Loom Solar Cuttack

Rooftop solar installer in Cuttack, Odisha. ★ 5.0 (3 Google reviews) Updated August 2026.

About

Rooftop solar installations provide an avenue for residential and commercial properties to integrate renewable energy sources. For property owners in the Cuttack area looking to connect solar generation to the local grid, understanding the net-metering process with the local Distribution Company (DISCOM) is a primary consideration. The process of obtaining net-metering approval involves specific documentation and coordination with the utility provider. Customers should anticipate that the speed of the DISCOM's application processing can vary based on current departmental workloads and local infrastructure demands. Having a local partner familiar with the specific procedural requirements of the regional utility can assist in navigating these initial administrative steps. Individuals or businesses considering solar power should confirm the current guidelines for grid connectivity directly with the relevant DISCOM office. This local presence supports the technical aspects of system design and helps manage the necessary coordination between the installed system and the existing electrical infrastructure.

Get a quote from Loom Solar Cuttack

Loom Solar Cuttack hasn't yet confirmed lead notifications on GreenTax.in. Submit and we'll forward your enquiry to a verified active solar installer in Cuttack.

Rooftop solar in Cuttack, Odisha

A standard residential rooftop solar system in Cuttack sizes between 1 kW and 5 kW depending on monthly consumption. Most Cuttack homeowners pick a 3 kW system — it covers 300–400 units a month and captures the full ₹78,000 PM-Surya Ghar central subsidy.

Installed cost for a 3 kW system runs ₹1.8 lakh to ₹2.4 lakh; after the central subsidy your net outlay is ₹1.0 lakh to ₹1.6 lakh. Payback typically lands between 3.5 and 5 years — and the panels carry a 25-year warranty. Loom Solar Cuttack can quote your specific roof; use the Get Quote form above or call directly.

The installer handles the PM-Surya Ghar registration, DISCOM net-metering application, system installation, and commissioning. Confirm AMC terms, panel warranty (look for Tier-1 manufacturer + 25-year linear-power guarantee), and inverter warranty (10 years minimum) before signing.

What to check before booking

  • Site visit and shading analysis — this determines the realistic kW your roof can support
  • PM-Surya Ghar registration done on your behalf, with the ₹78,000 subsidy credited directly to your bank
  • DISCOM net-metering application and commissioning — installer should handle this end-to-end
  • Tier-1 panels with 25-year linear-power warranty (degradation ≤0.55% per year)
  • Inverter warranty (10 years minimum) and on-site replacement policy
  • AMC contract for at least 5 years (panel cleaning, performance check, inverter health)

Frequently asked questions

How much PM-Surya Ghar subsidy can I get in Cuttack?

PM-Surya Ghar: Muft Bijli Yojana offers up to ₹78,000 for a residential rooftop solar system (₹30,000 per kW for the first 2 kW, ₹18,000 for the 3rd kW). Most households choose a 3 kW system to capture the full subsidy. Odisha residents apply through the national pmsuryaghar.gov.in portal — your DISCOM and the installer handle the rest.

What's the typical cost of a 3 kW system in Cuttack?

A 3 kW grid-connected residential rooftop system costs ₹1.8 lakh to ₹2.4 lakh installed (₹60,000 – ₹80,000 per kW). After the ₹78,000 PM-Surya Ghar subsidy, your net cost is ₹1.0 lakh to ₹1.6 lakh. Payback for a typical household in Odisha is 3.5 – 5 years; the panels carry a 25-year warranty.

Does Loom Solar Cuttack handle net-metering paperwork?

Reputable solar installers handle the net-metering and DISCOM application end-to-end — site survey, design, DISCOM application, installation, commissioning, and meter installation. Confirm with Loom Solar Cuttack when you call (see contact details) or fill the Get Quote form above.

What panels and inverters does Loom Solar Cuttack typically install?

For PM-Surya Ghar eligibility, panels must be from approved manufacturers — typically Tier-1 brands such as Adani, Vikram, Waaree, Tata Power Solar, Premier Energies, or Loom Solar. Inverters are usually Growatt, Solis, Microtek, Polycab, or Luminous. Ask for the specific model and the 25-year linear-power warranty document.

How long does installation take?

Typical timeline: 3 days for site survey + design, 10–20 days for DISCOM approval, 1–2 days for installation, 7–15 days for net-meter installation and commissioning. End-to-end is 4–8 weeks for most residential installations in Cuttack.

Location

Kalyaniswari Ln, Kalyani Nagar, Rajendra Nagar, Cuttack, Odisha 753013, India

View on Google Maps →
Chat with us