About
Rooftop solar installations provide an option for generating decentralized electricity for residential and commercial properties. Customers in the Sonipat area often utilize these systems to offset grid consumption. When integrating solar power with the local distribution company (DISCOM) network, the process requires adherence to specific net-metering guidelines. Understanding the local utility's application procedures is a key step for system commissioning. The feasibility of connecting a solar system to the grid depends heavily on the DISCOM's current processing capacity for net-metering applications. Clients should anticipate that the timeline for approval and final connection can vary based on the utility's workload and inspection schedule. Having a clear understanding of the local utility's requirements helps manage the overall project timeline. This service supports property owners looking to maximize self-consumption while remaining compliant with regional power distribution regulations.
Get a quote from Shiv Shakti Solar
Shiv Shakti Solar hasn't yet confirmed lead notifications on GreenTax.in. Submit and we'll forward your enquiry to a verified active solar installer in Sonipat.
Rooftop solar in Sonipat, Haryana
A standard residential rooftop solar system in Sonipat sizes between 1 kW and 5 kW depending on monthly consumption. Most Sonipat homeowners pick a 3 kW system — it covers 300–400 units a month and captures the full ₹78,000 PM-Surya Ghar central subsidy.
Installed cost for a 3 kW system runs ₹1.8 lakh to ₹2.4 lakh; after the central subsidy your net outlay is ₹1.0 lakh to ₹1.6 lakh. Payback typically lands between 3.5 and 5 years — and the panels carry a 25-year warranty. Shiv Shakti Solar can quote your specific roof; use the Get Quote form above or call 092552 89161.
The installer handles the PM-Surya Ghar registration, DISCOM net-metering application, system installation, and commissioning. Confirm AMC terms, panel warranty (look for Tier-1 manufacturer + 25-year linear-power guarantee), and inverter warranty (10 years minimum) before signing.
What to check before booking
- Site visit and shading analysis — this determines the realistic kW your roof can support
- PM-Surya Ghar registration done on your behalf, with the ₹78,000 subsidy credited directly to your bank
- DISCOM net-metering application and commissioning — installer should handle this end-to-end
- Tier-1 panels with 25-year linear-power warranty (degradation ≤0.55% per year)
- Inverter warranty (10 years minimum) and on-site replacement policy
- AMC contract for at least 5 years (panel cleaning, performance check, inverter health)
Frequently asked questions
How much PM-Surya Ghar subsidy can I get in Sonipat?
PM-Surya Ghar: Muft Bijli Yojana offers up to ₹78,000 for a residential rooftop solar system (₹30,000 per kW for the first 2 kW, ₹18,000 for the 3rd kW). Most households choose a 3 kW system to capture the full subsidy. Haryana residents apply through the national pmsuryaghar.gov.in portal — your DISCOM and the installer handle the rest.
What's the typical cost of a 3 kW system in Sonipat?
A 3 kW grid-connected residential rooftop system costs ₹1.8 lakh to ₹2.4 lakh installed (₹60,000 – ₹80,000 per kW). After the ₹78,000 PM-Surya Ghar subsidy, your net cost is ₹1.0 lakh to ₹1.6 lakh. Payback for a typical household in Haryana is 3.5 – 5 years; the panels carry a 25-year warranty.
Does Shiv Shakti Solar handle net-metering paperwork?
Reputable solar installers handle the net-metering and DISCOM application end-to-end — site survey, design, DISCOM application, installation, commissioning, and meter installation. Confirm with Shiv Shakti Solar when you call (092552 89161) or fill the Get Quote form above.
What panels and inverters does Shiv Shakti Solar typically install?
For PM-Surya Ghar eligibility, panels must be from approved manufacturers — typically Tier-1 brands such as Adani, Vikram, Waaree, Tata Power Solar, Premier Energies, or Loom Solar. Inverters are usually Growatt, Solis, Microtek, Polycab, or Luminous. Ask for the specific model and the 25-year linear-power warranty document.
How long does installation take?
Typical timeline: 3 days for site survey + design, 10–20 days for DISCOM approval, 1–2 days for installation, 7–15 days for net-meter installation and commissioning. End-to-end is 4–8 weeks for most residential installations in Sonipat.
Location
1, opp. Subhash Stadium, Jain Bagh Colony, Sonipat, Haryana 131001, India
View on Google Maps →Opening hours
| Sunday | 09:00 – 17:00 |
|---|---|
| Monday | 09:00 – 17:00 |
| Tuesday | 09:00 – 17:00 |
| Wednesday | 09:00 – 17:00 |
| Thursday | 09:00 – 17:00 |
| Friday | 09:00 – 17:00 |
| Saturday | 09:00 – 17:00 |
