About
Rooftop solar installations provide an option for generating electricity directly at the point of use. Service providers in this area often cater to homeowners and small commercial properties looking to integrate renewable energy sources into existing structures. When selecting equipment, the company offers choices in inverter technology to match specific energy requirements and load profiles. Furthermore, the service includes provisions for equipment warranty coverage, which outlines the duration and scope of protection for installed components. The operational policy addresses hardware failures through an on-site replacement process, detailing the steps taken when equipment requires servicing after installation. This structure is designed for property owners seeking a reliable, integrated power solution for their premises.
Get a quote from SK Power Solar
SK Power Solar hasn't yet confirmed lead notifications on GreenTax.in. Submit and we'll forward your enquiry to a verified active solar installer in Karnal.
Rooftop solar in Karnal, Haryana
A standard residential rooftop solar system in Karnal sizes between 1 kW and 5 kW depending on monthly consumption. Most Karnal homeowners pick a 3 kW system — it covers 300–400 units a month and captures the full ₹78,000 PM-Surya Ghar central subsidy.
Installed cost for a 3 kW system runs ₹1.8 lakh to ₹2.4 lakh; after the central subsidy your net outlay is ₹1.0 lakh to ₹1.6 lakh. Payback typically lands between 3.5 and 5 years — and the panels carry a 25-year warranty. SK Power Solar can quote your specific roof; use the Get Quote form above or call 098961 82128.
The installer handles the PM-Surya Ghar registration, DISCOM net-metering application, system installation, and commissioning. Confirm AMC terms, panel warranty (look for Tier-1 manufacturer + 25-year linear-power guarantee), and inverter warranty (10 years minimum) before signing.
What to check before booking
- Site visit and shading analysis — this determines the realistic kW your roof can support
- PM-Surya Ghar registration done on your behalf, with the ₹78,000 subsidy credited directly to your bank
- DISCOM net-metering application and commissioning — installer should handle this end-to-end
- Tier-1 panels with 25-year linear-power warranty (degradation ≤0.55% per year)
- Inverter warranty (10 years minimum) and on-site replacement policy
- AMC contract for at least 5 years (panel cleaning, performance check, inverter health)
Frequently asked questions
How much PM-Surya Ghar subsidy can I get in Karnal?
PM-Surya Ghar: Muft Bijli Yojana offers up to ₹78,000 for a residential rooftop solar system (₹30,000 per kW for the first 2 kW, ₹18,000 for the 3rd kW). Most households choose a 3 kW system to capture the full subsidy. Haryana residents apply through the national pmsuryaghar.gov.in portal — your DISCOM and the installer handle the rest.
What's the typical cost of a 3 kW system in Karnal?
A 3 kW grid-connected residential rooftop system costs ₹1.8 lakh to ₹2.4 lakh installed (₹60,000 – ₹80,000 per kW). After the ₹78,000 PM-Surya Ghar subsidy, your net cost is ₹1.0 lakh to ₹1.6 lakh. Payback for a typical household in Haryana is 3.5 – 5 years; the panels carry a 25-year warranty.
Does SK Power Solar handle net-metering paperwork?
Reputable solar installers handle the net-metering and DISCOM application end-to-end — site survey, design, DISCOM application, installation, commissioning, and meter installation. Confirm with SK Power Solar when you call (098961 82128) or fill the Get Quote form above.
What panels and inverters does SK Power Solar typically install?
For PM-Surya Ghar eligibility, panels must be from approved manufacturers — typically Tier-1 brands such as Adani, Vikram, Waaree, Tata Power Solar, Premier Energies, or Loom Solar. Inverters are usually Growatt, Solis, Microtek, Polycab, or Luminous. Ask for the specific model and the 25-year linear-power warranty document.
How long does installation take?
Typical timeline: 3 days for site survey + design, 10–20 days for DISCOM approval, 1–2 days for installation, 7–15 days for net-meter installation and commissioning. End-to-end is 4–8 weeks for most residential installations in Karnal.
Location
Pal Nagar, near HP Petrol Pump, Saidpura, Pundrak, Karnal, Haryana 132001, India
View on Google Maps →Opening hours
| Sunday | Closed |
|---|---|
| Monday | 09:30 – 18:30 |
| Tuesday | 09:30 – 18:30 |
| Wednesday | 09:30 – 18:30 |
| Thursday | 09:30 – 18:30 |
| Friday | 09:30 – 18:30 |
| Saturday | 09:30 – 18:30 |
