Solar Energy Corporation of India Limited (SECI)

Rooftop solar installer in New Delhi, Delhi. ★ 4.6 (94 Google reviews) Updated June 2026.

About

Visitors can expect a detailed assessment of the property's existing structure and energy needs during an initial consultation. The process involves evaluating the roof's physical characteristics to determine its suitability for solar photovoltaic installation. For homeowners or commercial entities in the New Delhi area, the initial site survey is designed to match the system's potential output with the actual consumption patterns of the building. A key component of the evaluation is the shading analysis, which maps out potential obstructions throughout the day. This analysis helps engineers calculate the maximum achievable energy yield while accounting for shadows cast by surrounding structures or trees. Based on this comprehensive assessment, a realistic kilowatt capacity that the roof can reliably support is established. The resulting recommendation provides a technical scope of work, detailing the optimal placement and size of the array. This initial technical report serves as the basis for system design, ensuring that the installed capacity aligns with the available, unshaded roof space.

Get a quote from Solar Energy Corporation of India Limited (SECI)

Solar Energy Corporation of India Limited (SECI) hasn't yet confirmed lead notifications on GreenTax.in. Submit and we'll forward your enquiry to a verified active solar installer in New Delhi.

Rooftop solar in New Delhi, Delhi

A standard residential rooftop solar system in New Delhi sizes between 1 kW and 5 kW depending on monthly consumption. Most New Delhi homeowners pick a 3 kW system — it covers 300–400 units a month and captures the full ₹78,000 PM-Surya Ghar central subsidy.

Installed cost for a 3 kW system runs ₹1.8 lakh to ₹2.4 lakh; after the central subsidy your net outlay is ₹1.0 lakh to ₹1.6 lakh. Payback typically lands between 3.5 and 5 years — and the panels carry a 25-year warranty. Solar Energy Corporation of India Limited (SECI) can quote your specific roof; use the Get Quote form above or call 011 7198 9200.

The installer handles the PM-Surya Ghar registration, DISCOM net-metering application, system installation, and commissioning. Confirm AMC terms, panel warranty (look for Tier-1 manufacturer + 25-year linear-power guarantee), and inverter warranty (10 years minimum) before signing.

What to check before booking

  • Site visit and shading analysis — this determines the realistic kW your roof can support
  • PM-Surya Ghar registration done on your behalf, with the ₹78,000 subsidy credited directly to your bank
  • DISCOM net-metering application and commissioning — installer should handle this end-to-end
  • Tier-1 panels with 25-year linear-power warranty (degradation ≤0.55% per year)
  • Inverter warranty (10 years minimum) and on-site replacement policy
  • AMC contract for at least 5 years (panel cleaning, performance check, inverter health)

Frequently asked questions

How much PM-Surya Ghar subsidy can I get in New Delhi?

PM-Surya Ghar: Muft Bijli Yojana offers up to ₹78,000 for a residential rooftop solar system (₹30,000 per kW for the first 2 kW, ₹18,000 for the 3rd kW). Most households choose a 3 kW system to capture the full subsidy. Delhi residents apply through the national pmsuryaghar.gov.in portal — your DISCOM and the installer handle the rest.

What's the typical cost of a 3 kW system in New Delhi?

A 3 kW grid-connected residential rooftop system costs ₹1.8 lakh to ₹2.4 lakh installed (₹60,000 – ₹80,000 per kW). After the ₹78,000 PM-Surya Ghar subsidy, your net cost is ₹1.0 lakh to ₹1.6 lakh. Payback for a typical household in Delhi is 3.5 – 5 years; the panels carry a 25-year warranty.

Does Solar Energy Corporation of India Limited (SECI) handle net-metering paperwork?

Reputable solar installers handle the net-metering and DISCOM application end-to-end — site survey, design, DISCOM application, installation, commissioning, and meter installation. Confirm with Solar Energy Corporation of India Limited (SECI) when you call (011 7198 9200) or fill the Get Quote form above.

What panels and inverters does Solar Energy Corporation of India Limited (SECI) typically install?

For PM-Surya Ghar eligibility, panels must be from approved manufacturers — typically Tier-1 brands such as Adani, Vikram, Waaree, Tata Power Solar, Premier Energies, or Loom Solar. Inverters are usually Growatt, Solis, Microtek, Polycab, or Luminous. Ask for the specific model and the 25-year linear-power warranty document.

How long does installation take?

Typical timeline: 3 days for site survey + design, 10–20 days for DISCOM approval, 1–2 days for installation, 7–15 days for net-meter installation and commissioning. End-to-end is 4–8 weeks for most residential installations in New Delhi.

Location

Block Tower 2, NBCC TOWER, Block B, East Kidwai Nagar, Kidwai Nagar, New Delhi, Delhi 110023, India

View on Google Maps →

Opening hours

SundayClosed
Monday09:30 – 18:00
Tuesday09:30 – 18:00
Wednesday09:30 – 18:00
Thursday09:30 – 18:00
Friday09:30 – 18:00
SaturdayClosed
Chat with us