MEHAR SOLAR TECHNOLOGY PVT LTD

Rooftop solar installer in Noida, Uttar Pradesh. ★ 4.3 (23 Google reviews) Updated August 2026.

About

Rooftop solar installations provide an alternative method for generating residential and commercial electricity. Customers in the Noida area often find that integrating solar power can significantly alter long-term energy expenditure calculations. The return on investment is heavily influenced by the local electricity tariff structure, which dictates the savings realized from self-consumption. Individuals or businesses with consistent daytime energy needs, such as small commercial units or larger residential complexes, are typically the most suitable candidates for this system. When factoring in the prevailing electricity rates in Uttar Pradesh, the payback period is calculated based on the offset achieved against the existing grid consumption. A practical consideration for potential adopters is analyzing the current tariff slab rates against projected solar generation capacity. This analysis helps determine the point at which the cumulative savings from reduced utility bills offset the initial system investment.

Get a quote from MEHAR SOLAR TECHNOLOGY PVT LTD

MEHAR SOLAR TECHNOLOGY PVT LTD hasn't yet confirmed lead notifications on GreenTax.in. Submit and we'll forward your enquiry to a verified active solar installer in Noida.

Rooftop solar in Noida, Uttar Pradesh

A standard residential rooftop solar system in Noida sizes between 1 kW and 5 kW depending on monthly consumption. Most Noida homeowners pick a 3 kW system — it covers 300–400 units a month and captures the full ₹78,000 PM-Surya Ghar central subsidy.

Installed cost for a 3 kW system runs ₹1.8 lakh to ₹2.4 lakh; after the central subsidy your net outlay is ₹1.0 lakh to ₹1.6 lakh. Payback typically lands between 3.5 and 5 years — and the panels carry a 25-year warranty. MEHAR SOLAR TECHNOLOGY PVT LTD can quote your specific roof; use the Get Quote form above or call 098711 02017.

The installer handles the PM-Surya Ghar registration, DISCOM net-metering application, system installation, and commissioning. Confirm AMC terms, panel warranty (look for Tier-1 manufacturer + 25-year linear-power guarantee), and inverter warranty (10 years minimum) before signing.

What to check before booking

  • Site visit and shading analysis — this determines the realistic kW your roof can support
  • PM-Surya Ghar registration done on your behalf, with the ₹78,000 subsidy credited directly to your bank
  • DISCOM net-metering application and commissioning — installer should handle this end-to-end
  • Tier-1 panels with 25-year linear-power warranty (degradation ≤0.55% per year)
  • Inverter warranty (10 years minimum) and on-site replacement policy
  • AMC contract for at least 5 years (panel cleaning, performance check, inverter health)

Frequently asked questions

How much PM-Surya Ghar subsidy can I get in Noida?

PM-Surya Ghar: Muft Bijli Yojana offers up to ₹78,000 for a residential rooftop solar system (₹30,000 per kW for the first 2 kW, ₹18,000 for the 3rd kW). Most households choose a 3 kW system to capture the full subsidy. Uttar Pradesh residents apply through the national pmsuryaghar.gov.in portal — your DISCOM and the installer handle the rest.

What's the typical cost of a 3 kW system in Noida?

A 3 kW grid-connected residential rooftop system costs ₹1.8 lakh to ₹2.4 lakh installed (₹60,000 – ₹80,000 per kW). After the ₹78,000 PM-Surya Ghar subsidy, your net cost is ₹1.0 lakh to ₹1.6 lakh. Payback for a typical household in Uttar Pradesh is 3.5 – 5 years; the panels carry a 25-year warranty.

Does MEHAR SOLAR TECHNOLOGY PVT LTD handle net-metering paperwork?

Reputable solar installers handle the net-metering and DISCOM application end-to-end — site survey, design, DISCOM application, installation, commissioning, and meter installation. Confirm with MEHAR SOLAR TECHNOLOGY PVT LTD when you call (098711 02017) or fill the Get Quote form above.

What panels and inverters does MEHAR SOLAR TECHNOLOGY PVT LTD typically install?

For PM-Surya Ghar eligibility, panels must be from approved manufacturers — typically Tier-1 brands such as Adani, Vikram, Waaree, Tata Power Solar, Premier Energies, or Loom Solar. Inverters are usually Growatt, Solis, Microtek, Polycab, or Luminous. Ask for the specific model and the 25-year linear-power warranty document.

How long does installation take?

Typical timeline: 3 days for site survey + design, 10–20 days for DISCOM approval, 1–2 days for installation, 7–15 days for net-meter installation and commissioning. End-to-end is 4–8 weeks for most residential installations in Noida.

Location

2, C Block, Sector 58, Noida, Uttar Pradesh 201309, India

View on Google Maps →

Opening hours

SundayClosed
Monday09:00 – 18:00
Tuesday09:00 – 18:00
Wednesday09:00 – 18:00
Thursday09:00 – 18:00
Friday09:00 – 18:00
Saturday09:00 – 18:00
Chat with us