Shri Hari Solar Power Pvt Ltd

Rooftop solar installer in Bilaspur, Chhattisgarh. ★ 5.0 (4 Google reviews) Updated August 2026.

About

Visitors can expect a detailed assessment of the property's suitability for solar energy generation during an initial consultation. The process involves evaluating the physical structure and the available roof space to determine the optimal system size. For residential and small commercial properties in the Bilaspur area, a thorough site survey is necessary to account for local architectural considerations and roof material integrity. A key component of the evaluation is the shading analysis. This technical review examines the roof's orientation and potential obstructions, such as nearby trees or adjacent buildings, which can significantly reduce energy yield. Based on this analysis, the installer determines the realistic kilowatt capacity the roof can safely and effectively support. The resulting assessment provides a concrete understanding of the achievable solar potential for the specific site. This technical evaluation helps property owners understand the maximum viable system size before any equipment is installed.

Get a quote from Shri Hari Solar Power Pvt Ltd

Shri Hari Solar Power Pvt Ltd hasn't yet confirmed lead notifications on GreenTax.in. Submit and we'll forward your enquiry to a verified active solar installer in Bilaspur.

Rooftop solar in Bilaspur, Chhattisgarh

A standard residential rooftop solar system in Bilaspur sizes between 1 kW and 5 kW depending on monthly consumption. Most Bilaspur homeowners pick a 3 kW system — it covers 300–400 units a month and captures the full ₹78,000 PM-Surya Ghar central subsidy.

Installed cost for a 3 kW system runs ₹1.8 lakh to ₹2.4 lakh; after the central subsidy your net outlay is ₹1.0 lakh to ₹1.6 lakh. Payback typically lands between 3.5 and 5 years — and the panels carry a 25-year warranty. Shri Hari Solar Power Pvt Ltd can quote your specific roof; use the Get Quote form above or call 075099 99073.

The installer handles the PM-Surya Ghar registration, DISCOM net-metering application, system installation, and commissioning. Confirm AMC terms, panel warranty (look for Tier-1 manufacturer + 25-year linear-power guarantee), and inverter warranty (10 years minimum) before signing.

What to check before booking

  • Site visit and shading analysis — this determines the realistic kW your roof can support
  • PM-Surya Ghar registration done on your behalf, with the ₹78,000 subsidy credited directly to your bank
  • DISCOM net-metering application and commissioning — installer should handle this end-to-end
  • Tier-1 panels with 25-year linear-power warranty (degradation ≤0.55% per year)
  • Inverter warranty (10 years minimum) and on-site replacement policy
  • AMC contract for at least 5 years (panel cleaning, performance check, inverter health)

Frequently asked questions

How much PM-Surya Ghar subsidy can I get in Bilaspur?

PM-Surya Ghar: Muft Bijli Yojana offers up to ₹78,000 for a residential rooftop solar system (₹30,000 per kW for the first 2 kW, ₹18,000 for the 3rd kW). Most households choose a 3 kW system to capture the full subsidy. Chhattisgarh residents apply through the national pmsuryaghar.gov.in portal — your DISCOM and the installer handle the rest.

What's the typical cost of a 3 kW system in Bilaspur?

A 3 kW grid-connected residential rooftop system costs ₹1.8 lakh to ₹2.4 lakh installed (₹60,000 – ₹80,000 per kW). After the ₹78,000 PM-Surya Ghar subsidy, your net cost is ₹1.0 lakh to ₹1.6 lakh. Payback for a typical household in Chhattisgarh is 3.5 – 5 years; the panels carry a 25-year warranty.

Does Shri Hari Solar Power Pvt Ltd handle net-metering paperwork?

Reputable solar installers handle the net-metering and DISCOM application end-to-end — site survey, design, DISCOM application, installation, commissioning, and meter installation. Confirm with Shri Hari Solar Power Pvt Ltd when you call (075099 99073) or fill the Get Quote form above.

What panels and inverters does Shri Hari Solar Power Pvt Ltd typically install?

For PM-Surya Ghar eligibility, panels must be from approved manufacturers — typically Tier-1 brands such as Adani, Vikram, Waaree, Tata Power Solar, Premier Energies, or Loom Solar. Inverters are usually Growatt, Solis, Microtek, Polycab, or Luminous. Ask for the specific model and the 25-year linear-power warranty document.

How long does installation take?

Typical timeline: 3 days for site survey + design, 10–20 days for DISCOM approval, 1–2 days for installation, 7–15 days for net-meter installation and commissioning. End-to-end is 4–8 weeks for most residential installations in Bilaspur.

Location

S-5, Mahamaya Plaza Main Road, Mundra Hospital, Mangla Chowk, Mangla, Bilaspur, Juna, Chhattisgarh 495001, India

View on Google Maps →

Opening hours

Sunday11:00 – 21:00
Monday10:00 – 21:00
Tuesday11:00 – 21:00
Wednesday11:00 – 21:00
Thursday11:00 – 21:00
Friday11:00 – 21:00
Saturday11:00 – 21:00
Chat with us