About
When assessing local options for rooftop solar installations, understanding the subsidy process is a key consideration. Customers in the Indore area who are pursuing government incentives for solar power generation should familiarize themselves with the PM-Surya Ghar scheme requirements. Initiating the subsidy paperwork requires attention to timing, as the application process must align with the current guidelines set by the relevant nodal agency. Generally, prospective buyers should prepare documentation such as proof of residency, electricity connection details, and ownership documents for the property. Consulting with the local team regarding the specific checklist of required papers before starting the application is advisable to ensure a smooth submission.
Get a quote from Indore Solar Energy Solution Pvt. Ltd.
Submit your name + phone to reveal Indore Solar Energy Solution Pvt. Ltd.'s contact and notify them. No spam, no obligation.
Rooftop solar in Indore, Madhya Pradesh
A standard residential rooftop solar system in Indore sizes between 1 kW and 5 kW depending on monthly consumption. Most Indore homeowners pick a 3 kW system — it covers 300–400 units a month and captures the full ₹78,000 PM-Surya Ghar central subsidy.
Installed cost for a 3 kW system runs ₹1.8 lakh to ₹2.4 lakh; after the central subsidy your net outlay is ₹1.0 lakh to ₹1.6 lakh. Payback typically lands between 3.5 and 5 years — and the panels carry a 25-year warranty. Indore Solar Energy Solution Pvt. Ltd. can quote your specific roof; use the Get Quote form above or call 089823 04701.
The installer handles the PM-Surya Ghar registration, DISCOM net-metering application, system installation, and commissioning. Confirm AMC terms, panel warranty (look for Tier-1 manufacturer + 25-year linear-power guarantee), and inverter warranty (10 years minimum) before signing.
What to check before booking
- Site visit and shading analysis — this determines the realistic kW your roof can support
- PM-Surya Ghar registration done on your behalf, with the ₹78,000 subsidy credited directly to your bank
- DISCOM net-metering application and commissioning — installer should handle this end-to-end
- Tier-1 panels with 25-year linear-power warranty (degradation ≤0.55% per year)
- Inverter warranty (10 years minimum) and on-site replacement policy
- AMC contract for at least 5 years (panel cleaning, performance check, inverter health)
Frequently asked questions
How much PM-Surya Ghar subsidy can I get in Indore?
PM-Surya Ghar: Muft Bijli Yojana offers up to ₹78,000 for a residential rooftop solar system (₹30,000 per kW for the first 2 kW, ₹18,000 for the 3rd kW). Most households choose a 3 kW system to capture the full subsidy. Madhya Pradesh residents apply through the national pmsuryaghar.gov.in portal — your DISCOM and the installer handle the rest.
What's the typical cost of a 3 kW system in Indore?
A 3 kW grid-connected residential rooftop system costs ₹1.8 lakh to ₹2.4 lakh installed (₹60,000 – ₹80,000 per kW). After the ₹78,000 PM-Surya Ghar subsidy, your net cost is ₹1.0 lakh to ₹1.6 lakh. Payback for a typical household in Madhya Pradesh is 3.5 – 5 years; the panels carry a 25-year warranty.
Does Indore Solar Energy Solution Pvt. Ltd. handle net-metering paperwork?
Reputable solar installers handle the net-metering and DISCOM application end-to-end — site survey, design, DISCOM application, installation, commissioning, and meter installation. Confirm with Indore Solar Energy Solution Pvt. Ltd. when you call (089823 04701) or fill the Get Quote form above.
What panels and inverters does Indore Solar Energy Solution Pvt. Ltd. typically install?
For PM-Surya Ghar eligibility, panels must be from approved manufacturers — typically Tier-1 brands such as Adani, Vikram, Waaree, Tata Power Solar, Premier Energies, or Loom Solar. Inverters are usually Growatt, Solis, Microtek, Polycab, or Luminous. Ask for the specific model and the 25-year linear-power warranty document.
How long does installation take?
Typical timeline: 3 days for site survey + design, 10–20 days for DISCOM approval, 1–2 days for installation, 7–15 days for net-meter installation and commissioning. End-to-end is 4–8 weeks for most residential installations in Indore.
Location
64, Bicholi Hapsi Main Rd, Sri Mangal Nagar, Indore, Madhya Pradesh 452016, India
View on Google Maps →Opening hours
| Sunday | 00:00 – 00:00 |
|---|---|
| Monday | 10:00 – 18:00 |
| Tuesday | 10:00 – 18:00 |
| Wednesday | 10:00 – 18:00 |
| Thursday | 10:00 – 18:00 |
| Friday | 10:00 – 18:00 |
| Saturday | 10:00 – 18:00 |
