About
Visitors to the facility can expect an overview of solar photovoltaic systems suitable for residential and commercial rooftop installations in the Moradabad area. The service provider is equipped to assess site-specific energy requirements for properties within Uttar Pradesh. For owners considering long-term ownership, the company offers Annual Maintenance Contracts (AMC) designed to cover routine system upkeep. Regarding panel maintenance, the recommended cleaning frequency is typically bi-annually, though this schedule can adjust based on local dust accumulation patterns. Beyond the initial setup, the firm provides post-installation support that addresses operational queries and performance monitoring. Prospective customers should confirm the scope of the warranty coverage included within the AMC agreement to ensure all components, including inverters and mounting hardware, are accounted for.
Get a quote from PS Solar System
PS Solar System hasn't yet confirmed lead notifications on GreenTax.in. Submit and we'll forward your enquiry to a verified active solar installer in Moradabad.
Rooftop solar in Moradabad, Uttar Pradesh
A standard residential rooftop solar system in Moradabad sizes between 1 kW and 5 kW depending on monthly consumption. Most Moradabad homeowners pick a 3 kW system — it covers 300–400 units a month and captures the full ₹78,000 PM-Surya Ghar central subsidy.
Installed cost for a 3 kW system runs ₹1.8 lakh to ₹2.4 lakh; after the central subsidy your net outlay is ₹1.0 lakh to ₹1.6 lakh. Payback typically lands between 3.5 and 5 years — and the panels carry a 25-year warranty. PS Solar System can quote your specific roof; use the Get Quote form above or call 099271 81905.
The installer handles the PM-Surya Ghar registration, DISCOM net-metering application, system installation, and commissioning. Confirm AMC terms, panel warranty (look for Tier-1 manufacturer + 25-year linear-power guarantee), and inverter warranty (10 years minimum) before signing.
What to check before booking
- Site visit and shading analysis — this determines the realistic kW your roof can support
- PM-Surya Ghar registration done on your behalf, with the ₹78,000 subsidy credited directly to your bank
- DISCOM net-metering application and commissioning — installer should handle this end-to-end
- Tier-1 panels with 25-year linear-power warranty (degradation ≤0.55% per year)
- Inverter warranty (10 years minimum) and on-site replacement policy
- AMC contract for at least 5 years (panel cleaning, performance check, inverter health)
Frequently asked questions
How much PM-Surya Ghar subsidy can I get in Moradabad?
PM-Surya Ghar: Muft Bijli Yojana offers up to ₹78,000 for a residential rooftop solar system (₹30,000 per kW for the first 2 kW, ₹18,000 for the 3rd kW). Most households choose a 3 kW system to capture the full subsidy. Uttar Pradesh residents apply through the national pmsuryaghar.gov.in portal — your DISCOM and the installer handle the rest.
What's the typical cost of a 3 kW system in Moradabad?
A 3 kW grid-connected residential rooftop system costs ₹1.8 lakh to ₹2.4 lakh installed (₹60,000 – ₹80,000 per kW). After the ₹78,000 PM-Surya Ghar subsidy, your net cost is ₹1.0 lakh to ₹1.6 lakh. Payback for a typical household in Uttar Pradesh is 3.5 – 5 years; the panels carry a 25-year warranty.
Does PS Solar System handle net-metering paperwork?
Reputable solar installers handle the net-metering and DISCOM application end-to-end — site survey, design, DISCOM application, installation, commissioning, and meter installation. Confirm with PS Solar System when you call (099271 81905) or fill the Get Quote form above.
What panels and inverters does PS Solar System typically install?
For PM-Surya Ghar eligibility, panels must be from approved manufacturers — typically Tier-1 brands such as Adani, Vikram, Waaree, Tata Power Solar, Premier Energies, or Loom Solar. Inverters are usually Growatt, Solis, Microtek, Polycab, or Luminous. Ask for the specific model and the 25-year linear-power warranty document.
How long does installation take?
Typical timeline: 3 days for site survey + design, 10–20 days for DISCOM approval, 1–2 days for installation, 7–15 days for net-meter installation and commissioning. End-to-end is 4–8 weeks for most residential installations in Moradabad.
Location
4B, Delhi Rd, Avas Vikas, Vikas Colony, Buddhi Vihar, Moradabad, Uttar Pradesh 244103, India
View on Google Maps →Opening hours
| Sunday | 09:00 – 17:00 |
|---|---|
| Monday | 10:00 – 19:00 |
| Tuesday | 10:00 – 19:00 |
| Wednesday | 10:00 – 19:00 |
| Thursday | 10:00 – 19:00 |
| Friday | 10:00 – 19:00 |
| Saturday | 10:00 – 19:00 |
