SES SOLAR NETWORK

Rooftop solar installer in Amravati, Maharashtra. ★ 5.0 (12 Google reviews) Updated August 2026.

About

Individuals seeking rooftop solar installations in the Amravati area often utilize this service provider. The company handles the necessary technical aspects of integrating solar power into existing residential or commercial structures. When pursuing grid-tied systems, understanding the local utility's interconnection process is a key consideration for potential customers. The process for applying for net-metering through the local DISCOM requires adherence to specific regional guidelines. Clients should anticipate that the speed of approval for net-metering applications is dependent on the current processing workload and procedural timelines of the regional electricity distribution company.

Get a quote from SES SOLAR NETWORK

SES SOLAR NETWORK hasn't yet confirmed lead notifications on GreenTax.in. Submit and we'll forward your enquiry to a verified active solar installer in Amravati.

Rooftop solar in Amravati, Maharashtra

A standard residential rooftop solar system in Amravati sizes between 1 kW and 5 kW depending on monthly consumption. Most Amravati homeowners pick a 3 kW system — it covers 300–400 units a month and captures the full ₹78,000 PM-Surya Ghar central subsidy.

Installed cost for a 3 kW system runs ₹1.8 lakh to ₹2.4 lakh; after the central subsidy your net outlay is ₹1.0 lakh to ₹1.6 lakh. Payback typically lands between 3.5 and 5 years — and the panels carry a 25-year warranty. SES SOLAR NETWORK can quote your specific roof; use the Get Quote form above or call 095116 86758.

The installer handles the PM-Surya Ghar registration, DISCOM net-metering application, system installation, and commissioning. Confirm AMC terms, panel warranty (look for Tier-1 manufacturer + 25-year linear-power guarantee), and inverter warranty (10 years minimum) before signing.

What to check before booking

  • Site visit and shading analysis — this determines the realistic kW your roof can support
  • PM-Surya Ghar registration done on your behalf, with the ₹78,000 subsidy credited directly to your bank
  • DISCOM net-metering application and commissioning — installer should handle this end-to-end
  • Tier-1 panels with 25-year linear-power warranty (degradation ≤0.55% per year)
  • Inverter warranty (10 years minimum) and on-site replacement policy
  • AMC contract for at least 5 years (panel cleaning, performance check, inverter health)

Frequently asked questions

How much PM-Surya Ghar subsidy can I get in Amravati?

PM-Surya Ghar: Muft Bijli Yojana offers up to ₹78,000 for a residential rooftop solar system (₹30,000 per kW for the first 2 kW, ₹18,000 for the 3rd kW). Most households choose a 3 kW system to capture the full subsidy. Maharashtra residents apply through the national pmsuryaghar.gov.in portal — your DISCOM and the installer handle the rest.

What's the typical cost of a 3 kW system in Amravati?

A 3 kW grid-connected residential rooftop system costs ₹1.8 lakh to ₹2.4 lakh installed (₹60,000 – ₹80,000 per kW). After the ₹78,000 PM-Surya Ghar subsidy, your net cost is ₹1.0 lakh to ₹1.6 lakh. Payback for a typical household in Maharashtra is 3.5 – 5 years; the panels carry a 25-year warranty.

Does SES SOLAR NETWORK handle net-metering paperwork?

Reputable solar installers handle the net-metering and DISCOM application end-to-end — site survey, design, DISCOM application, installation, commissioning, and meter installation. Confirm with SES SOLAR NETWORK when you call (095116 86758) or fill the Get Quote form above.

What panels and inverters does SES SOLAR NETWORK typically install?

For PM-Surya Ghar eligibility, panels must be from approved manufacturers — typically Tier-1 brands such as Adani, Vikram, Waaree, Tata Power Solar, Premier Energies, or Loom Solar. Inverters are usually Growatt, Solis, Microtek, Polycab, or Luminous. Ask for the specific model and the 25-year linear-power warranty document.

How long does installation take?

Typical timeline: 3 days for site survey + design, 10–20 days for DISCOM approval, 1–2 days for installation, 7–15 days for net-meter installation and commissioning. End-to-end is 4–8 weeks for most residential installations in Amravati.

Location

House No. 26, Garden Amravati, Krushak Colony Rd Number 1, Prashant Nagar, Savata Colony, Wadali Naka, Amravati, Maharashtra 444606, India

View on Google Maps →

Opening hours

SundayClosed
Monday00:00 – 00:00
TuesdayClosed
WednesdayClosed
ThursdayClosed
FridayClosed
SaturdayClosed
Chat with us