Raylon Energy LLP | Solar BOS Supplier & Rooftop Solar Installation in Rajasthan

Rooftop solar installer in Udaipur, Rajasthan. ★ 5.0 (19 Google reviews) Updated August 2026.

About

The solar energy sector in Udaipur is seeing increased adoption for residential rooftop installations. Customers interested in utilizing government subsidies for their solar setup should be aware of the PM-Surya Ghar scheme guidelines. The process generally requires submitting an application through the designated portal, and timing is crucial as subsidy eligibility can change. To proceed with the subsidy paperwork, prospective buyers typically need to gather specific documentation beforehand. Essential items often include proof of residency, ownership documents for the property, and valid identity proofs for all occupants. Consulting with the local installer early in the planning phase helps ensure all necessary paperwork is compiled correctly before the official application window opens.

Get a quote from Raylon Energy LLP | Solar BOS Supplier & Rooftop Solar Installation in Rajasthan

Raylon Energy LLP | Solar BOS Supplier & Rooftop Solar Installation in Rajasthan hasn't yet confirmed lead notifications on GreenTax.in. Submit and we'll forward your enquiry to a verified active solar installer in Udaipur.

Rooftop solar in Udaipur, Rajasthan

A standard residential rooftop solar system in Udaipur sizes between 1 kW and 5 kW depending on monthly consumption. Most Udaipur homeowners pick a 3 kW system — it covers 300–400 units a month and captures the full ₹78,000 PM-Surya Ghar central subsidy.

Installed cost for a 3 kW system runs ₹1.8 lakh to ₹2.4 lakh; after the central subsidy your net outlay is ₹1.0 lakh to ₹1.6 lakh. Payback typically lands between 3.5 and 5 years — and the panels carry a 25-year warranty. Raylon Energy LLP | Solar BOS Supplier & Rooftop Solar Installation in Rajasthan can quote your specific roof; use the Get Quote form above or call 090120 72020.

The installer handles the PM-Surya Ghar registration, DISCOM net-metering application, system installation, and commissioning. Confirm AMC terms, panel warranty (look for Tier-1 manufacturer + 25-year linear-power guarantee), and inverter warranty (10 years minimum) before signing.

What to check before booking

  • Site visit and shading analysis — this determines the realistic kW your roof can support
  • PM-Surya Ghar registration done on your behalf, with the ₹78,000 subsidy credited directly to your bank
  • DISCOM net-metering application and commissioning — installer should handle this end-to-end
  • Tier-1 panels with 25-year linear-power warranty (degradation ≤0.55% per year)
  • Inverter warranty (10 years minimum) and on-site replacement policy
  • AMC contract for at least 5 years (panel cleaning, performance check, inverter health)

Frequently asked questions

How much PM-Surya Ghar subsidy can I get in Udaipur?

PM-Surya Ghar: Muft Bijli Yojana offers up to ₹78,000 for a residential rooftop solar system (₹30,000 per kW for the first 2 kW, ₹18,000 for the 3rd kW). Most households choose a 3 kW system to capture the full subsidy. Rajasthan residents apply through the national pmsuryaghar.gov.in portal — your DISCOM and the installer handle the rest.

What's the typical cost of a 3 kW system in Udaipur?

A 3 kW grid-connected residential rooftop system costs ₹1.8 lakh to ₹2.4 lakh installed (₹60,000 – ₹80,000 per kW). After the ₹78,000 PM-Surya Ghar subsidy, your net cost is ₹1.0 lakh to ₹1.6 lakh. Payback for a typical household in Rajasthan is 3.5 – 5 years; the panels carry a 25-year warranty.

Does Raylon Energy LLP | Solar BOS Supplier & Rooftop Solar Installation in Rajasthan handle net-metering paperwork?

Reputable solar installers handle the net-metering and DISCOM application end-to-end — site survey, design, DISCOM application, installation, commissioning, and meter installation. Confirm with Raylon Energy LLP | Solar BOS Supplier & Rooftop Solar Installation in Rajasthan when you call (090120 72020) or fill the Get Quote form above.

What panels and inverters does Raylon Energy LLP | Solar BOS Supplier & Rooftop Solar Installation in Rajasthan typically install?

For PM-Surya Ghar eligibility, panels must be from approved manufacturers — typically Tier-1 brands such as Adani, Vikram, Waaree, Tata Power Solar, Premier Energies, or Loom Solar. Inverters are usually Growatt, Solis, Microtek, Polycab, or Luminous. Ask for the specific model and the 25-year linear-power warranty document.

How long does installation take?

Typical timeline: 3 days for site survey + design, 10–20 days for DISCOM approval, 1–2 days for installation, 7–15 days for net-meter installation and commissioning. End-to-end is 4–8 weeks for most residential installations in Udaipur.

Location

F-64-65, near Urban square mall, Udhyog Vihar, Sukher, Udaipur, Rajasthan 313001, India

View on Google Maps →

Opening hours

Sunday10:00 – 13:00
Monday09:00 – 06:30
Tuesday09:00 – 06:30
Wednesday09:00 – 06:30
Thursday09:00 – 06:30
Friday09:00 – 06:30
Saturday09:00 – 06:30
Chat with us