Visitors can expect an initial consultation regarding solar photovoltaic system requirements and feasibility assessments. The service area primarily serves residential and small commercial properties within the Jaipur region. Customers interested in integrating rooftop solar power should be aware of the local utility's procedures concerning net-metering applications. Successfully connecting to the grid requires navigating the specific guidelines set by the local DISCOM. While the process is standardized, the actual processing time for net-metering approvals can vary based on the utility's current workload and documentation completeness. It is advisable for prospective buyers to confirm the current status of the net-metering policy directly with the relevant DISCOM office before finalizing system design. Furthermore, understanding the specific interconnection agreement required by the local utility is a practical step that can streamline the overall project timeline.
Get a quote from Sky FinCorp : Suryam Urja (SOLAR)
Submit your name + phone to reveal Sky FinCorp : Suryam Urja (SOLAR)'s contact and notify them. No spam, no obligation.
Rooftop solar in Jaipur, Rajasthan
A standard residential rooftop solar system in Jaipur sizes between 1 kW and 5 kW depending on monthly consumption. Most Jaipur homeowners pick a 3 kW system — it covers 300–400 units a month and captures the full ₹78,000 PM-Surya Ghar central subsidy.
Installed cost for a 3 kW system runs ₹1.8 lakh to ₹2.4 lakh; after the central subsidy your net outlay is ₹1.0 lakh to ₹1.6 lakh. Payback typically lands between 3.5 and 5 years — and the panels carry a 25-year warranty. Sky FinCorp : Suryam Urja (SOLAR) can quote your specific roof; use the Get Quote form above or call 090577 77665.
The installer handles the PM-Surya Ghar registration, DISCOM net-metering application, system installation, and commissioning. Confirm AMC terms, panel warranty (look for Tier-1 manufacturer + 25-year linear-power guarantee), and inverter warranty (10 years minimum) before signing.
What to check before booking
- Site visit and shading analysis — this determines the realistic kW your roof can support
- PM-Surya Ghar registration done on your behalf, with the ₹78,000 subsidy credited directly to your bank
- DISCOM net-metering application and commissioning — installer should handle this end-to-end
- Tier-1 panels with 25-year linear-power warranty (degradation ≤0.55% per year)
- Inverter warranty (10 years minimum) and on-site replacement policy
- AMC contract for at least 5 years (panel cleaning, performance check, inverter health)
Frequently asked questions
How much PM-Surya Ghar subsidy can I get in Jaipur?
PM-Surya Ghar: Muft Bijli Yojana offers up to ₹78,000 for a residential rooftop solar system (₹30,000 per kW for the first 2 kW, ₹18,000 for the 3rd kW). Most households choose a 3 kW system to capture the full subsidy. Rajasthan residents apply through the national pmsuryaghar.gov.in portal — your DISCOM and the installer handle the rest.
What's the typical cost of a 3 kW system in Jaipur?
A 3 kW grid-connected residential rooftop system costs ₹1.8 lakh to ₹2.4 lakh installed (₹60,000 – ₹80,000 per kW). After the ₹78,000 PM-Surya Ghar subsidy, your net cost is ₹1.0 lakh to ₹1.6 lakh. Payback for a typical household in Rajasthan is 3.5 – 5 years; the panels carry a 25-year warranty.
Does Sky FinCorp : Suryam Urja (SOLAR) handle net-metering paperwork?
Reputable solar installers handle the net-metering and DISCOM application end-to-end — site survey, design, DISCOM application, installation, commissioning, and meter installation. Confirm with Sky FinCorp : Suryam Urja (SOLAR) when you call (090577 77665) or fill the Get Quote form above.
What panels and inverters does Sky FinCorp : Suryam Urja (SOLAR) typically install?
For PM-Surya Ghar eligibility, panels must be from approved manufacturers — typically Tier-1 brands such as Adani, Vikram, Waaree, Tata Power Solar, Premier Energies, or Loom Solar. Inverters are usually Growatt, Solis, Microtek, Polycab, or Luminous. Ask for the specific model and the 25-year linear-power warranty document.
How long does installation take?
Typical timeline: 3 days for site survey + design, 10–20 days for DISCOM approval, 1–2 days for installation, 7–15 days for net-meter installation and commissioning. End-to-end is 4–8 weeks for most residential installations in Jaipur.
Location
Stadium Road, B-1/562, Chitrakoot Marg, Vaishali Nagar, Jaipur, Rajasthan 302021, India
View on Google Maps →Opening hours
| Sunday | 09:30 – 19:00 |
|---|---|
| Monday | 09:30 – 19:00 |
| Tuesday | 09:30 – 19:00 |
| Wednesday | 09:30 – 19:00 |
| Thursday | 09:30 – 19:00 |
| Friday | 09:30 – 19:00 |
| Saturday | 09:30 – 19:00 |