About
Rooftop solar installations provide an alternative source of electricity generation for residential and commercial properties. Customers in the Gorakhpur area often evaluate solar adoption based on local electricity tariffs and consumption patterns. The return on investment for a solar system is directly influenced by the rate at which grid electricity costs are expected to change. For property owners seeking to mitigate rising utility expenses, assessing the payback period requires factoring in the current local tariff structure. A detailed analysis comparing projected solar energy generation against the existing electricity bill provides a clearer picture of the financial timeline. This approach helps determine the point at which self-generated power offsets the initial system cost. The suitability of solar power is particularly relevant for consumers with consistent, high daytime energy usage. Evaluating the system size relative to the average monthly consumption helps establish a realistic timeline for achieving energy independence and maximizing the financial benefit of the installed system.
Get a quote from Janaki Enterprises Solar Gorakhpur
Janaki Enterprises Solar Gorakhpur hasn't yet confirmed lead notifications on GreenTax.in. Submit and we'll forward your enquiry to a verified active solar installer in Gorakhpur.
Rooftop solar in Gorakhpur, Uttar Pradesh
A standard residential rooftop solar system in Gorakhpur sizes between 1 kW and 5 kW depending on monthly consumption. Most Gorakhpur homeowners pick a 3 kW system — it covers 300–400 units a month and captures the full ₹78,000 PM-Surya Ghar central subsidy.
Installed cost for a 3 kW system runs ₹1.8 lakh to ₹2.4 lakh; after the central subsidy your net outlay is ₹1.0 lakh to ₹1.6 lakh. Payback typically lands between 3.5 and 5 years — and the panels carry a 25-year warranty. Janaki Enterprises Solar Gorakhpur can quote your specific roof; use the Get Quote form above or call 098894 14000.
The installer handles the PM-Surya Ghar registration, DISCOM net-metering application, system installation, and commissioning. Confirm AMC terms, panel warranty (look for Tier-1 manufacturer + 25-year linear-power guarantee), and inverter warranty (10 years minimum) before signing.
What to check before booking
- Site visit and shading analysis — this determines the realistic kW your roof can support
- PM-Surya Ghar registration done on your behalf, with the ₹78,000 subsidy credited directly to your bank
- DISCOM net-metering application and commissioning — installer should handle this end-to-end
- Tier-1 panels with 25-year linear-power warranty (degradation ≤0.55% per year)
- Inverter warranty (10 years minimum) and on-site replacement policy
- AMC contract for at least 5 years (panel cleaning, performance check, inverter health)
Frequently asked questions
How much PM-Surya Ghar subsidy can I get in Gorakhpur?
PM-Surya Ghar: Muft Bijli Yojana offers up to ₹78,000 for a residential rooftop solar system (₹30,000 per kW for the first 2 kW, ₹18,000 for the 3rd kW). Most households choose a 3 kW system to capture the full subsidy. Uttar Pradesh residents apply through the national pmsuryaghar.gov.in portal — your DISCOM and the installer handle the rest.
What's the typical cost of a 3 kW system in Gorakhpur?
A 3 kW grid-connected residential rooftop system costs ₹1.8 lakh to ₹2.4 lakh installed (₹60,000 – ₹80,000 per kW). After the ₹78,000 PM-Surya Ghar subsidy, your net cost is ₹1.0 lakh to ₹1.6 lakh. Payback for a typical household in Uttar Pradesh is 3.5 – 5 years; the panels carry a 25-year warranty.
Does Janaki Enterprises Solar Gorakhpur handle net-metering paperwork?
Reputable solar installers handle the net-metering and DISCOM application end-to-end — site survey, design, DISCOM application, installation, commissioning, and meter installation. Confirm with Janaki Enterprises Solar Gorakhpur when you call (098894 14000) or fill the Get Quote form above.
What panels and inverters does Janaki Enterprises Solar Gorakhpur typically install?
For PM-Surya Ghar eligibility, panels must be from approved manufacturers — typically Tier-1 brands such as Adani, Vikram, Waaree, Tata Power Solar, Premier Energies, or Loom Solar. Inverters are usually Growatt, Solis, Microtek, Polycab, or Luminous. Ask for the specific model and the 25-year linear-power warranty document.
How long does installation take?
Typical timeline: 3 days for site survey + design, 10–20 days for DISCOM approval, 1–2 days for installation, 7–15 days for net-meter installation and commissioning. End-to-end is 4–8 weeks for most residential installations in Gorakhpur.
Location
Bhagat Chauraha, Rampur, Taramandal Rd, behind Hotel Prince Previous Address, Budh Vihar Colony, Gorakhpur, Uttar Pradesh 273016, India
View on Google Maps →Opening hours
| Sunday | Closed |
|---|---|
| Monday | 10:00 – 20:00 |
| Tuesday | 10:00 – 20:00 |
| Wednesday | 10:00 – 20:00 |
| Thursday | 10:00 – 20:00 |
| Friday | 10:00 – 20:00 |
| Saturday | 10:00 – 20:00 |
