About
The climate in Aligarh, Uttar Pradesh, provides consistent solar irradiation, making rooftop photovoltaic installations a viable option for reducing reliance on grid electricity. Homeowners and property owners seeking to integrate renewable energy sources into their residences are typically the primary clientele served by this facility. Navigating the subsidy process for the PM-Surya Ghar scheme requires attention to specific documentation and timing. Applicants should confirm the current eligibility criteria on the official portal, as guidelines are subject to change. Generally, the process involves submitting proof of property ownership and necessary identity documents before initiating the formal application. To streamline the subsidy paperwork, it is advisable for prospective customers to gather all required documentation, such as property tax receipts and
Get a quote from SOLAR Energy CO.(R.P.S Enterprises)
SOLAR Energy CO.(R.P.S Enterprises) hasn't yet confirmed lead notifications on GreenTax.in. Submit and we'll forward your enquiry to a verified active solar installer in Aligarh.
Rooftop solar in Aligarh, Uttar Pradesh
A standard residential rooftop solar system in Aligarh sizes between 1 kW and 5 kW depending on monthly consumption. Most Aligarh homeowners pick a 3 kW system — it covers 300–400 units a month and captures the full ₹78,000 PM-Surya Ghar central subsidy.
Installed cost for a 3 kW system runs ₹1.8 lakh to ₹2.4 lakh; after the central subsidy your net outlay is ₹1.0 lakh to ₹1.6 lakh. Payback typically lands between 3.5 and 5 years — and the panels carry a 25-year warranty. SOLAR Energy CO.(R.P.S Enterprises) can quote your specific roof; use the Get Quote form above or call 081268 32366.
The installer handles the PM-Surya Ghar registration, DISCOM net-metering application, system installation, and commissioning. Confirm AMC terms, panel warranty (look for Tier-1 manufacturer + 25-year linear-power guarantee), and inverter warranty (10 years minimum) before signing.
What to check before booking
- Site visit and shading analysis — this determines the realistic kW your roof can support
- PM-Surya Ghar registration done on your behalf, with the ₹78,000 subsidy credited directly to your bank
- DISCOM net-metering application and commissioning — installer should handle this end-to-end
- Tier-1 panels with 25-year linear-power warranty (degradation ≤0.55% per year)
- Inverter warranty (10 years minimum) and on-site replacement policy
- AMC contract for at least 5 years (panel cleaning, performance check, inverter health)
Frequently asked questions
How much PM-Surya Ghar subsidy can I get in Aligarh?
PM-Surya Ghar: Muft Bijli Yojana offers up to ₹78,000 for a residential rooftop solar system (₹30,000 per kW for the first 2 kW, ₹18,000 for the 3rd kW). Most households choose a 3 kW system to capture the full subsidy. Uttar Pradesh residents apply through the national pmsuryaghar.gov.in portal — your DISCOM and the installer handle the rest.
What's the typical cost of a 3 kW system in Aligarh?
A 3 kW grid-connected residential rooftop system costs ₹1.8 lakh to ₹2.4 lakh installed (₹60,000 – ₹80,000 per kW). After the ₹78,000 PM-Surya Ghar subsidy, your net cost is ₹1.0 lakh to ₹1.6 lakh. Payback for a typical household in Uttar Pradesh is 3.5 – 5 years; the panels carry a 25-year warranty.
Does SOLAR Energy CO.(R.P.S Enterprises) handle net-metering paperwork?
Reputable solar installers handle the net-metering and DISCOM application end-to-end — site survey, design, DISCOM application, installation, commissioning, and meter installation. Confirm with SOLAR Energy CO.(R.P.S Enterprises) when you call (081268 32366) or fill the Get Quote form above.
What panels and inverters does SOLAR Energy CO.(R.P.S Enterprises) typically install?
For PM-Surya Ghar eligibility, panels must be from approved manufacturers — typically Tier-1 brands such as Adani, Vikram, Waaree, Tata Power Solar, Premier Energies, or Loom Solar. Inverters are usually Growatt, Solis, Microtek, Polycab, or Luminous. Ask for the specific model and the 25-year linear-power warranty document.
How long does installation take?
Typical timeline: 3 days for site survey + design, 10–20 days for DISCOM approval, 1–2 days for installation, 7–15 days for net-meter installation and commissioning. End-to-end is 4–8 weeks for most residential installations in Aligarh.
Location
17/236, B-1, VIVEK VIHAR COLONY PARK, Lodhi Puram Colony, Sasni Gate, Aligarh, Uttar Pradesh 202001, India
View on Google Maps →Opening hours
| Sunday | 08:00 – 21:00 |
|---|---|
| Monday | 08:00 – 21:00 |
| Tuesday | 08:00 – 21:00 |
| Wednesday | 08:00 – 21:00 |
| Thursday | 08:00 – 21:00 |
| Friday | 08:00 – 21:00 |
| Saturday | 08:00 – 21:00 |
