About
Visitors can expect an initial consultation regarding the feasibility of rooftop solar installations at the property. The services provided are relevant for residential and small commercial consumers in the Patiala area seeking to integrate solar power into their existing electrical infrastructure. When considering grid connectivity, understanding the local Distribution Company (DISCOM) net-metering process is a key step. Applicants should anticipate that the utility's processing time for net-metering applications can vary significantly based on current departmental workloads. It is practical for prospective buyers to confirm the specific documentation required by the local DISCOM office before submitting the formal application. Furthermore, while the installation process itself is managed by the local team, the timeline for grid approval remains dependent on the utility's internal review cycles.
Get a quote from Shri Balaji Solar
Shri Balaji Solar hasn't yet confirmed lead notifications on GreenTax.in. Submit and we'll forward your enquiry to a verified active solar installer in Patiala.
Rooftop solar in Patiala, Punjab
A standard residential rooftop solar system in Patiala sizes between 1 kW and 5 kW depending on monthly consumption. Most Patiala homeowners pick a 3 kW system — it covers 300–400 units a month and captures the full ₹78,000 PM-Surya Ghar central subsidy.
Installed cost for a 3 kW system runs ₹1.8 lakh to ₹2.4 lakh; after the central subsidy your net outlay is ₹1.0 lakh to ₹1.6 lakh. Payback typically lands between 3.5 and 5 years — and the panels carry a 25-year warranty. Shri Balaji Solar can quote your specific roof; use the Get Quote form above or call 098154 59240.
The installer handles the PM-Surya Ghar registration, DISCOM net-metering application, system installation, and commissioning. Confirm AMC terms, panel warranty (look for Tier-1 manufacturer + 25-year linear-power guarantee), and inverter warranty (10 years minimum) before signing.
What to check before booking
- Site visit and shading analysis — this determines the realistic kW your roof can support
- PM-Surya Ghar registration done on your behalf, with the ₹78,000 subsidy credited directly to your bank
- DISCOM net-metering application and commissioning — installer should handle this end-to-end
- Tier-1 panels with 25-year linear-power warranty (degradation ≤0.55% per year)
- Inverter warranty (10 years minimum) and on-site replacement policy
- AMC contract for at least 5 years (panel cleaning, performance check, inverter health)
Frequently asked questions
How much PM-Surya Ghar subsidy can I get in Patiala?
PM-Surya Ghar: Muft Bijli Yojana offers up to ₹78,000 for a residential rooftop solar system (₹30,000 per kW for the first 2 kW, ₹18,000 for the 3rd kW). Most households choose a 3 kW system to capture the full subsidy. Punjab residents apply through the national pmsuryaghar.gov.in portal — your DISCOM and the installer handle the rest.
What's the typical cost of a 3 kW system in Patiala?
A 3 kW grid-connected residential rooftop system costs ₹1.8 lakh to ₹2.4 lakh installed (₹60,000 – ₹80,000 per kW). After the ₹78,000 PM-Surya Ghar subsidy, your net cost is ₹1.0 lakh to ₹1.6 lakh. Payback for a typical household in Punjab is 3.5 – 5 years; the panels carry a 25-year warranty.
Does Shri Balaji Solar handle net-metering paperwork?
Reputable solar installers handle the net-metering and DISCOM application end-to-end — site survey, design, DISCOM application, installation, commissioning, and meter installation. Confirm with Shri Balaji Solar when you call (098154 59240) or fill the Get Quote form above.
What panels and inverters does Shri Balaji Solar typically install?
For PM-Surya Ghar eligibility, panels must be from approved manufacturers — typically Tier-1 brands such as Adani, Vikram, Waaree, Tata Power Solar, Premier Energies, or Loom Solar. Inverters are usually Growatt, Solis, Microtek, Polycab, or Luminous. Ask for the specific model and the 25-year linear-power warranty document.
How long does installation take?
Typical timeline: 3 days for site survey + design, 10–20 days for DISCOM approval, 1–2 days for installation, 7–15 days for net-meter installation and commissioning. End-to-end is 4–8 weeks for most residential installations in Patiala.
Location
Opp Avtar Dharam Kanda, Sirhind - Patiala Rd, near Jasoda Hyundai Showroom, Ranjeet Nagar, Hassanpur, Patiala, Hassanpur Prohtan, Punjab 147004, India
View on Google Maps →Opening hours
| Sunday | Closed |
|---|---|
| Monday | 09:00 – 19:00 |
| Tuesday | 09:00 – 19:00 |
| Wednesday | 09:00 – 19:00 |
| Thursday | 09:00 – 19:00 |
| Friday | 09:00 – 19:00 |
| Saturday | 09:00 – 19:00 |
