Solarus Solar Energy

Rooftop solar installer in Nagpur, Maharashtra. ★ 4.8 (35 Google reviews) Updated June 2026.

About

Rooftop solar installations provide an option for generating decentralized electricity for residential and commercial properties. Customers seeking to integrate solar power into their existing grid connection must navigate the local distribution company's (DISCOM) net-metering requirements. Understanding the specific application process for the local utility is a key step in realizing solar energy savings. For property owners in the Nagpur area, the process involves submitting detailed documentation to the relevant DISCOM office to secure net-metering approval. The time frame for utility processing can vary based on the volume of applications received by the local authority. It is advisable for prospective installers to confirm the current processing timelines directly with the utility provider to manage project expectations accurately. The successful implementation of a solar system relies on aligning the technical scope of the installation with the utility's interconnection standards. Reviewing the local DISCOM guidelines early in the planning phase helps ensure that the system design meets all necessary grid compliance criteria before physical work commences.

Get a quote from Solarus Solar Energy

Submit your name + phone to reveal Solarus Solar Energy's contact and notify them. No spam, no obligation.

Rooftop solar in Nagpur, Maharashtra

A standard residential rooftop solar system in Nagpur sizes between 1 kW and 5 kW depending on monthly consumption. Most Nagpur homeowners pick a 3 kW system — it covers 300–400 units a month and captures the full ₹78,000 PM-Surya Ghar central subsidy.

Installed cost for a 3 kW system runs ₹1.8 lakh to ₹2.4 lakh; after the central subsidy your net outlay is ₹1.0 lakh to ₹1.6 lakh. Payback typically lands between 3.5 and 5 years — and the panels carry a 25-year warranty. Solarus Solar Energy can quote your specific roof; use the Get Quote form above or call 094049 10948.

The installer handles the PM-Surya Ghar registration, DISCOM net-metering application, system installation, and commissioning. Confirm AMC terms, panel warranty (look for Tier-1 manufacturer + 25-year linear-power guarantee), and inverter warranty (10 years minimum) before signing.

What to check before booking

  • Site visit and shading analysis — this determines the realistic kW your roof can support
  • PM-Surya Ghar registration done on your behalf, with the ₹78,000 subsidy credited directly to your bank
  • DISCOM net-metering application and commissioning — installer should handle this end-to-end
  • Tier-1 panels with 25-year linear-power warranty (degradation ≤0.55% per year)
  • Inverter warranty (10 years minimum) and on-site replacement policy
  • AMC contract for at least 5 years (panel cleaning, performance check, inverter health)

Frequently asked questions

How much PM-Surya Ghar subsidy can I get in Nagpur?

PM-Surya Ghar: Muft Bijli Yojana offers up to ₹78,000 for a residential rooftop solar system (₹30,000 per kW for the first 2 kW, ₹18,000 for the 3rd kW). Most households choose a 3 kW system to capture the full subsidy. Maharashtra residents apply through the national pmsuryaghar.gov.in portal — your DISCOM and the installer handle the rest.

What's the typical cost of a 3 kW system in Nagpur?

A 3 kW grid-connected residential rooftop system costs ₹1.8 lakh to ₹2.4 lakh installed (₹60,000 – ₹80,000 per kW). After the ₹78,000 PM-Surya Ghar subsidy, your net cost is ₹1.0 lakh to ₹1.6 lakh. Payback for a typical household in Maharashtra is 3.5 – 5 years; the panels carry a 25-year warranty.

Does Solarus Solar Energy handle net-metering paperwork?

Reputable solar installers handle the net-metering and DISCOM application end-to-end — site survey, design, DISCOM application, installation, commissioning, and meter installation. Confirm with Solarus Solar Energy when you call (094049 10948) or fill the Get Quote form above.

What panels and inverters does Solarus Solar Energy typically install?

For PM-Surya Ghar eligibility, panels must be from approved manufacturers — typically Tier-1 brands such as Adani, Vikram, Waaree, Tata Power Solar, Premier Energies, or Loom Solar. Inverters are usually Growatt, Solis, Microtek, Polycab, or Luminous. Ask for the specific model and the 25-year linear-power warranty document.

How long does installation take?

Typical timeline: 3 days for site survey + design, 10–20 days for DISCOM approval, 1–2 days for installation, 7–15 days for net-meter installation and commissioning. End-to-end is 4–8 weeks for most residential installations in Nagpur.

Location

Plot no 88, Omkar Nagar Square, Shukla nagar, Bhagwan Nagar, Nagpur, Maharashtra 440027, India

View on Google Maps →

Opening hours

SundayClosed
Monday09:00 – 19:00
Tuesday09:00 – 19:00
Wednesday09:00 – 19:00
Thursday09:00 – 19:00
Friday09:00 – 19:00
Saturday09:00 – 19:00
Chat with us