IGI Solar

Rooftop solar installer in Vijayawada, Andhra Pradesh. ★ 5.0 (11 Google reviews) Updated August 2026.

About

Rooftop solar installations provide an option for generating decentralized electricity for residential and commercial properties. Individuals and businesses in the Vijayawada area seeking to integrate solar power into their existing electrical infrastructure can utilize this service provider. The process of connecting a solar system to the local grid involves navigating the DISCOM net-metering application process. Understanding the local utility's current processing timelines is a key consideration for project planning. Successful grid integration requires adherence to specific utility guidelines, and the time taken for the local distribution company to approve and finalize the net-metering connection can vary. Prospective customers should inquire about the typical documentation required by the local utility to streamline the application submission. This attention to the interconnection phase helps ensure that the system design aligns with the operational parameters of the regional power grid.

Get a quote from IGI Solar

IGI Solar hasn't yet confirmed lead notifications on GreenTax.in. Submit and we'll forward your enquiry to a verified active solar installer in Vijayawada.

Rooftop solar in Vijayawada, Andhra Pradesh

A standard residential rooftop solar system in Vijayawada sizes between 1 kW and 5 kW depending on monthly consumption. Most Vijayawada homeowners pick a 3 kW system — it covers 300–400 units a month and captures the full ₹78,000 PM-Surya Ghar central subsidy.

Installed cost for a 3 kW system runs ₹1.8 lakh to ₹2.4 lakh; after the central subsidy your net outlay is ₹1.0 lakh to ₹1.6 lakh. Payback typically lands between 3.5 and 5 years — and the panels carry a 25-year warranty. IGI Solar can quote your specific roof; use the Get Quote form above or call 084999 99913.

The installer handles the PM-Surya Ghar registration, DISCOM net-metering application, system installation, and commissioning. Confirm AMC terms, panel warranty (look for Tier-1 manufacturer + 25-year linear-power guarantee), and inverter warranty (10 years minimum) before signing.

What to check before booking

  • Site visit and shading analysis — this determines the realistic kW your roof can support
  • PM-Surya Ghar registration done on your behalf, with the ₹78,000 subsidy credited directly to your bank
  • DISCOM net-metering application and commissioning — installer should handle this end-to-end
  • Tier-1 panels with 25-year linear-power warranty (degradation ≤0.55% per year)
  • Inverter warranty (10 years minimum) and on-site replacement policy
  • AMC contract for at least 5 years (panel cleaning, performance check, inverter health)

Frequently asked questions

How much PM-Surya Ghar subsidy can I get in Vijayawada?

PM-Surya Ghar: Muft Bijli Yojana offers up to ₹78,000 for a residential rooftop solar system (₹30,000 per kW for the first 2 kW, ₹18,000 for the 3rd kW). Most households choose a 3 kW system to capture the full subsidy. Andhra Pradesh residents apply through the national pmsuryaghar.gov.in portal — your DISCOM and the installer handle the rest.

What's the typical cost of a 3 kW system in Vijayawada?

A 3 kW grid-connected residential rooftop system costs ₹1.8 lakh to ₹2.4 lakh installed (₹60,000 – ₹80,000 per kW). After the ₹78,000 PM-Surya Ghar subsidy, your net cost is ₹1.0 lakh to ₹1.6 lakh. Payback for a typical household in Andhra Pradesh is 3.5 – 5 years; the panels carry a 25-year warranty.

Does IGI Solar handle net-metering paperwork?

Reputable solar installers handle the net-metering and DISCOM application end-to-end — site survey, design, DISCOM application, installation, commissioning, and meter installation. Confirm with IGI Solar when you call (084999 99913) or fill the Get Quote form above.

What panels and inverters does IGI Solar typically install?

For PM-Surya Ghar eligibility, panels must be from approved manufacturers — typically Tier-1 brands such as Adani, Vikram, Waaree, Tata Power Solar, Premier Energies, or Loom Solar. Inverters are usually Growatt, Solis, Microtek, Polycab, or Luminous. Ask for the specific model and the 25-year linear-power warranty document.

How long does installation take?

Typical timeline: 3 days for site survey + design, 10–20 days for DISCOM approval, 1–2 days for installation, 7–15 days for net-meter installation and commissioning. End-to-end is 4–8 weeks for most residential installations in Vijayawada.

Location

Vidhyadharapuram Main Rd, Jojinagar, Vijayawada, Andhra Pradesh 520012, India

View on Google Maps →

Opening hours

Sunday09:00 – 22:00
Monday09:00 – 22:00
Tuesday09:00 – 22:00
Wednesday09:00 – 22:00
Thursday09:00 – 22:00
Friday09:00 – 22:00
Saturday09:00 – 22:00
Chat with us