M3 Solar Pvt. Ltd. | MYNX Collaboration

Rooftop solar installer in Jamshedpur, Jharkhand. ★ 4.7 (11 Google reviews) Updated August 2026.

About

Visitors can expect an assessment of local solar requirements and system design consultation upon arrival. The facility serves residential and commercial clients in the Jamshedpur area who are looking to integrate rooftop solar power into their existing infrastructure. When evaluating photovoltaic panel options, attention should be paid to the manufacturer's standing within the industry. Selecting components from recognized Tier-1 manufacturers is a standard practice for ensuring system longevity and performance consistency. A key aspect of the selection process involves understanding the warranty structure. Buyers should verify the warranty terms provided for both the panels and the inverter, paying particular attention to the duration of performance guarantees, such as the stated 25-year warranty terms. It is practical for prospective customers to request documentation detailing the origin and certification of the proposed equipment. For those initiating a solar project in the region, a concrete step is to request a detailed

Get a quote from M3 Solar Pvt. Ltd. | MYNX Collaboration

M3 Solar Pvt. Ltd. | MYNX Collaboration hasn't yet confirmed lead notifications on GreenTax.in. Submit and we'll forward your enquiry to a verified active solar installer in Jamshedpur.

Rooftop solar in Jamshedpur, Jharkhand

A standard residential rooftop solar system in Jamshedpur sizes between 1 kW and 5 kW depending on monthly consumption. Most Jamshedpur homeowners pick a 3 kW system — it covers 300–400 units a month and captures the full ₹78,000 PM-Surya Ghar central subsidy.

Installed cost for a 3 kW system runs ₹1.8 lakh to ₹2.4 lakh; after the central subsidy your net outlay is ₹1.0 lakh to ₹1.6 lakh. Payback typically lands between 3.5 and 5 years — and the panels carry a 25-year warranty. M3 Solar Pvt. Ltd. | MYNX Collaboration can quote your specific roof; use the Get Quote form above or call 087096 34448.

The installer handles the PM-Surya Ghar registration, DISCOM net-metering application, system installation, and commissioning. Confirm AMC terms, panel warranty (look for Tier-1 manufacturer + 25-year linear-power guarantee), and inverter warranty (10 years minimum) before signing.

What to check before booking

  • Site visit and shading analysis — this determines the realistic kW your roof can support
  • PM-Surya Ghar registration done on your behalf, with the ₹78,000 subsidy credited directly to your bank
  • DISCOM net-metering application and commissioning — installer should handle this end-to-end
  • Tier-1 panels with 25-year linear-power warranty (degradation ≤0.55% per year)
  • Inverter warranty (10 years minimum) and on-site replacement policy
  • AMC contract for at least 5 years (panel cleaning, performance check, inverter health)

Frequently asked questions

How much PM-Surya Ghar subsidy can I get in Jamshedpur?

PM-Surya Ghar: Muft Bijli Yojana offers up to ₹78,000 for a residential rooftop solar system (₹30,000 per kW for the first 2 kW, ₹18,000 for the 3rd kW). Most households choose a 3 kW system to capture the full subsidy. Jharkhand residents apply through the national pmsuryaghar.gov.in portal — your DISCOM and the installer handle the rest.

What's the typical cost of a 3 kW system in Jamshedpur?

A 3 kW grid-connected residential rooftop system costs ₹1.8 lakh to ₹2.4 lakh installed (₹60,000 – ₹80,000 per kW). After the ₹78,000 PM-Surya Ghar subsidy, your net cost is ₹1.0 lakh to ₹1.6 lakh. Payback for a typical household in Jharkhand is 3.5 – 5 years; the panels carry a 25-year warranty.

Does M3 Solar Pvt. Ltd. | MYNX Collaboration handle net-metering paperwork?

Reputable solar installers handle the net-metering and DISCOM application end-to-end — site survey, design, DISCOM application, installation, commissioning, and meter installation. Confirm with M3 Solar Pvt. Ltd. | MYNX Collaboration when you call (087096 34448) or fill the Get Quote form above.

What panels and inverters does M3 Solar Pvt. Ltd. | MYNX Collaboration typically install?

For PM-Surya Ghar eligibility, panels must be from approved manufacturers — typically Tier-1 brands such as Adani, Vikram, Waaree, Tata Power Solar, Premier Energies, or Loom Solar. Inverters are usually Growatt, Solis, Microtek, Polycab, or Luminous. Ask for the specific model and the 25-year linear-power warranty document.

How long does installation take?

Typical timeline: 3 days for site survey + design, 10–20 days for DISCOM approval, 1–2 days for installation, 7–15 days for net-meter installation and commissioning. End-to-end is 4–8 weeks for most residential installations in Jamshedpur.

Location

SHAIL BHAWAN, STRAIGHT MILE ROAD, VIDYAPATI NAGAR, AIWC SCHOOL, OPPSITE, Baridih, Jamshedpur, Jharkhand 831017, India

View on Google Maps →

Opening hours

SundayClosed
Monday10:00 – 18:30
Tuesday10:00 – 18:30
Wednesday10:00 – 18:30
Thursday10:00 – 18:30
Friday10:00 – 18:30
Saturday10:00 – 18:30
Chat with us