About
The solar energy market in Nashik, Maharashtra, shows increasing adoption for residential rooftop installations. Customers seeking to integrate solar power into their homes often benefit from the central government's PM-Surya Ghar subsidy scheme. To initiate the subsidy process, applicants must typically submit specific documentation, which generally includes proof of residency and ownership details for the property. Understanding the application timeline is important, as the subsidy disbursement is linked to the successful commissioning of the system. Prospective buyers should confirm the current eligibility criteria and required paperwork with the local nodal agency to ensure a smooth submission. Having all necessary documents prepared beforehand helps streamline the initial application phase.
Get a quote from Nitsun Solar Energy Pvt. Ltd
Submit your name + phone to reveal Nitsun Solar Energy Pvt. Ltd's contact and notify them. No spam, no obligation.
Rooftop solar in Nashik, Maharashtra
A standard residential rooftop solar system in Nashik sizes between 1 kW and 5 kW depending on monthly consumption. Most Nashik homeowners pick a 3 kW system — it covers 300–400 units a month and captures the full ₹78,000 PM-Surya Ghar central subsidy.
Installed cost for a 3 kW system runs ₹1.8 lakh to ₹2.4 lakh; after the central subsidy your net outlay is ₹1.0 lakh to ₹1.6 lakh. Payback typically lands between 3.5 and 5 years — and the panels carry a 25-year warranty. Nitsun Solar Energy Pvt. Ltd can quote your specific roof; use the Get Quote form above or call 097676 66490.
The installer handles the PM-Surya Ghar registration, DISCOM net-metering application, system installation, and commissioning. Confirm AMC terms, panel warranty (look for Tier-1 manufacturer + 25-year linear-power guarantee), and inverter warranty (10 years minimum) before signing.
What to check before booking
- Site visit and shading analysis — this determines the realistic kW your roof can support
- PM-Surya Ghar registration done on your behalf, with the ₹78,000 subsidy credited directly to your bank
- DISCOM net-metering application and commissioning — installer should handle this end-to-end
- Tier-1 panels with 25-year linear-power warranty (degradation ≤0.55% per year)
- Inverter warranty (10 years minimum) and on-site replacement policy
- AMC contract for at least 5 years (panel cleaning, performance check, inverter health)
Frequently asked questions
How much PM-Surya Ghar subsidy can I get in Nashik?
PM-Surya Ghar: Muft Bijli Yojana offers up to ₹78,000 for a residential rooftop solar system (₹30,000 per kW for the first 2 kW, ₹18,000 for the 3rd kW). Most households choose a 3 kW system to capture the full subsidy. Maharashtra residents apply through the national pmsuryaghar.gov.in portal — your DISCOM and the installer handle the rest.
What's the typical cost of a 3 kW system in Nashik?
A 3 kW grid-connected residential rooftop system costs ₹1.8 lakh to ₹2.4 lakh installed (₹60,000 – ₹80,000 per kW). After the ₹78,000 PM-Surya Ghar subsidy, your net cost is ₹1.0 lakh to ₹1.6 lakh. Payback for a typical household in Maharashtra is 3.5 – 5 years; the panels carry a 25-year warranty.
Does Nitsun Solar Energy Pvt. Ltd handle net-metering paperwork?
Reputable solar installers handle the net-metering and DISCOM application end-to-end — site survey, design, DISCOM application, installation, commissioning, and meter installation. Confirm with Nitsun Solar Energy Pvt. Ltd when you call (097676 66490) or fill the Get Quote form above.
What panels and inverters does Nitsun Solar Energy Pvt. Ltd typically install?
For PM-Surya Ghar eligibility, panels must be from approved manufacturers — typically Tier-1 brands such as Adani, Vikram, Waaree, Tata Power Solar, Premier Energies, or Loom Solar. Inverters are usually Growatt, Solis, Microtek, Polycab, or Luminous. Ask for the specific model and the 25-year linear-power warranty document.
How long does installation take?
Typical timeline: 3 days for site survey + design, 10–20 days for DISCOM approval, 1–2 days for installation, 7–15 days for net-meter installation and commissioning. End-to-end is 4–8 weeks for most residential installations in Nashik.
Location
12,Suman-Raman Bunglow, College Rd, opposite shiv mandir, Yashwant Colony, Nashik, Maharashtra 422005, India
View on Google Maps →Opening hours
| Sunday | Closed |
|---|---|
| Monday | 10:30 – 19:00 |
| Tuesday | 10:30 – 19:00 |
| Wednesday | 10:30 – 19:00 |
| Thursday | 10:30 – 19:00 |
| Friday | 10:30 – 19:00 |
| Saturday | 10:30 – 19:00 |
