Hyde Source-Rooftop Solar-Home, Offices, Apartments

Rooftop solar installer in Bengaluru, Karnataka. ★ 5.0 (20 Google reviews) Updated June 2026.

About

Individuals seeking solar energy solutions for residential homes, offices, and apartments in the Bengaluru area often visit this facility. The service provider handles installations across various property types, including rooftops. Regarding ongoing maintenance, the company offers Annual Maintenance Contracts (AMC) to support the system's longevity. They provide guidance on the appropriate frequency for panel cleaning to ensure optimal energy capture. Furthermore, the scope of support extends to post-installation assistance, helping owners manage the system's performance over time.

Get a quote from Hyde Source-Rooftop Solar-Home, Offices, Apartments

Submit your name + phone to reveal Hyde Source-Rooftop Solar-Home, Offices, Apartments's contact and notify them. No spam, no obligation.

Rooftop solar in Bengaluru, Karnataka

A standard residential rooftop solar system in Bengaluru sizes between 1 kW and 5 kW depending on monthly consumption. Most Bengaluru homeowners pick a 3 kW system — it covers 300–400 units a month and captures the full ₹78,000 PM-Surya Ghar central subsidy.

Installed cost for a 3 kW system runs ₹1.8 lakh to ₹2.4 lakh; after the central subsidy your net outlay is ₹1.0 lakh to ₹1.6 lakh. Payback typically lands between 3.5 and 5 years — and the panels carry a 25-year warranty. Hyde Source-Rooftop Solar-Home, Offices, Apartments can quote your specific roof; use the Get Quote form above or call 093807 81216.

The installer handles the PM-Surya Ghar registration, DISCOM net-metering application, system installation, and commissioning. Confirm AMC terms, panel warranty (look for Tier-1 manufacturer + 25-year linear-power guarantee), and inverter warranty (10 years minimum) before signing.

What to check before booking

  • Site visit and shading analysis — this determines the realistic kW your roof can support
  • PM-Surya Ghar registration done on your behalf, with the ₹78,000 subsidy credited directly to your bank
  • DISCOM net-metering application and commissioning — installer should handle this end-to-end
  • Tier-1 panels with 25-year linear-power warranty (degradation ≤0.55% per year)
  • Inverter warranty (10 years minimum) and on-site replacement policy
  • AMC contract for at least 5 years (panel cleaning, performance check, inverter health)

Frequently asked questions

How much PM-Surya Ghar subsidy can I get in Bengaluru?

PM-Surya Ghar: Muft Bijli Yojana offers up to ₹78,000 for a residential rooftop solar system (₹30,000 per kW for the first 2 kW, ₹18,000 for the 3rd kW). Most households choose a 3 kW system to capture the full subsidy. Karnataka residents apply through the national pmsuryaghar.gov.in portal — your DISCOM and the installer handle the rest.

What's the typical cost of a 3 kW system in Bengaluru?

A 3 kW grid-connected residential rooftop system costs ₹1.8 lakh to ₹2.4 lakh installed (₹60,000 – ₹80,000 per kW). After the ₹78,000 PM-Surya Ghar subsidy, your net cost is ₹1.0 lakh to ₹1.6 lakh. Payback for a typical household in Karnataka is 3.5 – 5 years; the panels carry a 25-year warranty.

Does Hyde Source-Rooftop Solar-Home, Offices, Apartments handle net-metering paperwork?

Reputable solar installers handle the net-metering and DISCOM application end-to-end — site survey, design, DISCOM application, installation, commissioning, and meter installation. Confirm with Hyde Source-Rooftop Solar-Home, Offices, Apartments when you call (093807 81216) or fill the Get Quote form above.

What panels and inverters does Hyde Source-Rooftop Solar-Home, Offices, Apartments typically install?

For PM-Surya Ghar eligibility, panels must be from approved manufacturers — typically Tier-1 brands such as Adani, Vikram, Waaree, Tata Power Solar, Premier Energies, or Loom Solar. Inverters are usually Growatt, Solis, Microtek, Polycab, or Luminous. Ask for the specific model and the 25-year linear-power warranty document.

How long does installation take?

Typical timeline: 3 days for site survey + design, 10–20 days for DISCOM approval, 1–2 days for installation, 7–15 days for net-meter installation and commissioning. End-to-end is 4–8 weeks for most residential installations in Bengaluru.

Location

2nd Floor, 198, Chinmaya Mission Hospital Rd, Stage 2, Hoysala Nagar, Indiranagar, Bengaluru, Karnataka 560038, India

View on Google Maps →

Opening hours

SundayClosed
Monday10:00 – 19:00
Tuesday10:00 – 19:00
Wednesday10:00 – 19:00
Thursday10:00 – 19:00
Friday10:00 – 19:00
SaturdayClosed
Chat with us