About
Visitors to this facility can expect consultation regarding residential and commercial rooftop solar installations tailored for the Madurai climate. The expertise available covers the selection of appropriate inverter systems, which is a critical component influencing the overall performance and longevity of the solar array. When determining the correct inverter size and type, the team assesses the specific energy requirements of the property to ensure optimal integration with the installed panels. Regarding after-sales support, the company provides details on the warranty structure for both the equipment and the workmanship. Furthermore, the service agreement outlines the procedure for on-site replacement should a component fail, providing clarity on the process for maintaining system uptime. This makes the location suitable for property owners in Tamil Nadu who require a comprehensive understanding of system maintenance protocols alongside the initial installation process.
Get a quote from GV Solar Power
Submit your name + phone to reveal GV Solar Power's contact and notify them. No spam, no obligation.
Rooftop solar in Madurai, Tamil Nadu
A standard residential rooftop solar system in Madurai sizes between 1 kW and 5 kW depending on monthly consumption. Most Madurai homeowners pick a 3 kW system — it covers 300–400 units a month and captures the full ₹78,000 PM-Surya Ghar central subsidy.
Installed cost for a 3 kW system runs ₹1.8 lakh to ₹2.4 lakh; after the central subsidy your net outlay is ₹1.0 lakh to ₹1.6 lakh. Payback typically lands between 3.5 and 5 years — and the panels carry a 25-year warranty. GV Solar Power can quote your specific roof; use the Get Quote form above or call 098423 44350.
The installer handles the PM-Surya Ghar registration, DISCOM net-metering application, system installation, and commissioning. Confirm AMC terms, panel warranty (look for Tier-1 manufacturer + 25-year linear-power guarantee), and inverter warranty (10 years minimum) before signing.
What to check before booking
- Site visit and shading analysis — this determines the realistic kW your roof can support
- PM-Surya Ghar registration done on your behalf, with the ₹78,000 subsidy credited directly to your bank
- DISCOM net-metering application and commissioning — installer should handle this end-to-end
- Tier-1 panels with 25-year linear-power warranty (degradation ≤0.55% per year)
- Inverter warranty (10 years minimum) and on-site replacement policy
- AMC contract for at least 5 years (panel cleaning, performance check, inverter health)
Frequently asked questions
How much PM-Surya Ghar subsidy can I get in Madurai?
PM-Surya Ghar: Muft Bijli Yojana offers up to ₹78,000 for a residential rooftop solar system (₹30,000 per kW for the first 2 kW, ₹18,000 for the 3rd kW). Most households choose a 3 kW system to capture the full subsidy. Tamil Nadu residents apply through the national pmsuryaghar.gov.in portal — your DISCOM and the installer handle the rest.
What's the typical cost of a 3 kW system in Madurai?
A 3 kW grid-connected residential rooftop system costs ₹1.8 lakh to ₹2.4 lakh installed (₹60,000 – ₹80,000 per kW). After the ₹78,000 PM-Surya Ghar subsidy, your net cost is ₹1.0 lakh to ₹1.6 lakh. Payback for a typical household in Tamil Nadu is 3.5 – 5 years; the panels carry a 25-year warranty.
Does GV Solar Power handle net-metering paperwork?
Reputable solar installers handle the net-metering and DISCOM application end-to-end — site survey, design, DISCOM application, installation, commissioning, and meter installation. Confirm with GV Solar Power when you call (098423 44350) or fill the Get Quote form above.
What panels and inverters does GV Solar Power typically install?
For PM-Surya Ghar eligibility, panels must be from approved manufacturers — typically Tier-1 brands such as Adani, Vikram, Waaree, Tata Power Solar, Premier Energies, or Loom Solar. Inverters are usually Growatt, Solis, Microtek, Polycab, or Luminous. Ask for the specific model and the 25-year linear-power warranty document.
How long does installation take?
Typical timeline: 3 days for site survey + design, 10–20 days for DISCOM approval, 1–2 days for installation, 7–15 days for net-meter installation and commissioning. End-to-end is 4–8 weeks for most residential installations in Madurai.
Location
31, Koodal Alagar Perumal Koil St, opposite Kodal Alagar Perumal Temple, Periyar, Madurai Main, Madurai, Tamil Nadu 625001, India
View on Google Maps →Opening hours
| Sunday | Closed |
|---|---|
| Monday | 10:00 – 21:00 |
| Tuesday | 10:00 – 21:00 |
| Wednesday | 10:00 – 21:00 |
| Thursday | 10:00 – 21:00 |
| Friday | 10:00 – 21:00 |
| Saturday | 10:00 – 21:00 |
