Inverter battery & Solar

Rooftop solar installer in Rohtak, Haryana. ★ 5.0 (3 Google reviews) Updated August 2026.

About

When assessing solar energy options in the Rohtak area, understanding the local electricity tariff structure is key to determining return on investment. Homeowners and small commercial users who rely heavily on grid power for daily operations are typically the best fit for solar installations here. The payback period is directly influenced by the current rate of electricity consumption versus the cost of self-generation. Analyzing the average monthly bill against the system's expected output provides a clear projection of when energy savings will offset the initial investment. This calculation helps establish a realistic timeline for achieving a positive return on the installed system.

Get a quote from Inverter battery & Solar

Inverter battery & Solar hasn't yet confirmed lead notifications on GreenTax.in. Submit and we'll forward your enquiry to a verified active solar installer in Rohtak.

Rooftop solar in Rohtak, Haryana

A standard residential rooftop solar system in Rohtak sizes between 1 kW and 5 kW depending on monthly consumption. Most Rohtak homeowners pick a 3 kW system — it covers 300–400 units a month and captures the full ₹78,000 PM-Surya Ghar central subsidy.

Installed cost for a 3 kW system runs ₹1.8 lakh to ₹2.4 lakh; after the central subsidy your net outlay is ₹1.0 lakh to ₹1.6 lakh. Payback typically lands between 3.5 and 5 years — and the panels carry a 25-year warranty. Inverter battery & Solar can quote your specific roof; use the Get Quote form above or call 082959 99919.

The installer handles the PM-Surya Ghar registration, DISCOM net-metering application, system installation, and commissioning. Confirm AMC terms, panel warranty (look for Tier-1 manufacturer + 25-year linear-power guarantee), and inverter warranty (10 years minimum) before signing.

What to check before booking

  • Site visit and shading analysis — this determines the realistic kW your roof can support
  • PM-Surya Ghar registration done on your behalf, with the ₹78,000 subsidy credited directly to your bank
  • DISCOM net-metering application and commissioning — installer should handle this end-to-end
  • Tier-1 panels with 25-year linear-power warranty (degradation ≤0.55% per year)
  • Inverter warranty (10 years minimum) and on-site replacement policy
  • AMC contract for at least 5 years (panel cleaning, performance check, inverter health)

Frequently asked questions

How much PM-Surya Ghar subsidy can I get in Rohtak?

PM-Surya Ghar: Muft Bijli Yojana offers up to ₹78,000 for a residential rooftop solar system (₹30,000 per kW for the first 2 kW, ₹18,000 for the 3rd kW). Most households choose a 3 kW system to capture the full subsidy. Haryana residents apply through the national pmsuryaghar.gov.in portal — your DISCOM and the installer handle the rest.

What's the typical cost of a 3 kW system in Rohtak?

A 3 kW grid-connected residential rooftop system costs ₹1.8 lakh to ₹2.4 lakh installed (₹60,000 – ₹80,000 per kW). After the ₹78,000 PM-Surya Ghar subsidy, your net cost is ₹1.0 lakh to ₹1.6 lakh. Payback for a typical household in Haryana is 3.5 – 5 years; the panels carry a 25-year warranty.

Does Inverter battery & Solar handle net-metering paperwork?

Reputable solar installers handle the net-metering and DISCOM application end-to-end — site survey, design, DISCOM application, installation, commissioning, and meter installation. Confirm with Inverter battery & Solar when you call (082959 99919) or fill the Get Quote form above.

What panels and inverters does Inverter battery & Solar typically install?

For PM-Surya Ghar eligibility, panels must be from approved manufacturers — typically Tier-1 brands such as Adani, Vikram, Waaree, Tata Power Solar, Premier Energies, or Loom Solar. Inverters are usually Growatt, Solis, Microtek, Polycab, or Luminous. Ask for the specific model and the 25-year linear-power warranty document.

How long does installation take?

Typical timeline: 3 days for site survey + design, 10–20 days for DISCOM approval, 1–2 days for installation, 7–15 days for net-meter installation and commissioning. End-to-end is 4–8 weeks for most residential installations in Rohtak.

Location

503 Barsi Nagar, Sunderpur Road, Sector-7, Rohtak, Haryana 124001, India

View on Google Maps →

Opening hours

SundayClosed
Monday09:00 – 19:00
Tuesday09:00 – 19:00
Wednesday09:00 – 19:00
Thursday09:00 – 18:00
Friday09:00 – 18:00
Saturday09:00 – 18:00
Chat with us