaziabad homeowners pick a 3 kW system — it covers 300–400 units a month and captures the full ₹78,000 PM-Surya Ghar central subsidy.
Installed cost for a 3 kW system runs ₹1.8 lakh to ₹2.4 lakh; after the central subsidy your net outlay is ₹1.0 lakh to ₹1.6 lakh. Payback typically lands between 3.5 and 5 years — and the panels carry a 25-year warranty. Gupta solar energy can quote your specific roof; use the Get Quote form above or call 070426 36015.
The installer handles the PM-Surya Ghar registration, DISCOM net-metering application, system installation, and commissioning. Confirm AMC terms, panel warranty (look for Tier-1 manufacturer + 25-year linear-power guarantee), and inverter warranty (10 years minimum) before signing.
What to check before booking
- Site visit and shading analysis — this determines the realistic kW your roof can support
- PM-Surya Ghar registration done on your behalf, with the ₹78,000 subsidy credited directly to your bank
- DISCOM net-metering application and commissioning — installer should handle this end-to-end
- Tier-1 panels with 25-year linear-power warranty (degradation ≤0.55% per year)
- Inverter warranty (10 years minimum) and on-site replacement policy
- AMC contract for at least 5 years (panel cleaning, performance check, inverter health)
Frequently asked questions
How much PM-Surya Ghar subsidy can I get in Ghaziabad?
PM-Surya Ghar: Muft Bijli Yojana offers up to ₹78,000 for a residential rooftop solar system (₹30,000 per kW for the first 2 kW, ₹18,000 for the 3rd kW). Most households choose a 3 kW system to capture the full subsidy. Uttar Pradesh residents apply through the national pmsuryaghar.gov.in portal — your DISCOM and the installer handle the rest.
What's the typical cost of a 3 kW system in Ghaziabad?
A 3 kW grid-connected residential rooftop system costs ₹1.8 lakh to ₹2.4 lakh installed (₹60,000 – ₹80,000 per kW). After the ₹78,000 PM-Surya Ghar subsidy, your net cost is ₹1.0 lakh to ₹1.6 lakh. Payback for a typical household in Uttar Pradesh is 3.5 – 5 years; the panels carry a 25-year warranty.
Does Gupta solar energy handle net-metering paperwork?
Reputable solar installers handle the net-metering and DISCOM application end-to-end — site survey, design, DISCOM application, installation, commissioning, and meter installation. Confirm with Gupta solar energy when you call (070426 36015) or fill the Get Quote form above.
What panels and inverters does Gupta solar energy typically install?
For PM-Surya Ghar eligibility, panels must be from approved manufacturers — typically Tier-1 brands such as Adani, Vikram, Waaree, Tata Power Solar, Premier Energies, or Loom Solar. Inverters are usually Growatt, Solis, Microtek, Polycab, or Luminous. Ask for the specific model and the 25-year linear-power warranty document.
How long does installation take?
Typical timeline: 3 days for site survey + design, 10–20 days for DISCOM approval, 1–2 days for installation, 7–15 days for net-meter installation and commissioning. End-to-end is 4–8 weeks for most residential installations in Ghaziabad.
Location
60A, 3rd, Jagdish Nagar, Patel Nagar 1, Patel Nagar, Ghaziabad, Uttar Pradesh 201001, India
View on Google Maps →Opening hours
| Sunday | 10:00 – 20:00 |
|---|---|
| Monday | 10:00 – 20:00 |
| Tuesday | 10:00 – 20:00 |
| Wednesday | 10:00 – 20:00 |
| Thursday | 10:00 – 20:00 |
| Friday | 10:00 – 15:00 |
| Saturday | 10:00 – 20:00 |
