Planet Earth Solution-PM Surya Ghar Solar Panel Service Provider

Rooftop solar installer in Rourkela, Odisha. ★ 4.9 (16 Google reviews) Updated August 2026.

About

Rooftop solar installations provide decentralized power generation for residential and commercial properties. Customers seeking solar solutions in the Rourkela area can utilize this service provider for system integration. The company handles the selection of appropriate inverters, ensuring the equipment matches the specific energy needs and roof structure of the site. Regarding system longevity, the service includes provisions for product warranties and outlines the procedure for on-site replacement should a component fail under warranty terms. This approach helps clients understand the maintenance and support structure accompanying the initial installation.

Get a quote from Planet Earth Solution-PM Surya Ghar Solar Panel Service Provider

Planet Earth Solution-PM Surya Ghar Solar Panel Service Provider hasn't yet confirmed lead notifications on GreenTax.in. Submit and we'll forward your enquiry to a verified active solar installer in Rourkela.

Rooftop solar in Rourkela, Odisha

A standard residential rooftop solar system in Rourkela sizes between 1 kW and 5 kW depending on monthly consumption. Most Rourkela homeowners pick a 3 kW system — it covers 300–400 units a month and captures the full ₹78,000 PM-Surya Ghar central subsidy.

Installed cost for a 3 kW system runs ₹1.8 lakh to ₹2.4 lakh; after the central subsidy your net outlay is ₹1.0 lakh to ₹1.6 lakh. Payback typically lands between 3.5 and 5 years — and the panels carry a 25-year warranty. Planet Earth Solution-PM Surya Ghar Solar Panel Service Provider can quote your specific roof; use the Get Quote form above or call 082606 09060.

The installer handles the PM-Surya Ghar registration, DISCOM net-metering application, system installation, and commissioning. Confirm AMC terms, panel warranty (look for Tier-1 manufacturer + 25-year linear-power guarantee), and inverter warranty (10 years minimum) before signing.

What to check before booking

  • Site visit and shading analysis — this determines the realistic kW your roof can support
  • PM-Surya Ghar registration done on your behalf, with the ₹78,000 subsidy credited directly to your bank
  • DISCOM net-metering application and commissioning — installer should handle this end-to-end
  • Tier-1 panels with 25-year linear-power warranty (degradation ≤0.55% per year)
  • Inverter warranty (10 years minimum) and on-site replacement policy
  • AMC contract for at least 5 years (panel cleaning, performance check, inverter health)

Frequently asked questions

How much PM-Surya Ghar subsidy can I get in Rourkela?

PM-Surya Ghar: Muft Bijli Yojana offers up to ₹78,000 for a residential rooftop solar system (₹30,000 per kW for the first 2 kW, ₹18,000 for the 3rd kW). Most households choose a 3 kW system to capture the full subsidy. Odisha residents apply through the national pmsuryaghar.gov.in portal — your DISCOM and the installer handle the rest.

What's the typical cost of a 3 kW system in Rourkela?

A 3 kW grid-connected residential rooftop system costs ₹1.8 lakh to ₹2.4 lakh installed (₹60,000 – ₹80,000 per kW). After the ₹78,000 PM-Surya Ghar subsidy, your net cost is ₹1.0 lakh to ₹1.6 lakh. Payback for a typical household in Odisha is 3.5 – 5 years; the panels carry a 25-year warranty.

Does Planet Earth Solution-PM Surya Ghar Solar Panel Service Provider handle net-metering paperwork?

Reputable solar installers handle the net-metering and DISCOM application end-to-end — site survey, design, DISCOM application, installation, commissioning, and meter installation. Confirm with Planet Earth Solution-PM Surya Ghar Solar Panel Service Provider when you call (082606 09060) or fill the Get Quote form above.

What panels and inverters does Planet Earth Solution-PM Surya Ghar Solar Panel Service Provider typically install?

For PM-Surya Ghar eligibility, panels must be from approved manufacturers — typically Tier-1 brands such as Adani, Vikram, Waaree, Tata Power Solar, Premier Energies, or Loom Solar. Inverters are usually Growatt, Solis, Microtek, Polycab, or Luminous. Ask for the specific model and the 25-year linear-power warranty document.

How long does installation take?

Typical timeline: 3 days for site survey + design, 10–20 days for DISCOM approval, 1–2 days for installation, 7–15 days for net-meter installation and commissioning. End-to-end is 4–8 weeks for most residential installations in Rourkela.

Location

Qrs. No.- A/01, Sector 5, Rourkela, Raurkela Industrialship, Odisha 769002, India

View on Google Maps →

Opening hours

SundayClosed
Monday10:00 – 18:00
Tuesday10:00 – 18:00
Wednesday10:00 – 18:00
Thursday10:00 – 18:00
Friday10:00 – 18:00
Saturday10:00 – 18:00
Chat with us