Solar Home | Solar Roof Top | Solar Installation Near Me | Solar Company in Indore | Best Solar Company in Indore

Rooftop solar installer in Indore, Madhya Pradesh. ★ 4.9 (33 Google reviews) Updated June 2026.

About

Homeowners interested in integrating rooftop solar systems into their residences often visit this facility. For customers looking to utilize the PM-Surya Ghar subsidy, understanding the application timeline is a key step. The process generally requires initiating the application through the designated government portal before physical installation can be finalized. When preparing for the subsidy paperwork, clients should verify the latest guidelines, as requirements can change. Generally, having ownership proof of the property, valid identity documents for all occupants, and detailed electrical schematics are necessary prerequisites. It is advisable for prospective buyers to confirm the exact documentation checklist with the local authority or the dealer prior to submitting the initial application to prevent delays.

Get a quote from Solar Home | Solar Roof Top | Solar Installation Near Me | Solar Company in Indore | Best Solar Company in Indore

Submit your name + phone to reveal Solar Home | Solar Roof Top | Solar Installation Near Me | Solar Company in Indore | Best Solar Company in Indore's contact and notify them. No spam, no obligation.

Rooftop solar in Indore, Madhya Pradesh

A standard residential rooftop solar system in Indore sizes between 1 kW and 5 kW depending on monthly consumption. Most Indore homeowners pick a 3 kW system — it covers 300–400 units a month and captures the full ₹78,000 PM-Surya Ghar central subsidy.

Installed cost for a 3 kW system runs ₹1.8 lakh to ₹2.4 lakh; after the central subsidy your net outlay is ₹1.0 lakh to ₹1.6 lakh. Payback typically lands between 3.5 and 5 years — and the panels carry a 25-year warranty. Solar Home | Solar Roof Top | Solar Installation Near Me | Solar Company in Indore | Best Solar Company in Indore can quote your specific roof; use the Get Quote form above or call 099264 15196.

The installer handles the PM-Surya Ghar registration, DISCOM net-metering application, system installation, and commissioning. Confirm AMC terms, panel warranty (look for Tier-1 manufacturer + 25-year linear-power guarantee), and inverter warranty (10 years minimum) before signing.

What to check before booking

  • Site visit and shading analysis — this determines the realistic kW your roof can support
  • PM-Surya Ghar registration done on your behalf, with the ₹78,000 subsidy credited directly to your bank
  • DISCOM net-metering application and commissioning — installer should handle this end-to-end
  • Tier-1 panels with 25-year linear-power warranty (degradation ≤0.55% per year)
  • Inverter warranty (10 years minimum) and on-site replacement policy
  • AMC contract for at least 5 years (panel cleaning, performance check, inverter health)

Frequently asked questions

How much PM-Surya Ghar subsidy can I get in Indore?

PM-Surya Ghar: Muft Bijli Yojana offers up to ₹78,000 for a residential rooftop solar system (₹30,000 per kW for the first 2 kW, ₹18,000 for the 3rd kW). Most households choose a 3 kW system to capture the full subsidy. Madhya Pradesh residents apply through the national pmsuryaghar.gov.in portal — your DISCOM and the installer handle the rest.

What's the typical cost of a 3 kW system in Indore?

A 3 kW grid-connected residential rooftop system costs ₹1.8 lakh to ₹2.4 lakh installed (₹60,000 – ₹80,000 per kW). After the ₹78,000 PM-Surya Ghar subsidy, your net cost is ₹1.0 lakh to ₹1.6 lakh. Payback for a typical household in Madhya Pradesh is 3.5 – 5 years; the panels carry a 25-year warranty.

Does Solar Home | Solar Roof Top | Solar Installation Near Me | Solar Company in Indore | Best Solar Company in Indore handle net-metering paperwork?

Reputable solar installers handle the net-metering and DISCOM application end-to-end — site survey, design, DISCOM application, installation, commissioning, and meter installation. Confirm with Solar Home | Solar Roof Top | Solar Installation Near Me | Solar Company in Indore | Best Solar Company in Indore when you call (099264 15196) or fill the Get Quote form above.

What panels and inverters does Solar Home | Solar Roof Top | Solar Installation Near Me | Solar Company in Indore | Best Solar Company in Indore typically install?

For PM-Surya Ghar eligibility, panels must be from approved manufacturers — typically Tier-1 brands such as Adani, Vikram, Waaree, Tata Power Solar, Premier Energies, or Loom Solar. Inverters are usually Growatt, Solis, Microtek, Polycab, or Luminous. Ask for the specific model and the 25-year linear-power warranty document.

How long does installation take?

Typical timeline: 3 days for site survey + design, 10–20 days for DISCOM approval, 1–2 days for installation, 7–15 days for net-meter installation and commissioning. End-to-end is 4–8 weeks for most residential installations in Indore.

Location

61/1, near Gopur Square, Sector E, Sudama Nagar, Indore, Madhya Pradesh 452009, India

View on Google Maps →

Opening hours

Sunday10:30 – 20:30
Monday10:30 – 20:30
Tuesday10:30 – 20:30
Wednesday10:30 – 20:30
Thursday10:30 – 20:30
Friday10:30 – 20:30
Saturday10:30 – 20:30
Chat with us