Solar World Jodhpur - Leading Solar Energy Company in Rajasthan

Rooftop solar installer in Jodhpur, Rajasthan. ★ 5.0 (33 Google reviews) Updated August 2026.

About

When considering solar integration, evaluating the local electricity tariff structure is a key factor in determining the return on investment. Residents and businesses in the Jodhpur area often find that the payback period is significantly influenced by the current rate of grid electricity consumption. The system is generally suited for property owners looking to offset a substantial portion of their daytime energy usage. Given the local tariffs, the return on investment is typically calculated against the average monthly consumption profile, allowing for a clearer projection of when energy savings will offset the initial system cost.

Get a quote from Solar World Jodhpur - Leading Solar Energy Company in Rajasthan

Solar World Jodhpur - Leading Solar Energy Company in Rajasthan hasn't yet confirmed lead notifications on GreenTax.in. Submit and we'll forward your enquiry to a verified active solar installer in Jodhpur.

Rooftop solar in Jodhpur, Rajasthan

A standard residential rooftop solar system in Jodhpur sizes between 1 kW and 5 kW depending on monthly consumption. Most Jodhpur homeowners pick a 3 kW system — it covers 300–400 units a month and captures the full ₹78,000 PM-Surya Ghar central subsidy.

Installed cost for a 3 kW system runs ₹1.8 lakh to ₹2.4 lakh; after the central subsidy your net outlay is ₹1.0 lakh to ₹1.6 lakh. Payback typically lands between 3.5 and 5 years — and the panels carry a 25-year warranty. Solar World Jodhpur - Leading Solar Energy Company in Rajasthan can quote your specific roof; use the Get Quote form above or call 091667 77790.

The installer handles the PM-Surya Ghar registration, DISCOM net-metering application, system installation, and commissioning. Confirm AMC terms, panel warranty (look for Tier-1 manufacturer + 25-year linear-power guarantee), and inverter warranty (10 years minimum) before signing.

What to check before booking

  • Site visit and shading analysis — this determines the realistic kW your roof can support
  • PM-Surya Ghar registration done on your behalf, with the ₹78,000 subsidy credited directly to your bank
  • DISCOM net-metering application and commissioning — installer should handle this end-to-end
  • Tier-1 panels with 25-year linear-power warranty (degradation ≤0.55% per year)
  • Inverter warranty (10 years minimum) and on-site replacement policy
  • AMC contract for at least 5 years (panel cleaning, performance check, inverter health)

Frequently asked questions

How much PM-Surya Ghar subsidy can I get in Jodhpur?

PM-Surya Ghar: Muft Bijli Yojana offers up to ₹78,000 for a residential rooftop solar system (₹30,000 per kW for the first 2 kW, ₹18,000 for the 3rd kW). Most households choose a 3 kW system to capture the full subsidy. Rajasthan residents apply through the national pmsuryaghar.gov.in portal — your DISCOM and the installer handle the rest.

What's the typical cost of a 3 kW system in Jodhpur?

A 3 kW grid-connected residential rooftop system costs ₹1.8 lakh to ₹2.4 lakh installed (₹60,000 – ₹80,000 per kW). After the ₹78,000 PM-Surya Ghar subsidy, your net cost is ₹1.0 lakh to ₹1.6 lakh. Payback for a typical household in Rajasthan is 3.5 – 5 years; the panels carry a 25-year warranty.

Does Solar World Jodhpur - Leading Solar Energy Company in Rajasthan handle net-metering paperwork?

Reputable solar installers handle the net-metering and DISCOM application end-to-end — site survey, design, DISCOM application, installation, commissioning, and meter installation. Confirm with Solar World Jodhpur - Leading Solar Energy Company in Rajasthan when you call (091667 77790) or fill the Get Quote form above.

What panels and inverters does Solar World Jodhpur - Leading Solar Energy Company in Rajasthan typically install?

For PM-Surya Ghar eligibility, panels must be from approved manufacturers — typically Tier-1 brands such as Adani, Vikram, Waaree, Tata Power Solar, Premier Energies, or Loom Solar. Inverters are usually Growatt, Solis, Microtek, Polycab, or Luminous. Ask for the specific model and the 25-year linear-power warranty document.

How long does installation take?

Typical timeline: 3 days for site survey + design, 10–20 days for DISCOM approval, 1–2 days for installation, 7–15 days for net-meter installation and commissioning. End-to-end is 4–8 weeks for most residential installations in Jodhpur.

Location

Shop no. 1, near Laxmi Narayan Mandir, Maderana Colony, Jodhpur, Rajasthan 342007, India

View on Google Maps →

Opening hours

Sunday09:00 – 17:00
Monday09:00 – 17:00
Tuesday09:00 – 17:00
Wednesday09:00 – 17:00
Thursday09:00 – 17:00
Friday09:00 – 17:00
Saturday09:00 – 17:00
Chat with us