About
The tropical climate and high rainfall patterns characteristic of Kochi, Kerala, make residential energy independence a consideration for many homeowners seeking stable power solutions. Individuals and families residing in areas with consistent sunlight exposure and a need to mitigate reliance on the grid often find rooftop solar installations appropriate for their property type. When pursuing government incentives, understanding the paperwork for the PM-Surya Ghar subsidy is a key step. The application process generally requires coordination between the homeowner and the designated installer. It is advisable to confirm the current eligibility criteria and the official application window, as these guidelines are subject to change. Typically, applicants must prepare foundational documents such as proof of residence,
Get a quote from Kraftwork Solar Pvt Ltd
Kraftwork Solar Pvt Ltd hasn't yet confirmed lead notifications on GreenTax.in. Submit and we'll forward your enquiry to a verified active solar installer in Kochi.
Rooftop solar in Kochi, Kerala
A standard residential rooftop solar system in Kochi sizes between 1 kW and 5 kW depending on monthly consumption. Most Kochi homeowners pick a 3 kW system — it covers 300–400 units a month and captures the full ₹78,000 PM-Surya Ghar central subsidy.
Installed cost for a 3 kW system runs ₹1.8 lakh to ₹2.4 lakh; after the central subsidy your net outlay is ₹1.0 lakh to ₹1.6 lakh. Payback typically lands between 3.5 and 5 years — and the panels carry a 25-year warranty. Kraftwork Solar Pvt Ltd can quote your specific roof; use the Get Quote form above or call directly.
The installer handles the PM-Surya Ghar registration, DISCOM net-metering application, system installation, and commissioning. Confirm AMC terms, panel warranty (look for Tier-1 manufacturer + 25-year linear-power guarantee), and inverter warranty (10 years minimum) before signing.
What to check before booking
- Site visit and shading analysis — this determines the realistic kW your roof can support
- PM-Surya Ghar registration done on your behalf, with the ₹78,000 subsidy credited directly to your bank
- DISCOM net-metering application and commissioning — installer should handle this end-to-end
- Tier-1 panels with 25-year linear-power warranty (degradation ≤0.55% per year)
- Inverter warranty (10 years minimum) and on-site replacement policy
- AMC contract for at least 5 years (panel cleaning, performance check, inverter health)
Frequently asked questions
How much PM-Surya Ghar subsidy can I get in Kochi?
PM-Surya Ghar: Muft Bijli Yojana offers up to ₹78,000 for a residential rooftop solar system (₹30,000 per kW for the first 2 kW, ₹18,000 for the 3rd kW). Most households choose a 3 kW system to capture the full subsidy. Kerala residents apply through the national pmsuryaghar.gov.in portal — your DISCOM and the installer handle the rest.
What's the typical cost of a 3 kW system in Kochi?
A 3 kW grid-connected residential rooftop system costs ₹1.8 lakh to ₹2.4 lakh installed (₹60,000 – ₹80,000 per kW). After the ₹78,000 PM-Surya Ghar subsidy, your net cost is ₹1.0 lakh to ₹1.6 lakh. Payback for a typical household in Kerala is 3.5 – 5 years; the panels carry a 25-year warranty.
Does Kraftwork Solar Pvt Ltd handle net-metering paperwork?
Reputable solar installers handle the net-metering and DISCOM application end-to-end — site survey, design, DISCOM application, installation, commissioning, and meter installation. Confirm with Kraftwork Solar Pvt Ltd when you call (see contact details) or fill the Get Quote form above.
What panels and inverters does Kraftwork Solar Pvt Ltd typically install?
For PM-Surya Ghar eligibility, panels must be from approved manufacturers — typically Tier-1 brands such as Adani, Vikram, Waaree, Tata Power Solar, Premier Energies, or Loom Solar. Inverters are usually Growatt, Solis, Microtek, Polycab, or Luminous. Ask for the specific model and the 25-year linear-power warranty document.
How long does installation take?
Typical timeline: 3 days for site survey + design, 10–20 days for DISCOM approval, 1–2 days for installation, 7–15 days for net-meter installation and commissioning. End-to-end is 4–8 weeks for most residential installations in Kochi.
Location
29/2862. Adithya, Near Gandhi Sq.Poonithura, Poonithura, Maradu, Kochi, Kerala 682038, India
View on Google Maps →Opening hours
| Sunday | Closed |
|---|---|
| Monday | 09:30 – 17:30 |
| Tuesday | 09:30 – 17:30 |
| Wednesday | 09:30 – 17:30 |
| Thursday | 09:30 – 17:30 |
| Friday | 09:30 – 17:30 |
| Saturday | 09:30 – 17:30 |
