About
Visitors can expect an initial consultation regarding the feasibility of integrating solar power into existing structures. The service area primarily serves residential and small commercial properties within the New Delhi region. Customers interested in grid-tied systems should understand that the process for connecting to the local distribution company (DISCOM) involves specific net-metering applications. Successfully navigating this process requires submitting detailed documentation to the utility provider. Because the processing time for these net-metering applications can vary significantly depending on the current workload of the local utility office, it is advisable for prospective clients to inquire about the typical turnaround time before finalizing system design. Furthermore, understanding the specific guidelines set by the local DISCOM regarding interconnection standards is a necessary preliminary step for any rooftop solar project.
Get a quote from Solar Universe India Pvt. Ltd.
Submit your name + phone to reveal Solar Universe India Pvt. Ltd.'s contact and notify them. No spam, no obligation.
Rooftop solar in New Delhi, Delhi
A standard residential rooftop solar system in New Delhi sizes between 1 kW and 5 kW depending on monthly consumption. Most New Delhi homeowners pick a 3 kW system — it covers 300–400 units a month and captures the full ₹78,000 PM-Surya Ghar central subsidy.
Installed cost for a 3 kW system runs ₹1.8 lakh to ₹2.4 lakh; after the central subsidy your net outlay is ₹1.0 lakh to ₹1.6 lakh. Payback typically lands between 3.5 and 5 years — and the panels carry a 25-year warranty. Solar Universe India Pvt. Ltd. can quote your specific roof; use the Get Quote form above or call 098102 88787.
The installer handles the PM-Surya Ghar registration, DISCOM net-metering application, system installation, and commissioning. Confirm AMC terms, panel warranty (look for Tier-1 manufacturer + 25-year linear-power guarantee), and inverter warranty (10 years minimum) before signing.
What to check before booking
- Site visit and shading analysis — this determines the realistic kW your roof can support
- PM-Surya Ghar registration done on your behalf, with the ₹78,000 subsidy credited directly to your bank
- DISCOM net-metering application and commissioning — installer should handle this end-to-end
- Tier-1 panels with 25-year linear-power warranty (degradation ≤0.55% per year)
- Inverter warranty (10 years minimum) and on-site replacement policy
- AMC contract for at least 5 years (panel cleaning, performance check, inverter health)
Frequently asked questions
How much PM-Surya Ghar subsidy can I get in New Delhi?
PM-Surya Ghar: Muft Bijli Yojana offers up to ₹78,000 for a residential rooftop solar system (₹30,000 per kW for the first 2 kW, ₹18,000 for the 3rd kW). Most households choose a 3 kW system to capture the full subsidy. Delhi residents apply through the national pmsuryaghar.gov.in portal — your DISCOM and the installer handle the rest.
What's the typical cost of a 3 kW system in New Delhi?
A 3 kW grid-connected residential rooftop system costs ₹1.8 lakh to ₹2.4 lakh installed (₹60,000 – ₹80,000 per kW). After the ₹78,000 PM-Surya Ghar subsidy, your net cost is ₹1.0 lakh to ₹1.6 lakh. Payback for a typical household in Delhi is 3.5 – 5 years; the panels carry a 25-year warranty.
Does Solar Universe India Pvt. Ltd. handle net-metering paperwork?
Reputable solar installers handle the net-metering and DISCOM application end-to-end — site survey, design, DISCOM application, installation, commissioning, and meter installation. Confirm with Solar Universe India Pvt. Ltd. when you call (098102 88787) or fill the Get Quote form above.
What panels and inverters does Solar Universe India Pvt. Ltd. typically install?
For PM-Surya Ghar eligibility, panels must be from approved manufacturers — typically Tier-1 brands such as Adani, Vikram, Waaree, Tata Power Solar, Premier Energies, or Loom Solar. Inverters are usually Growatt, Solis, Microtek, Polycab, or Luminous. Ask for the specific model and the 25-year linear-power warranty document.
How long does installation take?
Typical timeline: 3 days for site survey + design, 10–20 days for DISCOM approval, 1–2 days for installation, 7–15 days for net-meter installation and commissioning. End-to-end is 4–8 weeks for most residential installations in New Delhi.
Location
A- 50/2, Block A, Mayapuri Industrial Area Phase I, Mayapuri, New Delhi, Delhi, 110064, India
View on Google Maps →Opening hours
| Sunday | Closed |
|---|---|
| Monday | 10:00 – 18:30 |
| Tuesday | 10:00 – 18:30 |
| Wednesday | 10:00 – 18:30 |
| Thursday | 10:00 – 18:30 |
| Friday | 10:00 – 18:30 |
| Saturday | 10:00 – 18:30 |
