Solar-Nakoda Solar Solutions (Authorised Dealer of TATA POWER SOLAR)

Rooftop solar installer in Jodhpur, Rajasthan. ★ 4.4 (13 Google reviews) Updated August 2026.

About

Situated in the Nakoda area of Jodhpur, this provider services customers interested in rooftop solar installations. The company offers Annual Maintenance Contracts (AMC) for installed systems. Routine panel cleaning services are available to maintain system efficiency. Furthermore, post-installation support is provided to assist with the ongoing operation of the solar setup.

Get a quote from Solar-Nakoda Solar Solutions (Authorised Dealer of TATA POWER SOLAR)

Solar-Nakoda Solar Solutions (Authorised Dealer of TATA POWER SOLAR) hasn't yet confirmed lead notifications on GreenTax.in. Submit and we'll forward your enquiry to a verified active solar installer in Jodhpur.

Rooftop solar in Jodhpur, Rajasthan

A standard residential rooftop solar system in Jodhpur sizes between 1 kW and 5 kW depending on monthly consumption. Most Jodhpur homeowners pick a 3 kW system — it covers 300–400 units a month and captures the full ₹78,000 PM-Surya Ghar central subsidy.

Installed cost for a 3 kW system runs ₹1.8 lakh to ₹2.4 lakh; after the central subsidy your net outlay is ₹1.0 lakh to ₹1.6 lakh. Payback typically lands between 3.5 and 5 years — and the panels carry a 25-year warranty. Solar-Nakoda Solar Solutions (Authorised Dealer of TATA POWER SOLAR) can quote your specific roof; use the Get Quote form above or call 077919 99900.

The installer handles the PM-Surya Ghar registration, DISCOM net-metering application, system installation, and commissioning. Confirm AMC terms, panel warranty (look for Tier-1 manufacturer + 25-year linear-power guarantee), and inverter warranty (10 years minimum) before signing.

What to check before booking

  • Site visit and shading analysis — this determines the realistic kW your roof can support
  • PM-Surya Ghar registration done on your behalf, with the ₹78,000 subsidy credited directly to your bank
  • DISCOM net-metering application and commissioning — installer should handle this end-to-end
  • Tier-1 panels with 25-year linear-power warranty (degradation ≤0.55% per year)
  • Inverter warranty (10 years minimum) and on-site replacement policy
  • AMC contract for at least 5 years (panel cleaning, performance check, inverter health)

Frequently asked questions

How much PM-Surya Ghar subsidy can I get in Jodhpur?

PM-Surya Ghar: Muft Bijli Yojana offers up to ₹78,000 for a residential rooftop solar system (₹30,000 per kW for the first 2 kW, ₹18,000 for the 3rd kW). Most households choose a 3 kW system to capture the full subsidy. Rajasthan residents apply through the national pmsuryaghar.gov.in portal — your DISCOM and the installer handle the rest.

What's the typical cost of a 3 kW system in Jodhpur?

A 3 kW grid-connected residential rooftop system costs ₹1.8 lakh to ₹2.4 lakh installed (₹60,000 – ₹80,000 per kW). After the ₹78,000 PM-Surya Ghar subsidy, your net cost is ₹1.0 lakh to ₹1.6 lakh. Payback for a typical household in Rajasthan is 3.5 – 5 years; the panels carry a 25-year warranty.

Does Solar-Nakoda Solar Solutions (Authorised Dealer of TATA POWER SOLAR) handle net-metering paperwork?

Reputable solar installers handle the net-metering and DISCOM application end-to-end — site survey, design, DISCOM application, installation, commissioning, and meter installation. Confirm with Solar-Nakoda Solar Solutions (Authorised Dealer of TATA POWER SOLAR) when you call (077919 99900) or fill the Get Quote form above.

What panels and inverters does Solar-Nakoda Solar Solutions (Authorised Dealer of TATA POWER SOLAR) typically install?

For PM-Surya Ghar eligibility, panels must be from approved manufacturers — typically Tier-1 brands such as Adani, Vikram, Waaree, Tata Power Solar, Premier Energies, or Loom Solar. Inverters are usually Growatt, Solis, Microtek, Polycab, or Luminous. Ask for the specific model and the 25-year linear-power warranty document.

How long does installation take?

Typical timeline: 3 days for site survey + design, 10–20 days for DISCOM approval, 1–2 days for installation, 7–15 days for net-meter installation and commissioning. End-to-end is 4–8 weeks for most residential installations in Jodhpur.

Location

Heavy Industrial Area, behind New Power House Road, Heavy Industrial Area Phase II, Basni, Jodhpur, Rajasthan 342001, India

View on Google Maps →

Opening hours

Sunday09:00 – 13:00
Monday08:00 – 20:00
Tuesday08:00 – 20:00
Wednesday08:00 – 20:00
Thursday08:00 – 20:00
Friday08:00 – 20:00
Saturday08:00 – 20:00
Chat with us